Kick-starting the Greek e-Mobility market Konstantinos Magkaniotis - PowerPoint PPT Presentation

Kick-starting the Greek e-Mobility market Konstantinos Magkaniotis Hellenic Distribution Network Operator HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr E-mobility in Greece Public accessible EVSEs < 65


  1. Kick-starting the Greek e-Mobility market Konstantinos Magkaniotis Hellenic Distribution Network Operator HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr

  2. E-mobility in Greece • Public accessible EVSEs < 65 – only in privately owned areas source https://chargemap.com/map# – Charging anxiety • 2017: 163 EVs registered – Yearly increase 246% – 0.2% market share – EV charging infrastructures not attractive for investment • 2014/94/EC: Each MS shall have a sufficient public network HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr of EVSEs

  3. E-Mobility market enablers EV Models Incentives (Financial/ non- EV Charging financial) Infrastructure HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr

  4. The Plan Goal: Kick-start the EV market – Create EV charging infrastructure • On publicly-owned, public-accessible space – Remove charging anxiety – Create an open e-mobility market HEDNO benefits • Study the effects of EV charging on the Hellenic distribution network • Prepare HEDNO for upcoming technical and regulatory issues: HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr –

  5. Proposed “DSO Model” HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr

  6. EVSE Infrastructure: Plan Phase A Phase B - Pilot Implementation EV Charging Points: EV Charging Points: • • 1420 Mode 3 2x22kW 100-150 Mode 3 2x22kW • 80 Mode 4 DC 50kW Islands 1M € Mainland 9M € Implementation: 2019 Implementation: 2019-2020 HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr

  7. Status • RAE approved the pilot (Islands) Charging Station • Public consultation (specs) – 23.01.2018 – 23.02.2018 – Participation of 8 companies • Public Tender AC Supply – appeal of a participant at the Council of State ( ΣτΕ ) • Specification at a glance • Mode 3 AC, 2x22kW (3P), Type 2 HEDNO Meter • OCPP 1.6 Socket Meter • ΕΝ/ IEC 61851:2017 HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr • RFID, NFC, ad-hoc charging

  8. Spatial Planning • Phase A, islands – Based on population and size – In collaboration with municipalities • Quantification of minimum required infrastructures – 10.2018 – to enable market to evolve – Number of EVSE per municipality • Focus: – AC Mode 3 – urban connectivity – DC Mode 4 – suburban connectivity HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr

  9. Than ank yo you u for yo your ur at attenti ention on! Konstantinos Magkaniotis Sub- Head of Metering Systems T. +30 210 9090882 E-mail: k.magkaniotis@deddie.gr HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR S.A. https://www.deddie.gr

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.