Joint PP&J and Project (Jail) Review Committee Update Dane County Jail Consolidation Project South Tower Addition & Public Safety Building Renovation October 29, 2019 DCPW Project #318003 AGENDA Introductions Project Goals


slide-1
SLIDE 1

Joint PP&J and Project (Jail) Review Committee Update

Dane County Jail Consolidation Project

South Tower Addition & Public Safety Building Renovation

October 29, 2019 DCPW Project #318003

slide-2
SLIDE 2

AGENDA

  • Introductions
  • Project Goals
  • Project Schedule
  • Project Design Updates
  • City Approval &

Community Engagement

  • Next Steps
  • Questions
slide-3
SLIDE 3

Project Goals Checklist

South Tower Addition Option CCB & PSB Renovation & Greenfield Site Option PSB Renovation & Greenfield Site Option All Green Opt Provide one consolidated jail facility Replace the outdated cell blocks in CCB Provide appropriate medical/mental health space Eliminate/greatly reduce solitary confinement Provide visitation at the housing units Provide multipurpose space to meet spiritual needs of inmates Provide a downtown location close to the courthouse/bus Reduce total number of beds Improve staffing and operational costs Minimize impact to existing operation during construction Replace the Ferris Center

slide-4
SLIDE 4

Project Schedule

slide-5
SLIDE 5

Project Update – Schematic Design Progress

  • Multiple User & Stakeholder Design Workshops & Meetings
  • Design Layouts, Exterior Design, Interior Design, Structural

and Utility Systems Engineering

  • Visits & Evaluations of Existing Jail Facilities to Inform

Design

  • Meeting with & Evaluating Detention Equipment (DEC) &

Security Electronics (SEC) Contractors / Vendors

  • Planning for Prefabricated Modular Steel Cells
  • Started City Approval & Community Engagement Process
  • Building DCSO Transition Team
  • Studying Options for relocating Courthouse Electrical

Service / Vault

slide-6
SLIDE 6

Project Update – Schematic Design Progress

4th Floor Concept Plan 4th Floor Schematic Design Plan

slide-7
SLIDE 7

Project Update – Schematic Design Progress

Jail visit to see

  • pen booking
slide-8
SLIDE 8

Project Update – Schematic Design Progress

Prefab Cell Factory Visit

slide-9
SLIDE 9

Project Update – Schematic Design Progress

Prefab Cell Factory Visit

slide-10
SLIDE 10

Project Update – Schematic Design Progress

Prefab Cells

  • n trucks.
slide-11
SLIDE 11

Project Update – Schematic Design Progress

Prefab Cells

slide-12
SLIDE 12

Project Update – Schematic Design Progress

Normalized Prefab Cell

slide-13
SLIDE 13

Project Update – Schematic Design Progress

Installation of Prefab Cells

slide-14
SLIDE 14

Project Update – Schematic Design Progress

Installation of Prefab Cells

slide-15
SLIDE 15

Project Update – Schematic Design Progress

Detention Door Factory Visit

slide-16
SLIDE 16

Project Update – Schematic Design Progress

Detention Plumbing Fixture Factory Visit

slide-17
SLIDE 17

Project Update – Schematic Design Progress

Water Management Control System Door Controls (SEC)

