S T R U C T W E L HERITAGE CONSERVATION PLOT NO-15, SECTOR-24, OFF SION-PANVEL HIGHWAY, TURBHE, NAVI MUMBAI FOUNDATION COMPANY INCEPTION RAMESH Founded STRUCTWEL on 18 th April 1967. A Highly Celebrated N. RAIKAR & an accomplished


slide-1
SLIDE 1

PLOT NO-15, SECTOR-24, OFF SION-PANVEL HIGHWAY, TURBHE, NAVI MUMBAI

HERITAGE CONSERVATION

S T R U C T W E L

slide-2
SLIDE 2

FOUNDATION

COMPANY INCEPTION

Founded STRUCTWEL on 18th April 1967. A Highly Celebrated & an accomplished Engineer with fellowship of most of the major institutions across the globe and Honors such as the ‘Honorary Membership of ACI’.

He is the author of four books and has been bestowed with many awards and honors Special Recognition Award for Leadership Role in the Concrete Industry in India by CANMET / ACI, 1994. ACI, USA awarded ACI Honorary Membership, 2004. First Asian to receive this award.

RAMESH

  • N. RAIKAR

1939 - 2008 Founder & Inspiration

Behind this ever growing company was a complete technocrat who believed in the philosophy of

Progress Through Knowledge.

slide-3
SLIDE 3

STRUCTWEL GROUP OF COMPANIES

ORGANISATION PROFILE

04

STRUCTWEL Designers & Consultants Pvt. Ltd. TASS (Technical & Scientific Sales) STRUCTWEL Constructions

  • Pvt. Ltd.

CSRL-STRUCTWEL

  • Pvt. Ltd.

STRUCTWEL FZE

Pune Dubai Mumbai Mumbai

Dubai INDIA

Mumbai Nagpur Bangalore

slide-4
SLIDE 4

ORGANISATION PROFILE

STRUCTWEL HISTORY

05

Started its own In-house material testing laboratory Achieved its R&D

  • status. This

recognition has been renewed, till date uninterruptedly 1988 STRUCTWEL became a private limited company 1978 Established an in-house mechanical and electrical division Laboratories got NABL accreditation 2000 Got certified with ISO 9001 2004 2005 Shifted to its Corporate office building in Navi Mumbai Ventured into the international markets and established STRUCTWEL FZE, Dubai 2007 Acquired TASS a laboratory equipment manufacturing & trading company Acquired 50% shares

  • f CSRL laboratories

(now known as CSRL- STRUCTWEL

  • Pvt. Ltd.) Pune

2007 Established EPC division under the flagship of STRUCTWEL Constructions Pvt. Ltd. 2011 Started Bangalore Office Started Nagpur Lab 2016 2018 Affiliation with Construction Industry Development Council, New Delhi

slide-5
SLIDE 5

Office Locations

ORGANISATION PROFILE

LOCATIONAL PRESENCE & TEAM STRENGTH

14 8 10 10 40 18

Projects

Dubai

252 Total Staff

Lab MEP Structural Engineers Architects Support Staff

Mumbai Pune Bangalore Nagpur

Andhra Pradesh Bihar Assam Goa Gujarat Himachal Pradesh Karnataka Kerala Madhya Pradesh Maharashtra Punjab Rajasthan Tamil Nadu Telangana Tripura Uttarakhand Uttar Pradesh West Bengal Bangladesh Sri Lanka Sikkim Maldives Haryana

Project Locations

slide-6
SLIDE 6

Master Planning Architectural Structural Mechanical Electrical & Instrumentation Fire Detection & Protection Heat, Ventilation & Air Conditioning Public Health Engineering

SERVICES

Project Management Consultancy Repairs & Restoration Heritage Conservation Research & Development Quantity Surveying Structural Health Assessment Construction Material Testing Geotechnical Testing

slide-7
SLIDE 7

RECOGNITIONS

ACHIEVEMENTS & AWARDS

Achievements & Awards - For “Wagh Mandir, at Morvi, Gujarat” Design Awards 2015 – 1st Prize in the category

  • f “Conservation
  • f Heritage”

