history and milestones
play

HISTORY AND MILESTONES HISTORY AND MILESTONES DOC S.r.l., - PowerPoint PPT Presentation

HISTORY AND MILESTONES HISTORY AND MILESTONES DOC S.r.l., Documentation Organization & Consultancy, was established in 1997 by MASCO group C.E.O. Eng. Alberto Borella and Eng. Paolo Curt who became Managing Director. DOC key


  1. HISTORY AND MILESTONES HISTORY AND MILESTONES DOC S.r.l., Documentation Organization & Consultancy, was  established in 1997 by MASCO group C.E.O. Eng. Alberto Borella and Eng. Paolo Curtò who became Managing Director. DOC key personnel are active members of relevant regulatory  recognized organizations like PDA, ISPE and FIP.

  2. HISTORY AND MILESTONES DOC operates in Italy through offices based in  Padua (near Venice) and Settala (Milan). Settala (Milan) Facility Battaglia Terme (Padua) Facility 2011: DOC got from Lloyd’s Quality Assurance  Register Limited ISO 9001:2008 certification for “cGMP compliance and validation consultancy services”

  3. 2014: new DOC headquarter opening in Settala (Milan) including  offices, Training and meeting rooms 2015: DOC service portfolio enlargement in the areas of Process  Validation, Product Qualification and Analytical Laboratory tests supporting pharmaceutical manufacturing Companies in compliance with the latest international regulatory requirements.

  4. OUR MISSION AND VISION To play the role of the “System Integrator ” , acting as “Communication Platform & Facilitator” between the cGMP Compliance requirements and the final users. The final result is to provide a functional system totally validated. Be recognised as a qualified provider of Validation Services for pharmaceutical companies on a global scale.

  5. DOC EXPERIENCE IN EUROPE

  6. DOC EXPERIENCE IN THE WORLD

  7. AREAS OF EXPERTISE System Design Validation Consultancy Maintenance Training and GMP Consultancy Process and System Product Qualification Validation Full cGMP Compliance Validation package !

  8. VALIDATION LIFE CYCLE APPROACH AREAS OF EXPERTISE VALIDATION LIFE CYCLE APPROACH System Maintenance Change control and Process Revalidation Ongoing Qualification and Validation User Instrumentation Recalibration (Maintenance) Requirement Specification GMP Personnel Training Release to Manufacturing Product Performance Functional Qualification Specification Personnel Initial Training & SOPs Operational Qualification Design Specification Instruments Calibration Enhanced Design Review (EDR ) Installation Qualification Design Quality Risk Management (QRM ) Qualification FAT/SAT Support Sistem Built Regulatory and GMP reference as per International Standards, EMA, US FDA, WHO, PIC/S ..

  9. SYSTEM DESIGN AND CONSULTANCY AREAS OF EXPERTISE VALIDATION LIFE CYCLE APPROACH  Conceptual Design Support and potential vendors evaluation  User requirements specification preparation (URS)  Functional & design specification revision (FDS)  Quality Risk Management (QRM)  Design qualification (EDR: Enhanced Design Review)  Traceability Matrix  Coordination & assistance (witnessing) for the system commissioning activities at supplier factory & at final user site, i.e: - F.A.T. (Factory Acceptance Test) - S.A.T. (Site Acceptance Test)

  10. SYSTEM QUALIFICATION AREAS OF EXPERTISE VALIDATION LIFE CYCLE APPROACH  Validation Protocols preparation, “Site” tests execution & validation reports preparation for: Installation Qualification (IQ) • • Operational Qualification (OQ) • Performance Qualification (PQ) • Product Process Validation (PPV)  Computerized control system validation as per GAMP 5 and 21 CFR part 11 requirements.

  11. SYSTEM QUALIFICATION – CRITICAL UTILITIES AREAS OF EXPERTISE VALIDATION LIFE CYCLE APPROACH Production, storage and distribution of: • Water for Injection • Purified Water • Pure steam • Process gases (compressed air, nitrogen, etc) HVAC Systems and related controlled classified areas including: • Unidirectional Air Flow areas (LAFs) • Environmental monitoring systems (EMS) for critical parameters

  12. SYSTEM QUALIFICATION – MANUFACTURING EQUIPMENT Solid finished API Bioprocess (API) forms Syntesis Powder Mixers Fermentation Reactors Units High Shear Filter dryers Granulators Incubators Oscillating Static dryers Granulators RO/UF purification Fluidized Bed units Granulators and Dryers Freeze Dryers Tableting Centrifuges Machines Centrifuges Coating Machines Downstream Units Crystallizers Capsules filling and sorting Machines Blistering and Secondary Packaging Lines

