Hou House Con onstruction W Waste Minim imis isatio ion P - - PowerPoint PPT Presentation

hou house con onstruction w waste minim imis isatio ion p
SMART_READER_LITE
LIVE PREVIEW

Hou House Con onstruction W Waste Minim imis isatio ion P - - PowerPoint PPT Presentation

Hou House Con onstruction W Waste Minim imis isatio ion P Proje ject Unitec Estimates range from 8.7m tons to 10.8m and growing 5.5% per year nationwide Estimated 2.5m tons to land fill Approximately 2.8 m tons recycled


slide-1
SLIDE 1

Hou House Con

  • nstruction W

Waste Minim imis isatio ion P Proje ject Unitec

  • Estimates range from 8.7m tons to 10.8m and growing 5.5%

per year nationwide

  • Estimated 2.5m tons to land fill
  • Approximately 2.8 m tons recycled
  • House holds generate approximately 1 ton per annum
  • Auckland alone sends 1.7 to 2.4 m tons to land fill
  • 850k to 1m tons construction/demolition
slide-2
SLIDE 2

Projec ect M Method

  • dol
  • log
  • gy
  • 4 identical re-locatable houses measured in project
  • 3 Bed, open plan wooden framed, iron roofed, cedar clad,
  • Waste stream separation by activities
  • Sub floor-bearers up-
  • Framing
  • Roofing and soffit
  • Exterior cladding and rap
  • Internal lining and trim
  • Plastics and cardboard
  • Sub trades

Roofing, electrical plumbing, kitchen/bath fit-out

slide-3
SLIDE 3

Weigh St Station

  • 2 x 120 ltr bins labelled per house
  • 3 x 120 ltr recycle bins
  • 3 x 120 ltr land fill bins
  • Materials sorted by cross section sizes/location and weighed
  • Placed into 3 cm bin for recycle-furnace fuel-
  • Each house weighed once per week, weather permitting
  • Running spread sheet tracks results
slide-4
SLIDE 4

Studen ent P Partici cipation

  • n
  • Student awareness of waste in industry
  • Initial concept of competition amongst students
  • Student involvement in project
  • Benchmarking -virtual or real world-
slide-5
SLIDE 5

Some Furth Further C r Consi siderati tions s

  • Cross reference collected data to prior Unitec research data
  • Estimated $31k cost of waste from new house construction (AUT )
  • Industry buy in
  • Cost benefit analysis on quadruple bottom line
  • Economic, Environmental, Social, Intergenerational
  • Political intervention/legislation
  • Fine tuning Waste Minimisation Act 2008
  • E.g .responsibility for product “end of use/life”