IBC Trophy First Prize Rehabilitation / Retrofitting of Buildings Best Consultant for Heritage Construction from CIA World Construction Awards 2016 The Chief Minister of Maharashtra Shri Prithvi Raj Chouhan felicitating Chetan Raikar for the work on Replication of Ajanta Caves Chetan R. Raikar greets the then

  • Hon. President, Late Dr. APJ Abdul

Kalam at New Delhi and proudly presents our R & D achievements Chetan Raikar receiving IBC Award for ‘Excellence in Built Environment, 2015-2016’ by the Minister of Housing and Urban Affairs Shri Hardeep Singh Puri

slide-8
SLIDE 8

S T R U C T W E L

Heritage Conservation

slide-9
SLIDE 9

HERITAGE

  • The Taj Mahal Palace is one of the

landmark heritage structures of Mumbai, with a rich history.

  • The iconic hotel was subjected to the

brutal terrorist attack on the 26/11/2008.

  • Structwel did entire heritage

conservation and structural retrofitting of the structure damaged due to fire and bomb blast.

  • Project Cost – INR 600 Crores
  • Status – Completed in 2010

TAJ PALACE HOTEL

Project

Restoration of Taj Mahal Palace Hotel after terrorist attack of 26/11

Client

The Indian Hotels Co. Ltd.

Location

Mumbai

slide-10
SLIDE 10

HERITAGE

TAJ MAHAL

Project

Testing of Allied Structure in the Taj Mahal Complex

Client

Archeological Survey of India

Location

Agra, India

  • Archeological Survey of India

appointed Structwel for testing of allied structure in the Phase I of this great world renounced monument.

  • The testing was done under the

control of Archeology Survey of India and International group of Conservation consultants.

  • Project Cost – Not Applicable
  • Status – Completed
slide-11
SLIDE 11

HERITAGE

  • This is a World Heritage Building. It is

the Head Quarters of the Central Railway.

  • It is a 1.76 lakh Sq.ft. building. This

Gothic architecture monument built in 1888 is an aesthetic splendor and the most important landmark of the city

  • f Mumbai.
  • Phase I, Completed.

Project Cost – INR 10 Crores

  • Phase II, Ongoing

Project Cost – INR 50 Crores

CHHATRAPATI SHIVAJI MAHARAJ TERMINUS Project

Conservation of Main Terminal Building

Client

Central Railway, Mumbai

Location

Mumbai

slide-12
SLIDE 12

HERITAGE

HAJI ALI DARGAH

Project

Reconstruction of Haji Ali Dargah

Client

Haji Ali Trust

Location

Mumbai

  • This Dargah and Mosque structure is a

classic of Islamic architecture. It is a Monument constructed mid-sea of the coast of Mumbai.

  • The structure is being demolish and

reconstructed in marble masonry, without brick, concrete or steel.

  • Project Cost – INR 30 Crores
  • Status – Ongoing
slide-13
SLIDE 13

HERITAGE

GATEWAY OF INDIA

Project

Strengthening of Plinth and Cleaning of facade for Gateway Of India

Client

  • Dept. of Archeology, Govt. of

Maharashtra

Location

Mumbai

  • The structure is a distinguishing landmark
  • f Mumbai constructed in 1924
  • The structure has Muslim - Indian

Architectural features based on 16th Century Gujarati styles of architecture.

  • Now remembered as the point from

which the last British troops left India

  • Project Cost – INR 3 Crores
  • Status – Completed in 2004
slide-14
SLIDE 14

HERITAGE

  • Pune University Main building was
  • riginally summer residence of Governor
  • f Bombay, during the British Raj. The

structure was built in 1864 and is a typical example of colonial architecture.

  • This is a load bearing structure with

composite masonry and comprises of huge articulately decorated meeting halls.

  • Unique features are its grandeur and a

tower block.

  • The work on restoration including the

interior furnishing is in final stages of execution.