  13. SYSTEM QUALIFICATION – MANUFACTURING EQUIPMENT Liquid Finished Forms QC Laboratories and Warehouse Solution preparation and Sterilization Autoclave filtration units Vials and Ampoules washing, Washing Machines depyrogenation and filling line Incubators Prefilled Syringes lines Dry Heat Oven Bags form, fill and seal machines LAF and Bio Safety Cabinet Freeze Dryers (Lyophilizers) Freezer Sterilization Units (Autoclaves and Ovens) Dispening Booth VHP sterilizers Blow fill and seal machines Warehouse Washing Machines for equipment pieces Cold Rooms Cold Rooms and Warehouse

  14. PRODUCT AND PROCESS VALIDATION DOC product process validation services can cover the following typologies: Products as : • • Active Pharmaceutical Ingredients (APIs) • Antibiotic drug formulations • Controlled drug substances and their precursors • Cytotoxic drugs • Radiopharmaceutical drugs Manufacturing processes as: • • Clinical, R&D or small scale pilot batch • Stainless steel or Single Use System • Long Process campaign • High/Low temperature processes • High Pressure/Flow

  15. PRODUCT AND PROCESS VALIDATION VALIDATION STUDIES FINISHED PROCESS PRIMARY PRODUCT PACKAGING

  16. PROCESS VALIDATION In process material qualification studies on • Tubes • Connections • Process equipment material • • Single Use Technology Qualification and Validation PROCESS • Process Optimization Study Screening, filterability and scale-up studies • • Product and Process Filter Validation Compatibility • Extractables and Leachables • Adsorption Studies • Viability Studies • Bacterial Retention Studies •

  17. PROCESS VALIDATION • Extractables and Leachables Studies • Toxicological Evaluation and Assessment • Cleaning Validation Validation Master Plan • Risk Assessment PROCESS • S.O.P. Development and Review • Cleaning Validation Protocol and Report • Grouping & Bracketing Approach • Toxicological Assessment (PDE) • • Sanitizing Efficacy Validation • Analytical Method Development, Validation and Transfer • Particle Release Testing and Foreign Matters

  18. PRODUCT VALIDATION • Material Qualification Studies • Compatibility • Adsorption Studies • Extractables and Leachables Studies on Elastomeric closures • PRIMARY Containers Glass • Containers Plastic PACKAGING • • Toxicological Evaluation Assessment • Container Closure Integrity Test

  19. PRODUCT VALIDATION • Sterility Test Studies • Endotoxin Limit Test (LAL test) • Stability Studies Accelerated and Real Stability • Photo stability • FINISHED Oxidation Studies • PRODUCT • AD/Mix Studies • Antimicrobial Effectiveness Testing • Antimicrobial Susceptibility Testing • Leachables Studies • Analytical Method Development

  20. VALIDATION MAINTENANCE Validation maintenance services supplied by DOC include the implementation of the following Support Systems, able to maintain the “Validated State” : • Standard operating procedure (SOP) for: Operation and cleaning • Instruments calibration • Preventive maintenance • Change control & re-validation • • Process and System re-validation • Periodical instruments calibration • Preventive maintenance program • Change control management

  21. TRAINING Equipment and Processes and GMP General Systems Product Topics HVAC and Computerized controlled Aseptic Processing System Validation environments Pharmaceutical Pharmaceutical Sterilizing Filter Water and Steam Validation Principles Validation Systems Methodology and Documentation Extractables & Moist and Dry Leachables Heat Sterilization Validation Life Cycle Single Use System Solution (From DQ to PQ ) Qualification & preparation and Validation filtration Primary Packaging Quality Risk Management Validation of Qualification Existing Container Closure Systems Integrity Testing Organization of Technical Manuals For GMP systems Cleaning Validation Rapid Microbiology

  22. TRAINING • Delivered by qualified trainers and active members of PDA, ISPE • Duration Customized from Half a day to Two days standard modules • Available upon request as totally tailored modules • Deliverables at DOC site (30 attendees as ideal number for interaction) or at customer site • Each Training includes a group/individual final evaluation session • Official Attendance Certificate

  23. CONSULTANCY New Facility Conceptual Design Pharmaceutical Manufacturing Systems Design Review Quality Risk Analysis (as per ICH Q9) FAT/SAT. support Consultancy Automated System Development, Change Control and Revalidation (SCADA/DCS) GMP Process & System review Existing Facility Audit Validation Master Plan SOP /Documentation Preparation Single Use Systems Design

  24. (some) REFERECENCES

  25. ITALIAN HEAD QUARTER ADDRESS: Viale delle Industrie, 12bis 20090 Settala (Milano) ITALY Tel. +39 02 950806.230 Fax. +39 02 950806.212 Web www.docvalidation.it Mail doc@docvalidation.it

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend