LAKE HAZEL AND EAGLE INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

HELLO!

LAKE HAZEL AND EAGLE ROAD INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

Thank you for taking the time to learn more about the Lake Hazel and Eagle Intersection Project. The purpose of this information is to give you an opportunity to:

LEARN

about the project.

TELL US

what you think.

CONSTRUCTION IS CURRENTLY PLANNED FOR 2022.

slide-2
SLIDE 2

Untitled map

Untitled layer

Increase safety for those that walk, bike and drive Improve trafgic flow Accommodate future trafgic

PROJECT PURPOSE

LAKE HAZEL AND EAGLE ROAD INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

slide-3
SLIDE 3

LAKE HAZEL AND EAGLE INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

PROJECT DESCRIPTION

Widen and signalize the Lake Hazel and Eagle intersection Add dual left-turn lanes on most approaches Include additional thru lanes Add dedicated right turn lanes on two approaches

DRIVING

slide-4
SLIDE 4

LAKE HAZEL AND EAGLE INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

WALKING + BICYCLING

PROJECT DESCRIPTION

Install curb, gutter and sidewalks. Most of the sidewalk will be bufgered, except for one section on Lake Hazel Road. Include painted crosswalks Construct bufgered bike lanes

slide-5
SLIDE 5

Safety for those that walk, bike and drive

PROJECT CONSIDERATIONS

LAKE HAZEL AND EAGLE ROAD INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

Impacts to trafgic flow Current and future development Utilities Property and neighborhood impacts

slide-6
SLIDE 6

PROJECT TIMELINE

LAKE HAZEL AND EAGLE ROAD INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

Begin design Seek public input Refine design Purchase property necessary for project Construction

HERE

SPRING 2020 FALL 2020 2022 2021 2022

WE ARE

slide-7
SLIDE 7

LAKE HAZEL AND EAGLE INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

TRAFFIC VOLUMES MORNING

The numbers below represent the approximate number of vehicles entering the Lake Hazel and Eagle intersection during the peak morning hours.

Existing

950 vehicles

2040 Projections

3,500 vehicles

3,500

VEHICLES

950

VEHICLES

2040 PROJECTIONS EXISTING

slide-8
SLIDE 8

TRAFFIC VOLUMES EVENING

The numbers below represent the approximate number of vehicles entering the Lake Hazel and Eagle intersection during the peak evening hours.

Existing

1,200 vehicles

2040 Projections

4,500 vehicles

LAKE HAZEL AND EAGLE ROAD INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

2040 PROJECTIONS EXISTING

4,500

VEHICLES

1,200

VEHICLES

slide-9
SLIDE 9

BUFFERED BIKE LANES

PAINTED BUFFER

LAKE HAZEL AND EAGLE ROAD INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

ACHD’s Roadways to Bikeways Master Plan calls for more robust bike lanes along these types of roadways. BUFFERED BIKE LANES: Utilize a painted bufger to provide more space between vehicles and bicyclists, which increases safety. Are used on roads with higher speeds and trafgic volumes.

slide-10
SLIDE 10
  • LAKE HAZEL AND EAGLE INTERSECTION

FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

OTHER PROJECTS IN THE AREA

There are many projects planned for this area over the next five years. Click on the map on the right to go to ACHD’s interactive Integrated Five-Year Work Plan map where you can learn about additional projects and anticipated timelines.

slide-11
SLIDE 11

LAKE HAZEL AND EAGLE INTERSECTION FALL 2020 • ADA COUNTY HIGHWAY DISTRICT

WHAT DO YOU THINK?

Thank you for taking the time to review the information about the Lake Hazel and Eagle Intersection Project. The next step is to review the design slides and then tell us what you think.

Design Typical Sections Survey

While your comments are always welcome, they can be best used if received by October 16, 2020. After the comment period closes, ACHD will review and address the comments received from the public.