  • Project Cost – INR 20 Crores
  • Status – Completed in 2018

PUNE UNIVERSITY

Project

Conservation of Pune University, Main Building

Client

University of Pune

Location

Pune

slide-15
SLIDE 15

HERITAGE

WAGH MANDIR, MORVI

Project

Restoration and Conservation of Wagh Mandir

Client

H.H. Maharani Of Morvi

Location

Morvi, Gujarat

  • STRUCTWEL provided EPC services for

Heritage Conservation of this 2 Lac sq.ft. monumental palace in Morvi, Gujarat.

  • Wagh Mandir, erstwhile called Mani

Mandir is a stunning piece of Temple & Hindu Palace Architecture and is situated in the courtyard of Wellington Secretariat in Morvi.

  • Built in 1935, the magnificent structure

took shape in Golden Yellow sand Stone.

  • The Palace was extensively damaged in

the earthquake of 2001

  • This conservation project received

multiple National and International Awards.

  • Project Cost – INR 17 Crores
  • Status – Completed in 2015
slide-16
SLIDE 16

HERITAGE

DARBARGADH PALACE, MORVI

Project

Restoration of Darbargadh Palace of Morvi

Client

H.H. Maharani Of Morvi

Location

Morvi, Gujrat

  • The palace complex comprises of

several structures totaling to 1,50,000 sq.ft. constructed around 100 years back.

  • Retrofitting and repairs of this complex

damaged by severe earthquake was undertaken to restore the structural elements.

  • Project Cost – INR 3 Crores
  • Status – Completed in 2002
slide-17
SLIDE 17

HERITAGE

ENTRANCE FACADE BUILDING, RAJWADA

Project

Restoration of Entrance Façade building of Indore Rajwada

Client

Department of Archeology, M.P.

Location

Indore, M.P.

  • This is a unique structure, 235 years
  • ld. The structure has a blend French,

Mogul and Hindu Palace styles of architecture the lower three floors of the structure are made of stone (sand stone & black basalt) and the upper four floors are made of wood (Burma Teak wood)

  • Project Cost – INR 2 Crores
  • Status – Completed in 2004
slide-18
SLIDE 18

HERITAGE

DARBAR HALL & GANESH HALL RAJWADA

Project

Restoration of Darbar Hall and Ganesh Hall at Rajwada at Indore

Client

Indore Gaurav Foundation

Location

Mumbai

  • This is a unique structure, 235 years
  • ld, which had got severely divested by

fire.

  • The structure has a blend French,

Mogul and Hindu Palace styles of architecture, which was bought back to

  • riginal shape through intricate study,

meticulous detailing and laborious inputs from skilled artisans

  • Project Cost – INR 5 Crores
  • Status – Completed in 2002
slide-19
SLIDE 19

HERITAGE

  • Restoration and Strengthening of this

structure over 200 year old constructed in Moghul style of architectural was conducted.

  • The damages mainly to the wooden

member were related age and

  • neglect. The intricate interior details
  • f the damage were viewed and

detected by innovative use of endoscopy and endoscopic photographs.

  • The structure was strengthened for

adaptive use as a hotel

  • Project Cost – INR 8 Crores
  • Status – Completed in 2008

FALAKNUMA PALACE

Project

Restoration and Adaptive of Falaknuma Palace

Client

Indian Hotels Co. Ltd.

Location

Hyderabad

slide-20
SLIDE 20

HERITAGE

  • Carried out Structural Health

Assessment and Audit of the Palace Hotel

  • The assignment was to identify the

gravity and give revenant to marble cladding that was in danger of falling

  • ff.
  • Project Cost – Not Applicable
  • Status – Completed in 2017

UDAIPUR LAKE PALACE

Project

Heath Assessment

Client

The Indian Hotels Co. Ltd.

Location

Udaipur

slide-21
SLIDE 21

HERITAGE

CHOWMAHALLA PALACE

Project

Structural Testing and Repairs to Chowmahalla Palace

Client

Indian Hotels Co. Ltd.

Location

Hyderabad

  • Testing of this structure over 200 year
  • ld constructed in Moghul style of

architectural was conducted.