slide-18
SLIDE 18

Project Update – Schematic Design Progress

SB2

Existing Courthouse Electrical Vault Under Garage Ramp

slide-19
SLIDE 19

Project Update – Schematic Design Progress

Existing Courthouse Electrical Vault Under Garage Ramp

slide-20
SLIDE 20

Project Update – Schematic Design Progress

Site & Exterior Design

slide-21
SLIDE 21

Project Update – Schematic Design Progress

slide-22
SLIDE 22

Project Update – Schematic Design Progress

slide-23
SLIDE 23

Project Update – Schematic Design Progress

slide-24
SLIDE 24

Project Update – Schematic Design Progress

slide-25
SLIDE 25

Project Update – Schematic Design Progress

slide-26
SLIDE 26

Project Update – Schematic Design Progress

slide-27
SLIDE 27

Project Update – Garage Access Ramps to Courthouse and PSB

slide-28
SLIDE 28

Project Update – View from Southeast along Wilson Street

slide-29
SLIDE 29

Project Update – Schematic Design Progress

slide-30
SLIDE 30

Project Update – Schematic Design Progress

slide-31
SLIDE 31

Project Update – Schematic Design Progress

slide-32
SLIDE 32

Project Update – Schematic Design Progress

Visitation

slide-33
SLIDE 33

Project Update – Visitation

slide-34
SLIDE 34

Project Update – Schematic Design Progress

1

slide-35
SLIDE 35

Project Update – Schematic Design Progress

1

slide-36
SLIDE 36

Project Update – Schematic Design Progress

3

slide-37
SLIDE 37

Project Update – Schematic Design Progress

6

slide-38
SLIDE 38

Project Update – Schematic Design Progress

Medical & Mental Health

slide-39
SLIDE 39

Project Update – Schematic Design Progress

4

slide-40
SLIDE 40

Project Update – Schematic Design Progress

Male Medical Housing

4

slide-41
SLIDE 41

Project Update – Medical & Mental Health

slide-42
SLIDE 42

Project Update – Schematic Design Progress

4

Medical Clinic

slide-43
SLIDE 43

Project Update – Schematic Design Progress

4

Female Medical and MH Housing

slide-44
SLIDE 44

Project Update – Schematic Design Progress

Multi-Purpose Spaces for Programming, Education, Spiritual, and Recreation

slide-45
SLIDE 45

Project Update – Schematic Design Progress

Recreation

2

Multi-Purpose Education (High School) Recreation Programs Programs

slide-46
SLIDE 46

Project Update – Schematic Design Progress

Recreation Multi-Purpose Recreation

6

Multi-Purpose Programs Programs

slide-47
SLIDE 47

Project Update – Schematic Design Progress

slide-48
SLIDE 48

Project Update – Schematic Design Progress

General Population Housing

slide-49
SLIDE 49

Project Update – Schematic Design Progress

6M, 7M, 8M 6, 7, 8

slide-50
SLIDE 50

Project Update – Schematic Design Progress

6, 7, 8

slide-51
SLIDE 51

Project Update – General Population Housing (6th, 7th and 8th Floors)

slide-52
SLIDE 52

Project Update – Schematic Design Progress

6M, 7M, 8M

slide-53
SLIDE 53

Project Update – Schematic Design Progress

Interior Design Concepts

slide-54
SLIDE 54

Project Update – Schematic Design Progress

VISIT A TION FOOD DINING ST AFF SEATING EXERCISE

slide-55
SLIDE 55

Project Update – Schematic Design Progress

BIOPHILIC DESIGN

“IT IS INHERENT IN HUMANS TO HAVE A CONNECTION & NEED FOR THE NATURAL WORLD”

  • BIOPHILIC DESIGN SEEKS TO PROVIDE THAT CONNECTION TO NATURE THAT

HUMANS CRAVE IN THE BUILT ENVIRONMENT.

  • HOW TO IMPLEMENT:
  • VIEW OF NATURAL ELEMENTS FROM WITHIN THE INTERIOR ENVIRONMENT
  • NATURE-INSPIRED TEXTURES, SHAPES, AND PATTERNS
  • VARYING LIGHT INTENSITIES OVER TIME THAT SIMULATE THE NATURAL CYCLE OF

DAY AND NIGHT

  • INTERACTION WITH NATURE THROUGH OTHER SENSES: SOUND, TOUCH & SMELL
slide-56
SLIDE 56

Project Update – Schematic Design Progress

CREATING A HEALTHY ENVIRONMENT

“THESE ARE PEOPLE WHO STUMBLED IN LIFE AND WE SEND THEM OFF IN THE BEST SHAPE THEY CAN.”

