july 26 2011
play

July 26, 2011 Jerry Wray, Director Joe Rutherford, District Deputy - PowerPoint PPT Presentation

July 26, 2011 Jerry Wray, Director Joe Rutherford, District Deputy Director Includes Coshocton Fairfield Guernsey Knox Licking Muskingum Perry 3,731 Lane


  1. July 26, 2011 Jerry Wray, Director Joe Rutherford, District Deputy Director

  2. ������������������ � Includes � Coshocton � Fairfield � Guernsey � Knox � Licking � Muskingum � Perry � 3,731 Lane Miles of roadway

  3. ���������������������������� ������ � Julie Gwinn, P.E. is the District Highway Management Administrator � Dave Slatzer, P.E. is the Planning and Engineering Administrator � Keith Geiger, P.E. is the District Construction Engineer

  4. ���������������������������� ������ � Michelle Croom is the Public Information Officer � Randy Comisford is the LPA Coordinator

  5. ������������������������������ D12, 1,775 D11, 3,275 D1, 3,288 4.2% 9.3% 7.7% D2, 3,271 7.7% D10, 3,940 8.6% D3 4,146 9.7% D9, 3,667 8.6% D4 4,011 9.4% D8, 3,469 8.1% D7, 4,031 D5, 3,731 9.5% D6, 4,218 8.7% 9.9%

  6. ������������������������������� ������ PER-374 mi. COS-463 mi. 10% 12.4% FAI-463 mi. Mus-675 mi. 12.4% 18.1% GUE-615 mi. Lic-726 mi. 16.5% 19.5% Kno-415 mi. 11.1%

  7. ���������������������� � FY 2010 – ODOT sold $2.093B in construction projects (ODOT and Local Let) – ARRA infusion � District 5 - $64.06M total; 3.1% of Statewide spending � 1157 projects sold Statewide � District 5 - 75 projects; 6.5% of Statewide total

  8. ���������������������� � FY 2011 – ODOT has sold, or will sell, $1.868B (ODOT and Local Let) � District 5 - $66.4M; 3.6% of Statewide totals � 940 projects sold Statewide � District 5 - 54 Projects; 5.7% of Statewide total

  9. ���������������������� � FY 2012 – ODOT is currently scheduled to sell $1.528B (ODOT and Local Let) � District 5 – Projected budget is $63.3M; 4.1% of Statewide spending � 685 projects Statewide � District 5 - 47 Projects; 6.7% of total Statewide

  10. �������������� !! � District 5 has awarded or will award 47 projects � FRA 33 culvert replacement included � Current estimate is $77.8M � FRA 33 culvert replacement included

  11. �������������� !! � Project breakdown by size � < $500k: 19 � $500k - $1M: 8 � $1M - $2.5M: 7 � $2.5M - $5M: 11 � >$5M: 2 � Allows for contractors of all sizes to bid on work

  12. �������������� !! ���"�����#����"���$��%����� � Project breakdown by major work type � Roadway/resurfacing: 24 � Bridge: 12 � Safety (includes maintenance projects like guardrail, striping, etc.): 11 � Balanced to improve general pavement and bridge conditions

  13. �������������� !! ���"����&�#����"���$��%����� � Project breakdown by major work type � Roadway/resurfacing: $50.7MM � Bridge: $7.7M � Safety: $19.4MM � Balanced to improve general pavement and bridge conditions

  14. ����������������� !! ���"�����#�������� FAI-3, 7.1% Maintenance-11 COS-1, 2.4% 26.2% GUE-5, 11.9% PER-4, KNO-4, 9.5% 9.5% LIC-9, 19% MUS-8, 19%

  15. ����������������� !! & #�������� Maintenance FAI $11.6M $4.4M COS $200k, .3% 16.1% 6.1% PER $4.9M GUE $7.5M 6.8% 10.5% KNO $4.6M 6.4% MUS $21.4M LIC $16.7M 29.7% 23.2%

  16. � !!����"����������'������������ � SR 60 Bridge Replacement Project � Approx. 2 mi. south of Warsaw � Cost: $194,979 � Contractor: Bud’s, Inc. � Estimated start date: 6/1/11 � Estimated completion date: 9/30/11

  17. ����� !!����"������������(����� ������ � Pickerington/Violet Twp. Sidewalk Project � Cost: $279,991 � Contractor: Trucco Construction Co. � Estimated completion date: 8/31/11