  • Endoscopic inspection to check the

condition of incased wooden joists

  • Measuring Moisture Content to record

the extent of dampness

  • Project Cost – Not Applicable
  • Status – Completed in 2000
slide-22
SLIDE 22

HERITAGE

CENTRAL TELEGRAPH OFFICE BUILDING

Project

Conservation of Central Telegraph Office

Client

Bharat Sanchar Nigam Ltd

Location

Mumbai

  • The conservation mainly revolves

around the age related deteriorations affected by rain.

  • The building styled on Gothic

architecture is slated to receive a complete treatment of retaining the

  • riginality besides re-strengthening

damaged chajja and Mangalore tiled roofing.

  • Project Cost – INR 6 Crores
  • Status – Completed in 2010
slide-23
SLIDE 23

BHARATIYA VIDYA BHAVAN

Project

Conservation & Restoration of Bharatiya Vidya Bhavan

Client

University of Mumbai

Location

Mumbai

  • This is a basement + ground+ 3 storey

commercial structure, which has been restored for an enhanced satisfactory performance of minimum life of another 25 years.

  • The structure had enormous damage

and accumulated maintenance. The structure has been restored for old age related damage and the work has been completed.

  • Project Cost – INR 6 Crores
  • Status – Completed in 1997

HERITAGE

slide-24
SLIDE 24

HERITAGE

  • Mumbai House of Maharaja of Bikaner,

was acquired by BMC and later converted into official residence of Mayor of Mumbai.

  • Built in 1920's, this is a typical example
  • f oriental style of architecture with

arched doors and windows and an

  • rnate portico. The structure has load

bearing walls and pitched roof, complete with intricate stone artwork in the elevations

  • The conservation project included

structural strengthening of the bungalow without causing any harm to the heritage features. The work was completed in 2005.

  • Project Cost – INR 3 Crores
  • Status – Completed in 2005

MAYORAL BUNGALOW

Project

Conservation of Mayoral Bungalow

Client

Municipal Corporation of Greater Mumbai

Location

Mumbai

slide-25
SLIDE 25

HERITAGE

STANDARD CHARTERED BANK

Project

Conservation of Standard Chartered Building

Client

Standard Chartered Bank

Location

Mumbai

  • Conservation of the Grade II Heritage

Structure which is over 100 years old, which has been a landmark opposite Flora fountain.

  • All the external features were

developed by developing innovative technology to match the original looks.

  • Works carried out were Structural

repairs to stone masonry, arches, wooden and steel joists flooring. Conservation of stone masonry. Revamping Mangalore tiled roof. Overhauling of storm water drainage system.

  • Project Cost – INR 3 Crores
  • Status – Completed in 2000
slide-26
SLIDE 26

HERITAGE

  • This is a landmark structure in Fort area
  • f Mumbai. This building is corporate

logo of Central Bank and completed 100 years in 2010.

  • Project Cost – INR 3 Crores
  • Status – Completed in 2010

CENTRAL BANK BUILDING

Project

Conservation of Central Bank Building at Fort

Client

Central Bank of India

Location

Mumbai

slide-27
SLIDE 27

HERITAGE

  • Located in Canacona, South Goa, the

Cabo-da-Rama fort presents a desolate spectacle of crumbling ruins unlike the forts. Cabo –de –Rama, predates the Portuguese invasion of Goa. Possession changed hands many a time as dynasties fell & rose during the ages. Portuguese claimed the fort in 1763 after defeating Raja of Scoonda & renovated it.

  • Project Cost – Not Applicable
  • Status – Completed in 2007

CABO DE RAMA FORT, GOA

Project

Preparation of DPR for adaptive reuse of the Fort

Client

Directorate of Archaeology, Goa

Location

Goa

slide-28
SLIDE 28

HERITAGE

  • In 1530 the Portuguese came to

Thane but they only began building the Ghodbunder fort in 1730. The Portuguese name for the fort was Cacabe de Tanna.

  • Report for Conservation and

Restoration of the Ghodbunder Fort was carried out for Archaelogy and Museums dept.

