HYTHE TOWN CENTRE FLOODING And prevention 20.05.19 15 slides - - PowerPoint PPT Presentation

hythe town centre flooding and prevention
SMART_READER_LITE
LIVE PREVIEW

HYTHE TOWN CENTRE FLOODING And prevention 20.05.19 15 slides - - PowerPoint PPT Presentation

HYTHE TOWN CENTRE FLOODING And prevention 20.05.19 15 slides 3.41 3.26 The Promenade 2.37 2.77 2.67 3.03 2.72 2.72 Post Office No.16 2.55 Philpotts 3.16 Prospect Place 2.94 2.40 2.65 No. 17 2.94 No.21A 2.68 Ferrymans


slide-1
SLIDE 1

HYTHE TOWN CENTRE FLOODING And prevention

20.05.19 15 slides

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6

HYTHE TOWN CENTRE LEVEL SURVEY

  • Drg. HE 1

08.04.14 Drawn by K F Endean

Levels related to Ordnance Datum (2.74m above Chart Datum). Promenade sea wall levels taken from NFDC Drg. 11720/03. All other levels by K. Endean. Levels on selected properties are threshold levels, taken as indicative of ground floor levels.

No.16 3.16 Guy’s Cottage 2.68 Ferryman’s Cottage 2.74 No.21A 2.68 BM 4.30 2.94 2.67 3.26 3.41 2.77 3.03 2.40 2.94 2.88 2.52 2.50 2.33 2.73 2.31 2.37 2.51 2.18 2.33 2.41 2.49 2.32 2.37 2.24 2.32 2.65 No. 17 Hobbits 2.64 2.55 Philpotts 2.72 Post Office 2.89 Waitrose Harveys 2.67 Bells 2.52 2.52 Lloyds 2.53 HSBC 2.62 Optique 2.89 Solicitorss Oakhaven 2.63 Natwest 2.49 Card shop 2.53 No.8 2.52 Nos 6,7 2.59 2.62 Collins 2.78 Dry Cleaners Inspire 2.60 2.72

High St. The Marsh Prospect Place Pylewell Rd The Promenade

slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14

NOBODY! BUT THE RISKS COULD BE CONTROLLED OR ELIMINATED FAIRLY EASILY

slide-15
SLIDE 15

TECHNICAL BACKGROUND

Causes of flooding Principal problem: surge tides, created by weather-driven sea level surges coinciding with normal spring tides. Secondary problem: flooding via storm water drains if the non-return flaps jam open or the pumps fail (Southern Water responsibility). Levels of tidal floods and flood defences (all related to Ordnance Datum, which is 2.74 m above Chart Datum) At Prospect Place the highest part of the grassed area is at 3.03m AOD but the low point is at approx. 2.7m AOD. In recent decades (first accurate record in 1924) several surge tides have reached approx. 2.85m AOD. In 2008 and 2014 flooding of properties was prevented by sandbag dams at the low points on the grassed area. Evidence indicates that we should prepare for a surge tide level of 3.05m AOD. (In 2008 and 2014 we only avoided a flood to that level because the surge peaked before the time of high tide. If the 1924 surge tide were repeated today it would reach 3.05m because sea level has risen by approx. 0.2m since 1924.) A sensible defence level would therefore be 3.1m AOD. A wave height allowance is not necessary because the highest surges are invariably caused by deep depressions tracking across

  • England. These create westerly winds over the English Channel and fairly calm water off Hythe.

Risks At present, a surge tide to a level of 3.05m AOD would be likely to flood approximately 80 properties. (A selection of threshold levels is shown on the slides, although many others have been omitted for clarity). The future The Environment Agency has Hythe on its long-term programme for flood defence work but that programme has been slipping. Produced by Ken Endean (For any queries or clarifications, please call 023 8084 4804)