integrated project manufacturing
play

Integrated Project Manufacturing Session ID#: 14839 Primavera P6, - PowerPoint PPT Presentation

Integrated Project Manufacturing Session ID#: 14839 Primavera P6, Oracle Projects and Agile for Integrated Project Manufacturing Prepared by: Jon Moll Senior Principal Consultant REMINDER O2Works LLC Check in on the COLLABORATE mobile app


  1. Integrated Project Manufacturing Session ID#: 14839 Primavera P6, Oracle Projects and Agile for Integrated Project Manufacturing Prepared by: Jon Moll Senior Principal Consultant REMINDER O2Works LLC Check in on the COLLABORATE mobile app

  2. Introduction Introduction and Overview

  3. Company Information ■ About O2Works ▪ E-Business Suite Service Provider ▪ Experienced Consultants — Implementations, Upgrades, Extensions Booth 1238 ■ About Powell Industries ▪ Engineered Solutions ▪ Control, Distribution and Management of Electrical Energy ▪ Industry Leader — Utilities — Oil & Gas — Mining — Commuter Railways

  4. About Project Synergy ■ 11.5.10 since 2006 ▪ Financials, Manufacturing, Projects ■ 12.1.3 Re-implementation ■ Business Process Design

  5. Agenda ■ Discussion of High-Level Architecture ■ Powell Project Structure ■ Detailed Discussion of Key Integrations ■ Lessons Learned ■ Phase 2

  6. The Integrated Solution Integrated Systems Solution

  7. High-Level System Overview Operational Primavera 4 Agile P6 1 Rysigo 2 Data Hub 1 Financial Oracle EBS Oracle EBS 3 Applications Projects (Inv, WIP, BOM)

  8. Project Structure

  9. Project Structure ■ Product 1 ▪ Design — Design Activity A — Design Activity B ▪ Execution — Execution Activity ■ Product 2

  10. Integration 1 – P6/Oracle EBS Projects Primavera P6 1 Rysigo Data Hub 1 Oracle EBS Projects

  11. Integration 1 – P6/Oracle EBS Projects Planned

  12. Integration 2 – Agile / Oracle EBS Apps Agile 2 Oracle EBS Applications (Inv, WIP, BOM)

  13. Integration 2 – Agile / Oracle EBS Apps

  14. Integration 2 – Agile / Oracle EBS Apps

  15. Integration 3 – EBS Projects / EBS Apps Financial Oracle EBS Oracle EBS 3 Applications Projects (Inv, WIP, BOM)

  16. Integration 3 – EBS Projects / EBS Apps Planned Duration

  17. Integration 4 – Primavera P6 / Agile Primavera 4 Agile P6

  18. Integration 4 – Primavera P6 / Agile

  19. Integration 4 – Primavera P6 / Agile

  20. Integration 4 – Primavera P6 / Agile

  21. Lessons Learned and Phase 2 ■ Lessons Learned ▪ User understanding of downstream impacts. ▪ Security of project synchronization — Synchronize Project Financials — Synchronize Project Schedule ■ Phase 2 ▪ Automation of Synchronization

  22. Jon Moll jon@o2works.com This is a subtitle or bulleted list

  23. Please complete the session evaluation We appreciate your feedback and insight You may complete the session evaluation either on paper or online via the mobile app

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.