  • Project Cost – Not Applicable
  • Status – Completed in 2011

GHODBUNDAR FORT

Project

Report on Conservation & Restoration of Ghodbunder Fort Monuments

Client

Archaeology & Museums, Government of Maharashtra

Location

Thane

slide-29
SLIDE 29

HERITAGE

GOA SECRETARIAL BUILDING

Project

Conservation & Adaptive reuse of Old Goa Secretarial Building

Client

Goa State Infrastructure Development Corp. Ltd.

Location

Goa

  • Old Goa Secretariat is a prominent

landmark of Panaji City. This is oldest building of City and is situated on the bank of Mandovi River.

  • Structural Repairs and Strengthening

including conservation of architectural features was carried out.

  • The building was later converted into

a Arts and Cultures Museum.

  • Project Cost – INR 11 Crores
  • Status – Completed in 2013
slide-30
SLIDE 30

HERITAGE

BARODA MUSEUM

Project

Architectural Conservations of Baroda Museum

Client

Baroda Museum & Picture Gallery

Location

Vadodara

  • Baroda Museum is a heritage

structure with basement, ground and two upper floors built in Maratha and European style of Architecture way back in the year 1894.

  • Picture gallery is a ground + one

storey structure built in European style in the year 1914 and connected to the museum building through passage with brick masonry arches at ground floor and a covered passage at first floor level.

  • The total floor area of both the

buildings together is 40,000 sft.

  • Project Cost – Not Applicable
  • Status – Ongoing
slide-31
SLIDE 31

HERITAGE

NANAWADA

Project

Conservation & Restoration of Nanawada, Historic Buildings and

  • pen spaces around the Wada.

Client

Pune Municipal Corporation

Location

Pune

  • Nanawada is a 250 years old, Grade I

listed structure. Originally a mansion

  • f Nanasaheb Phadnavis , now being

used as a school and ancillary uses.

  • Work involved repairs and

architectural elements of the building.

  • Project Cost – INR 2.5 Crores
  • Status – Completed in 2017
slide-32
SLIDE 32

HERITAGE

  • Siddhesvara & Mahadev Mandir,

are the two Kalyani Chalukya temples out

  • f four from village Hottal, located on

the western side of the village. These temples are constructed after the architectural style of later period of Kalyani Chalukya. Both temples had common prakar wall around. Both the temples were constructed in the last half of the 11th century.

  • Project

involves preparation

  • f

scheme of conservation of temples

  • Project Cost – Not Applicable
  • Status – Completed in 2011

SIDDHESVARA & MAHADEV MANDIR

Project

Conservation & Restoration of Temples at Hottal

Client

Archaeology & Museums Government of Maharashtra

Location

Nanded, Maharashtra

slide-33
SLIDE 33

HERITAGE

  • Road widening through Kalawad Gate

“Wellington crescent” building at Jamnagar – Gujarat Thoroughfare for two way traffic

  • Project Cost – INR 1 Crore
  • Status – Completed in 2006

KALAWAD GATE

Project

Widening of entrance gate of Kalawad Gate Building

Client

Government of Gujrat

Location

Jamnagar, Gujarat

slide-34
SLIDE 34

HERITAGE

SARDAR BAUG

Project

Restroration of Sardar Baug Circuit House

Client

Government of Gujrat

Location

Rajkot, Gujarat

  • The building was badly affected during

the Gujarat Earthquake in 2001

  • The building was used as a Circuit

House for Govt. Officials at Rajkot

  • Project Cost – INR 2.5 Crores
  • Status – Completed in 2004
slide-35
SLIDE 35

HERITAGE

  • Raj Bhavan Complex is the official

residence and office of the Governor

  • f Maharashtra.
  • Structwel is involved in Restoration

and revamping of Interiors of the following Bunglows

  • Jal Bhushan – Governor’s

Residence

  • Jal Kiran – Presidential Suite
  • Jal Chintan – Guest house for
  • ther state Governors
  • Jal Laxshan - Guest house for
  • ther state Governors

RAJ BHAVAN

Project

Conservation & Interior

Client

PWD

Location

Mumbai

  • Structwel is also involved in Conservation

and adaptive reuse of Bunker found inside the complex

  • Project Cost – INR 70 Crores
  • Status – Ongoing
slide-36
SLIDE 36

THANK YOU