SLIDE 1
Elevating the Quality of Life in the District
LAFAYETTE ELEMENTARY SCHOOL MODERNIZATION SIT PROJECT UPDATE JULY 27, 2016
SLIDE 2 MEETING AGENDA
Elevating the Quality of Life in the District
- PROJECT UPDATE
- PLAYGROUND DESIGN REVIEW
- NEXT STEPS
- Q&A
Elevating the Quality of Life in the District
SLIDE 3 PROJECT UPDATES
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
- PARKING
- WORK HOURS
- Mon – Sat 7am – 7pm, 7pm – 12am Interior only
- Sundays 9am-6pm, Holidays as needed to maintain schedule
- After hours work details will be shared via email
- CONSTRUCTION UPDATE
- Schedule
- Progress
- Site Logistics Plans
- DESIGN UPDATE
SLIDE 4 ACTIVITY DESCRIPTION
MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV
INSTALL TRAILERS HAZMAT & BUILDING DEMO FOUNDATIONS STEEL ERECTION INSTALL BUILDLING ENVELOPE INSTALL INTERIOR WORK INSTALL ROOFTOP EQUIPMENT & UTILITIES SITEWORK PHASE 1 REMOVE TRAILERS FROM SITE SITEWORK PHASE 2
2015 2016
SCHEDULE OVERVIEW
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 5 CONSTRUCTION UPDATE
Photo date: July 2016
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 6 CONSTRUCTION UPDATE
Photo date: July 2016
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 7
SITE LOGISTICS PLANS
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 8 DESIGN UPDATE
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
- GARDEN
- LANDSCAPE PLAN
- LIGHTING CONTROLS
- GYM LOGO
SLIDE 9
GARDEN
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 10
LANDSCAPE PLAN
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 11 LIGHTING UPDATE
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
- EXTERIOR – All exterior lighting (except for the existing Washington Globes at the
playing field and the existing bollards at the west edge of the school site) are full cut-off downlights with 3000K or 3500K lamping.
- DOOR LIGHTS – Recessed, cylindrical sconce, and surface mounted
- downlights. At egress doors lights will be on all night.
- PATHWAY LIGHTS – New Bollards on occupancy sensors, Existing Bollards
connected to timer and turned off when building is unoccupied
- STEP LIGHTS, POLE LIGHTS - connected to timer and turned off when
building is unoccupied. Will turn on in an emergency
- PLAYING FIELD LIGHTS - on their old schedule, because they are not circuited
through the school.
- INTERIOR LIGHTING
- Classroom/ office, gym, multipurpose and library: off when the building is
- unoccupied. Select “Emergency” light fixtures will turn on in an emergency.
- Main corridor, stairway and hall lights have limited select fixtures that
remain on as emergency lighting
SLIDE 12
LIGHTING UPDATE
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 13
GYM LOGOS
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 14
PLAYGROUND – Previously existing
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 15
PLAYGROUND DESIGN
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 16
PLAYGROUND DESIGN - Pre-K
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 17
PLAYGROUND DESIGN – Pre-K
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 18
PLAYGROUND DESIGN – Pre-K
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 19
PLAYGROUND DESIGN - Kindergarten
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 20
PLAYGROUND DESIGN – Kindergarten
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 21
PLAYGROUND DESIGN – Kindergarten
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 22
PLAYGROUND DESIGN – 1st – 3rd Grade
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 23
PLAYGROUND DESIGN – 1st – 3rd Grade
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 24
PLAYGROUND DESIGN – 1st – 3rd Grade
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 25
PLAYGROUND DESIGN – 4th – 5th Grade
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 26
PLAYGROUND DESIGN – 4th – 5th Grade
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 27
PLAYGROUND DESIGN – 4th – 5th Grade
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 28 NEXT STEPS & PROJECT SCHEDULE
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
- August 8th, 2016 – SIT Tour of Modernized Lafayette ES
- August 15th, 2016 Teachers return
- August 22nd, 2016 First Day of School
- July – August 2016 - Trailer disconnection & removal
- Fall 2016 – Playgrounds and Site work complete
SLIDE 29
Comments / Questions / Answers
Elevating the Quality of Life in the District Elevating the Quality of Life in the District
SLIDE 30