Herding CATs Data modelling and validation with FME James Grant - - PowerPoint PPT Presentation

herding cats
SMART_READER_LITE
LIVE PREVIEW

Herding CATs Data modelling and validation with FME James Grant - - PowerPoint PPT Presentation

Herding CATs Data modelling and validation with FME James Grant Paul Goodhue Contents - The issue - The solution - The outputs - Next steps Pressure Class Stiffness Rating Installation Company Survey Date Pipe Depth Installation


slide-1
SLIDE 1

Herding CATs

Data modelling and validation with FME

James Grant Paul Goodhue

slide-2
SLIDE 2

Contents

  • The issue
  • The solution
  • The outputs
  • Next steps
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10

Pressure Class Stiffness Rating Installation Company Survey Date Pipe Depth Installation Method

slide-11
SLIDE 11

IDS Governor Framework

slide-12
SLIDE 12

IDS Governor Database

  • Multiple asset categories (3 Waters,

Parks, Foreshore).

  • Mapping of fields between IDS,

GIS and SAP.

  • Allows multiple revisions to be

stored and validated.

  • Data validation business rules
  • CAT configuration.
  • CAT submission logging.
  • CAT Validation results .
slide-13
SLIDE 13

Loading the Governor

slide-14
SLIDE 14

Data Modelling –Excel Template

slide-15
SLIDE 15

Data Modelling –Power Designer

slide-16
SLIDE 16

Creating the CAT Template

slide-17
SLIDE 17

Creating the CAT Template

slide-18
SLIDE 18

Validating CATs

slide-19
SLIDE 19

More Validating CATs…

slide-20
SLIDE 20

Validation Outputs -Excel

slide-21
SLIDE 21

Validation Outputs -KML

slide-22
SLIDE 22

As-Built Data Processing

  • Workbench moves data

from CAT to stage tables.

  • Asset features can then be

checked and approved by project manager.

  • Uses configuration stored

in the Governor database.

slide-23
SLIDE 23

CAT Submission Portal

slide-24
SLIDE 24

Next Steps

  • Configure Governor to model and process additional categories of asset data.
  • Release regular revisions to ensure the system can validate and process changing as-built

requirements.

  • Investigate ways to continue streamlining the whole process end-to-end.
  • Lay the foundations to enable submission of as-built data in other formats and by methods other

than Excel, such as an API.