Introduction and Scope of Work Overview Lower Yakima Valley Groundwater Advisory Committee July 18, 2013 1 Our Team 2 Our Team Lower Yakima Valley Groundwater Advisory Committee Project Manager Jay Decker, PE Scope of Work #2 Lead


  1. Introduction and Scope of Work Overview Lower Yakima Valley Groundwater Advisory Committee July 18, 2013 1

  2. Our Team 2

  3. Our Team Lower Yakima Valley Groundwater Advisory Committee Project Manager Jay Decker, PE Scope of Work #2 Lead Scope of Work #1 Lead Steve Swope, LHG Mike Murray, PhD Senior Review Senior Technical Advisors Charles “Pony” Ellingson, LHG Clint Schock, PhD Bob Stevens, PhD Optional Task: Land use mapping, deep soil sampling 3

  4. Jay Decker, PE Project Manager • Grew up and worked on a farm in Southern Idaho • Currently located in Pasco, WA • Managed nutrient loading in land application of waste to agricultural land • Owner and consultant experience • Project Role: – Local point of contact – Facilitation 4

  5. Mike Murray, Ph.D. Soil Scientist Scope of Work #1 Lead • 21 years of experience in nitrogen cycle management • Experienced in working with stakeholder groups on complex environmental issues • Available to support GWAC long-term • Project Role – Lead Scope of Work #1: Nitrate Regulatory Framework and Best Management Practices 5

  6. Project Approach to Scope of Work #1 Nitrate Regulatory Framework and Best Management Practices 6

  7. Objectives • Identify local, state, and federal regulations, policy, and guidance on control and management of nitrates for groundwater protection • Identify BMPs and create database • Evaluate effectiveness of BMPs Policy and BMPs Regulations • Develop consensus based BMPs Effective- ness Consensus 7

  8. Task 1: Regulatory Review • Approach: – Lower Yakima Valley Groundwater Quality Preliminary Assessment and Recommendation Document (Ecology 10-10-009), Table 3 (sources), water quality protection, permits, dairies, CAFOs, septic system, etc. – Technical Memorandum #1 • Obtain GWAC, agencies, and stakeholder input GWAC to select agency and stakeholder review 8

  9. Task 2: Develop BMP Database • Compile BMPs developed by local, state, and federal agencies (e.g. WDOE’s Irrigation Management Practices). Include information on effectiveness • Create database of BMPs: BMP type, description, references, effectiveness, use in GWMA, etc. • Database review by GWAC 9

  10. Nitrogen Management BMPs Nutrient Crop Irrigation Soil Management Management Management Management Groundwater Protection 10

  11. 11

  12. BMP Effectiveness (Task 3) Technical GWAC Aspects Acceptance Implementable 12

  13. Task 3: BMP Effectiveness Evaluation • BMP Technical Aspects: – GWMA goals – Type and watershed location – Current level of implementation – Capital and O&M costs – Implementation and maintenance – Monitoring – Limitations (impacts) • Prepare Draft BMP Technical Effectiveness Evaluation Summary (Tech memo #2) Discussion with research centers and others 13

  14. Task 3: BMP Effectiveness Evaluation (continued) • GWAC Input Workshop #1 – Focused on regulatory, funding, and social aspects. • How does BMP fit into current regulatory framework? • Acceptability • Implementation: financial and technical • Finalize Tech Memo #2 14

  15. Task 4: Report and Presentations • Draft Final Report (Draft #1) – Compilation of Technical Memorandums #1 and #2, and GWAC comments, and Workshop #1 • Hold workshop (Workshop #2) – Present findings – Answer questions – Prioritization of BMPs of GWAC interest • Revise Draft Final Report (Draft #2) (includes prioritization) for GWAC review and comment • Final Report • Presentation 15

  16. Summary of Tasks and Deliverables • Task 1 Regulatory Review – Tech Memo #1(draft and final) • Task 2 BMP Database – Summary and database • Task 3 BMP Effectiveness – Technical Evaluation (the science) • Tech Memo #2 (draft) – Workshop #1 (socio-economics and regulatory) – Final Tech Memo #2 • Task 4 Report and Presentation – Draft Final Report (draft #1) – Workshop #2 (prioritize BMPs) – Update Draft Final Report (draft #2) – Final Report – Presentation • 16 16

  17. ������������������������ ����������������������������� ���������������������������� July 18, 2013

  18. ��������������� ��������������� �������������������������������������������� �� • !"���������#��������$����%�����������������%������������� • ����&���%�����'#������������%������������� ������ ���������(�)���������������������*�+�������������� • �������� ��������������������������������"����������������,������ • -����& )�� ��#�����������������"�������� • .�/�,�����!"�������� • Lower Yakima Valley GWMA – Slide 18

  19. ������������� �!���������� "��������� #������� �*�,�����#��������������-����&%����� �����#����#������ ��& • 0/���������������%���������#����� ������������� • )�� ��#�������������1�����������&��� • 2��� �����3�� ���������� ���� • �����������!"�������� • )���4������������������ • Lower Yakima Valley GWMA – Slide 19

  20. ���$$��������%�$��������������� )������ ��� 5 ���������"������� • ����� 6�������5 ����'#����#����� ���&� • )������������5 ,�������������� • 6����-���7 ��� 5 8��������������� • ��&���3�������5 )�� • Lower Yakima Valley GWMA – Slide 20

  21. �������$����� Defensible Data, Informed GWAC Existing Data PGG Team and GWAC Feedback Analyses Field Work Lower Yakima Valley GWMA– Slide 21

  22. ������� ���&����#���&���� ���&����#����'����(���#���&��� � !"���������#�������� �"�����������$���������38� WDOH USEPA � 9������������ � !���$�������$������ �� ��� Yakima County � ���� ��������������'�������� ������� ���� � ���� ���������������� �������� MS Access Database Lower Yakima Valley GWMA– Slide 22

  23. ������� ���&����#���&���� #�)�����*���������� • 3���������!"�������:��2���� • �������������� • ������������� • 1�$������&����� Lower Yakima Valley GWMA– Slide 23

  24. ������� ���&����#���&���� ��������#��������������� �����#�������������#�����#���� ������ • 8�����������������������������������������������#�����; ����&����� • Criteria Well Data Lower Yakima Valley GWMA– Slide 24

  25. ������� ���&����#���&���� +���%�����$������� Condition Accessibility Owner Contact Info Proximity to Septic Treatment & Storage Lower Yakima Valley GWMA– Slide 25

  26. ������� ���&����#���&���� ,�%����#���&��� Field Data Database "����-.�/������������� Provide Database to GWAC Lower Yakima Valley GWMA– Slide 26

  27. �����0��#��� ���)�%��1�����$������������������ �������&�+����)��� • �������&�<����� • �������&��������������� • ��������� �� • Lower Yakima Valley GWMA– Slide 27

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend