HV bus issues and ideas: Mind the gap
From Vic Guarino's presentation at ProtoDUNE SP CPA and Field Cage meeting Wednesday https://indico.fnal.gov/conferenceDisplay.py?confId=11862
- Design Challenges:
– Thermal contraction results in .9mm gap between CPAs – Offset loading from FC results in significant rotation of frame
- Looking at connecting two CPA’s together at top and bottom bars of
frame so that they act as one.
– Balanced loading – Requires top supports to beam to be able to slide .9mm for thermal contraction.
- Need flexible connection to beam to accommodate roof distortion.
[Roof distortion is 3 mm.]