Integrated Project Manufacturing Session ID#: 14839 Primavera P6, - - PowerPoint PPT Presentation

integrated project manufacturing
SMART_READER_LITE
LIVE PREVIEW

Integrated Project Manufacturing Session ID#: 14839 Primavera P6, - - PowerPoint PPT Presentation

Integrated Project Manufacturing Session ID#: 14839 Primavera P6, Oracle Projects and Agile for Integrated Project Manufacturing Prepared by: Jon Moll Senior Principal Consultant REMINDER O2Works LLC Check in on the COLLABORATE mobile app


slide-1
SLIDE 1

REMINDER

Check in on the COLLABORATE mobile app

Integrated Project Manufacturing

Prepared by: Jon Moll Senior Principal Consultant O2Works LLC

Primavera P6, Oracle Projects and Agile for Integrated Project Manufacturing

Session ID#: 14839

slide-2
SLIDE 2

Introduction

Introduction and Overview

slide-3
SLIDE 3

Company Information

■ About O2Works

▪ E-Business Suite Service Provider ▪ Experienced Consultants

— Implementations, Upgrades, Extensions

■ About Powell Industries

▪ Engineered Solutions ▪ Control, Distribution and Management of Electrical Energy ▪ Industry Leader

— Utilities — Oil & Gas — Mining — Commuter Railways

Booth 1238

slide-4
SLIDE 4

About Project Synergy

■ 11.5.10 since 2006

▪ Financials, Manufacturing, Projects

■ 12.1.3 Re-implementation ■ Business Process Design

slide-5
SLIDE 5

Agenda

■ Discussion of High-Level Architecture ■ Powell Project Structure ■ Detailed Discussion of Key Integrations ■ Lessons Learned ■ Phase 2

slide-6
SLIDE 6

The Integrated Solution

Integrated Systems Solution

slide-7
SLIDE 7

High-Level System Overview

Financial Oracle EBS Projects Oracle EBS Applications (Inv, WIP, BOM) 4 Rysigo Data Hub 1 1 3 2 Operational Agile Primavera P6

slide-8
SLIDE 8

Project Structure

slide-9
SLIDE 9

Project Structure

■ Product 1

▪ Design

— Design Activity A — Design Activity B

▪ Execution

— Execution Activity

■ Product 2

slide-10
SLIDE 10

Integration 1 – P6/Oracle EBS Projects

Primavera P6 Oracle EBS Projects Rysigo Data Hub 1 1

slide-11
SLIDE 11

Integration 1 – P6/Oracle EBS Projects

Planned

slide-12
SLIDE 12

Integration 2 – Agile / Oracle EBS Apps

Oracle EBS Applications (Inv, WIP, BOM) Agile 2

slide-13
SLIDE 13

Integration 2 – Agile / Oracle EBS Apps

slide-14
SLIDE 14

Integration 2 – Agile / Oracle EBS Apps

slide-15
SLIDE 15

Integration 3 – EBS Projects / EBS Apps

Financial Oracle EBS Projects Oracle EBS Applications (Inv, WIP, BOM) 3

slide-16
SLIDE 16

Integration 3 – EBS Projects / EBS Apps

Planned Duration

slide-17
SLIDE 17

Integration 4 – Primavera P6 / Agile

Primavera P6 Agile 4

slide-18
SLIDE 18

Integration 4 – Primavera P6 / Agile

slide-19
SLIDE 19

Integration 4 – Primavera P6 / Agile

slide-20
SLIDE 20

Integration 4 – Primavera P6 / Agile

slide-21
SLIDE 21

Lessons Learned and Phase 2

■ Lessons Learned

▪ User understanding of downstream impacts. ▪ Security of project synchronization

— Synchronize Project Financials — Synchronize Project Schedule

■ Phase 2

▪ Automation of Synchronization

slide-22
SLIDE 22

Jon Moll jon@o2works.com

This is a subtitle or bulleted list

slide-23
SLIDE 23

Please complete the session evaluation

We appreciate your feedback and insight

You may complete the session evaluation either

  • n paper or online via the mobile app