FOCUS ON AN ENHANCED ENVIRONMENT TO SUPPORT COMMUNITY AND REDUCE STRESS WHILE IMPROVING WELLNESS FOR INMATES AND STAFF HOW TO IMPLEMENT: ENVIRONMENTS THAT MIMIC NATURE HAVE BEEN PROVEN TO INCREASE OVERALL HEALTH AND WELL-BEING AS WELL AS REDUCE STRESS LEVELS CREATE A CALMING ENVIRONMENT WITH CLEAN VISUAL FIELDS AND SOOTHING COLORS APPROPRIATE USE OF MATERIALS AND DETAILS THAT ARE DURABLE, SAFE AND CLEANABLE

slide-57
SLIDE 57

Project Update – Schematic Design Progress

RED GREEN

ENERGY, STRENGTH, MOTIVATION, CONFIDENCE, COURAGE BALANCE, HARMONY, SELF-ACCEPTANCE, RENEWAL

COLOR PROMOTES

COLOR THEORY

VIOLET

INSPIRATION, EMPATHY, SELF RESPECT, TRANQUILITY

BLUE

CALMNESS, RELAXATION, HONESTY, TRUTH, CREATIVITY

AQUA

HEALING, SHARING, FRIENDSHIP, RESILIENCE, HARMONY

ORANGE

SELF- ESTEEM, OPTIMISM, HAPPINESS, INNER STRENGTH

YELLOW

UPLIFTING, MENTAL STIMULATION, SELF-CONFIDENCE, CONTENTMENT

slide-58
SLIDE 58

Project Update – Schematic Design Progress

slide-59
SLIDE 59

Project Update – Schematic Design Progress

slide-60
SLIDE 60

Project Update – Schematic Design Progress

slide-61
SLIDE 61

Project Update – Schematic Design Progress

City Approval & Community Engagement

slide-62
SLIDE 62

City of Madison Review & Approval & Community Engagement Process

WORKPLAN EXAMPLE

slide-63
SLIDE 63

City of Madison Review & Approval Process

  • Meetings held with Fire Department, City Zoning, Planning and

Development Assistance Team

  • First UDC Submittal was sent in October
  • First UDC Informational Meeting is in October
  • Second UDC Submittal (Exterior Design) target is end of

November

  • Next UDC Informational Meeting target is early December
  • UDC GDP/SIP Submittal target is January 2020
  • UDC GDP/SIP Meeting target is March 2020
  • City Plan Commission target is March 2020
  • Commons Council Final Approval target is March 2020

Note: If additional UDC informational Meetings are needed, City approval will push out to April or May of 2020.

slide-64
SLIDE 64

Community & Neighborhood Engagement Process

  • Meeting held with City Alder Mike Verveer
  • CNI Bassett District Meeting is in November
  • Public Notice (Postcards sent by City) Meeting target

date is in December Note: Additional neighborhood meetings will be held as established with CNI Bassett District Committee.

slide-65
SLIDE 65

Project Update – Schematic Design Progress

Next Steps

slide-66
SLIDE 66

Next Steps 2019 & 2020

November Issue & Review Schematic Design Phase Documents Complete Cost Estimates Update Staffing Plan Confirm Project is on Budget 11/19/19 Schedule Next PP&J PRC Joint Meeting (Exterior Focus) Dec to May Complete Design Development Additional PP&J PRC Joint Meetings (Dates TBD) June to Dec Complete Construction Documents for Bidding

slide-67
SLIDE 67

Additional Next Steps 2020

Jan to Mar Prepare RFP for DEC (Prefab Cells) & SEC Design Assist Dec to Mar Prepare Early Package CDs for Relocation of Courthouse site electrical vault / service April to Dec Bid, Award and Construct Courthouse Site Electrical Service (Get ramp vault out of the way.)

slide-68
SLIDE 68

Next Steps 2021-2024

Q1/Q2 - 2021 Bid & Award Q2/Q3 - 2021 to Q2/Q3 - 2023 South Tower Construction Q3 - 2023 Move Out of PSB Jail Areas & Open Jail Tower 2023? - 2024 PSB Renovation Construction

slide-69
SLIDE 69

Questions?

slide-70
SLIDE 70

Benefits of Prefabricated Modular Construction

  • Improves quality of finished cells – better long-lasting

finishes that are safer, more secure and more humane.

  • Improves cost and schedule control.
  • Improves safety – built offsite within a factory-controlled

environment.

  • Improves access to skilled labor.
  • Improves design coordination with engineering systems.
  • Improves overall constructability of project.
  • Improves overall project risk mitigation: Tight downtown

site with minimal staging and laydown areas and reduces impact to existing PSB DCSO operations, roads and City. Note: Bringing this vendor on as early in design along with the DEC will get us the best outcomes for this project.

slide-71
SLIDE 71

Thank you.