75 Wells & Associates LLC Jami Milanovich Senior Associate Transportation Study Scope Components 1. Vehicles 2. Pedestrians 3. Transit 4. Loading 5. Transportation Demand Management 76 Timeframes A. Existing Conditions B. 2010


slide-1
SLIDE 1
slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11

75

Jami Milanovich

Senior Associate Wells & Associates LLC

slide-12
SLIDE 12

76

Transportation Study Scope

Components

1. Vehicles 2. Pedestrians 3. Transit 4. Loading 5. Transportation Demand Management

slide-13
SLIDE 13

77

Timeframes

  • A. Existing Conditions
  • B. 2010 Conditions without the Proposed

Development

  • C. 2010 Conditions with the Proposed

Development

slide-14
SLIDE 14

Scope

Site

slide-15
SLIDE 15

Functional Classification

Principal Arterial Minor Arterial Collector

Site

slide-16
SLIDE 16

Transit Routes

Site Metrobus Maryland Commuter DC Circulator Kennedy Center Shuttle

slide-17
SLIDE 17

Existing Intersection Levels of Service

All intersections operate at overall acceptable levels of service (‘D’ or better) during the AM and PM peak hours except: Washington Circle/K Street (eastbound) (#3) 24th Street/Pennsylvania Avenue (#24)

Site

Overall LOS D or better Overall LOS E or better Overall LOS F or better

slide-18
SLIDE 18

Site Analysis

Trip Generation

200 400 600 800 AM PM Peak Hour Site Trips (VPH) Residential Office Retail GW

450 689

slide-19
SLIDE 19

Future Conditions – Intersection Levels of Service

Without Proposed Development With Proposed Development & Mitigation

Site Site

slide-20
SLIDE 20

Proposed Mitigation Measures

  • 23rd Street / F Street / Virginia

Avenue westbound (#10)

  • Adjust AM peak hour signal

timings 22nd Street / I Street (#15)

  • Install traffic signal and restrict

parking on south side of I Street 24th Street / Pennsylvania Avenue (#24)

  • Adjust AM and PM peak hour

signal timings

Site

slide-21
SLIDE 21

85

Transportation Demand Management

  • Transit Incentives
  • Information Dissemination
  • Telecommuting Incentives
  • Carpooling Incentives
  • Parking for Car Sharing
  • Bicycle Storage
slide-22
SLIDE 22

86

Truck Management Plan

  • On-site Loading
  • Trucks Enter and Exit Front First
  • Loading Dock Coordinator
  • Provide Preferred Truck Circulation Route
slide-23
SLIDE 23

87

Conclusions

  • The impact of the proposed development

can be offset with the proposed transportation improvements

  • TDM Program
  • Truck Management Plan