Kenneth G. Kenneth G. Langone Langone Athletic and Recreation Athletic and Recreation Center Center
Kyle Oberdorf Kyle Oberdorf Structural Option Structural Option Thesis Thesis April 2007 April 2007
Kenneth G. Langone Langone Kenneth G. Athletic and Recreation - - PowerPoint PPT Presentation
Kenneth G. Langone Langone Kenneth G. Athletic and Recreation Athletic and Recreation Center Center Kyle Oberdorf Kyle Oberdorf Structural Option Structural Option Thesis Thesis April 2007 April 2007 Presentation Outline Presentation
Kyle Oberdorf Kyle Oberdorf Structural Option Structural Option Thesis Thesis April 2007 April 2007
Introduction
Existing Structural System
Problem Statement
Problem Solution
Depth Study
– – Alternative System Design Alternative System Design
Breadth Study
– – LEED Certification LEED Certification – – Natatorium Duct Redesign Natatorium Duct Redesign
Conclusion
Acknowledgements
Kyle Oberdorf Kenneth Langone Athletic and Recreation Center
– – 2 2” ” 20 Gauge Composite Steel 20 Gauge Composite Steel Decking Decking – – 4 4 ½ ” ½ ” Normal Weight Concrete Normal Weight Concrete – – ¾ ” ¾ ” Diameter 5 Diameter 5” ” Long Shear Long Shear Studs Studs
Kyle Oberdorf Kenneth Langone Athletic and Recreation Center
– – Engineered Lumber Arched Roof Beam Engineered Lumber Arched Roof Beam – – Engineered Lumber Columns Engineered Lumber Columns – – Engineered Lumber Floor Girders and Beams Engineered Lumber Floor Girders and Beams – – Poured Concrete Floor on Metal Decking Poured Concrete Floor on Metal Decking
Kyle Oberdorf Kenneth Langone Athletic and Recreation Center
– – Span: 123 Span: 123’ ’ 8 8” ”
– – Span: 158 Span: 158’ ’ 10 10” ”
– – 20 gauge Architectural Metal Sheet Roofing over 20 gauge Architectural Metal Sheet Roofing over 5 5” ” of Rigid Insulation on 18 gauge Steel Decking
– – Loads ( Loads (psf psf) )
Roofing 13
Snow 30
Wind 25
Kyle Oberdorf Kenneth Langone Athletic and Recreation Center
19” ” x 29 x 29” ” Southern Pine 30F Southern Pine 30F-
E2 Beams
18” ” x 29 x 29” ” Southern Pine 30F Southern Pine 30F-
E2 Girders
Oversized to meet 2 hour fire rating
– – Identical Erection Time Identical Erection Time – – Wood has a longer production time Wood has a longer production time
Steel Wood Beam $14500.00 $15900.00 Column $3700.00 $2100.00
– – 44 44” ” Dia
. Supply – – 2 2” ” Dia
. Holes
– – 66 66” ” Dia
. Supply – – 2 2” ” Dia
. Holes