  18. ����� !!����"������������(����� ������ � Fairfield & Perry County � SR 37 Resurfacing Project � From SR 664 to New Lexington � Cost: $2.571MM � Contractor: The Shelly Company � Estimated completion date: 10/15/11

  19. ����� !!����"������������(����� ������ � Fairfield & Licking County � IR 70 Resurfacing Project � From Franklin County to SR 158 � Nighttime Resurfacing � Cost: $8 MM � Start date: 7/11/11 � Estimated completion date: 10/31/11

  20. �������"��������)�������������� � Cambridge US 22/40 � From 5 th St. to IR 77 � Cost: $3.5MM � Contractor: Shelly & Sands � Lighting and signal upgrades, decorative sidewalks, pavement resurfacing � Estimated start date: 5/1/11 � Estimated completion date: 10/31/11

  21. �������"��������)�������������� � SR 285 Resurfacing � From Noble County to SR 265 and Old Washington to US 22 � Estimated Cost: $1.877MM � Estimated start date: 7/5/11 � Estimated completion date: 10/15/11

  22. �������"��������)�������������� � SR 265 Resurfacing � From SR 147 in Belmont County, through Noble County to SR 285 � Estimated Cost: $1.993MM � Estimated start date: 7/5/11 � Estimated completion date: 10/15/11

  23. ����� !!����"�����������*������� � US 36 Resurfacing � From Upper Gilchrist Rd. to Coshocton County � Cost: $3.003M � Contractor: Kokosing Construction Co. � Estimated start date: June � Estimated completion date: 10/15/11

  24. ����� !!����"�����������*������� � “Heart of Ohio” Trail Phase 2 � From Updike Road to Bishop Road northeast of Centerburg � Cost: $481,786 � Contractor: Park Enterprise Construction Co. � Estimated start date: 5/1/11 � Estimated completion date: 10/15/11

  25. ����� !!����"�����������*������� � State Route 3 Bridge Repair � 2 miles north of Amity � Estimated Cost: $926k � One lane of traffic to be maintained � Estimated start date: 6/1/11 � Estimated completion date: 10/31/11

  26. ����� !!����"�����������*������� � State Route 95 Bridge Replacement � .31 miles north of Zolman Road � Cost: $985,544 � Contractor: Shelly & Sands � 70 day maximum closure � Detour via SR 97 and SR 13 � Estimated start date: 6/1/11 � Estimated completion date: 10/15/11

  27. ����� !!����"��������+��%��,������� � Village of Johnstown � SR 62/37 Intersection Improvements � Lengthen turn lanes, upgrade signals � Contractor: Complete General � Cost: $808k � Estimated start date: 6/15/11 � Estimated completion date: 10/15/11

  28. ����� !!����"��������+��%��,������� � Newark SR 16 � Improve Cedar St. interchange � Redeck 3 bridges � 10 day ramp closure � Estimated Cost: $2.195MM � Estimated start date: 6/15/11 � Estimated completion date: 9/30/12

  29. ����� !!����"��������+��%��,������� � Heath SR 79 from 30 th St. to Hopewell � Widen, resurface and install center median � Upgrade traffic signals � Estimated Cost: $4.115MM � Estimated start date: 6/15/11 � Estimated completion date: 10/31/12

  30. �������"��������+��%��,������� � Resurface SR 13 from Waterworks Rd. to Utica � Estimated Cost: $3.847MM � Estimated start date: 8/28/11 � Estimated completion date: 10/31/11

  31. �������"��������+��%��,-����(����� ������ � Resurface SR 37 from I-70 to Lancaster Corp. � Estimated Cost: $3.683MM � Estimated start date: 9/01/11 � Estimated completion date: 10/31/11

  32. �������"�����������%��,��������� � Resurface SR 60 from Duncan Falls to SR 146 in Zanesville � Estimated Cost: $5.055MM � Estimated start date: 7/05/11 � Estimated completion date: 10/31/11

  33. ����� !!����"�����������%��,��� ������ � Resurface SR 60 (Maple Avenue) from Adair Ave. to Fairview Rd. � Estimated Cost: $3.926MM � Estimated start date: 8/01/11 � Estimated completion date: 10/31/11

  34. �������"�����������%��,��������� � Resurface SR 146 from SR 586 to east corp. limit of Zanesville � Cost: $2.729MM � Contractor: The Shelly Company � Start date: 5/01/11 � Estimated completion date: 8/31/11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend