Hello Bonjour Guten Tag Goude Middag Hey Nn h o My name is - - PowerPoint PPT Presentation

hello
SMART_READER_LITE
LIVE PREVIEW

Hello Bonjour Guten Tag Goude Middag Hey Nn h o My name is - - PowerPoint PPT Presentation

Hei Hello Bonjour Guten Tag Goude Middag Hey Nn h o My name is Jukka Koskinen and I offer project services in Marine and Offshore industry PROJECT SERVICES Marine & Offshore Industry Project Management, Package Management, EPIC


slide-1
SLIDE 1
slide-2
SLIDE 2

Hei Hello Bonjour Guten Tag Goude Middag Hey Nín hǎo

slide-3
SLIDE 3

My name is Jukka Koskinen and I offer project services in Marine and Offshore industry

slide-4
SLIDE 4

PROJECT SERVICES Marine & Offshore Industry Project Management, Package Management, EPIC Management, Turn-Key Management, Procurement Management, Purchasing, Technical Purchasing, Engineering Management, Commissioning Management, Inspections, Factory Acceptance Tests, Interface Coordination, Supply Chain Management, Site Management

slide-5
SLIDE 5

INTRODUCTION

I am a BSc Engineer (mechanical) and MSc Project Manager with over 25 year of work experience in offshore and shipbuilding industry. I am multilingual with excellent communication skills which I have adopted through my long career managing and coordinating international and multicultural projects and site teams in various countries such as Monaco, France, Norway, China, The Netherlands and Finland. I consider myself as an expert managing complex hydro-electric-mechanical applications for

  • ffshore and marine industry meeting the most stringent fabrication and instrumentation

requirements and standards. I have successfully completed Turn Key projects in owners’, builders’ and manufacturers’ organizations. I am familiar with the relevant marine and

  • ffshore rules of classification societies as DNV GL, ABS, LRS and BV. I have an extensive

experience working as a project manager, package manager, purchaser, EPIC manager and designer within various large vessel projects (from 100MEUR to 1000MEUR) as CALM Buoy Terminals, Subsea PLEMs, Navy vessels, Passenger Cruisers, Ferries, Container Carriers, LNG tankers, Cable Layers, Subsea Pipe Layers, Topside removal/installation Vessels, FPSOs, Drilling Ships, Platform Supply Vessels and Offshore Wind Farm Platforms.

slide-6
SLIDE 6

LINE OF BUSINESS / POSITION

  • Naval vessels, shipbuilding / Designer
  • Commercial vessels, shipbuilding / Designer
  • Commercial vessels, shipbuilding / Purchaser
  • Commercial vessels, shipbuilding / EPIC (Turn-Key Contracts) Manager
  • Offshore vessels / Package Manager
  • Single Point Mooring (SPM) Terminals, Subsea Equipment / Package Manager
  • Offshore cranes / Project Manager
slide-7
SLIDE 7

Typical Standards and Rules;

ISO 9001:2008, API Q1-9th Edition, API 6D (ISO 14313), API 6DSS (ISO 14723), ASME, ASTM, EN 10204, ISO 17292, ISO 10497, NACE MR0175 (ISO 15156), DNV 2.22, EN 13852, EU Machinery Directive, PSA, API 2C, NORSOK R-002, ISO 8383, EN81, ATEX, SOLAS, HSE standards in marine and offshore industry

Typical Equipment;

Diesel engines, HVAC, valves, slewing rings, electrical and hydraulic motors, pipes, fire prevention systems and material, Offshore cranes, pipe handling equipment, lifting platforms, CALM BUOY emerged/submerged valves, PLEM subsea valves, Buoy HPUs, Buoy Central Pipe Units, Buoy Swivels and Chain Stoppers, marine elevators and escalators

Typical Tasks;

Engineering Coordination, Interface Coordination, HSE Safety and Security, QA/QC Quality Control, Managing supply chain, Managing time-, cost- and scope baselines, Team management, Site management, Purchasing, Expediting, Invoicing & controlling cash flow, Managing communication, Inspections, FATs, SATs, Coordination of the final acceptance, Documentation, Preservation, Delivery and Logistics

slide-8
SLIDE 8

FUNCTIONAL SKILLS

LANGUAGE

  • English – fluent
  • Swedish – good
  • Norwegian – good
  • German – fair
  • Chinese – beginner
  • Finnish – native
  • French - beginner

ENVIRONMENT

  • HSE knowledge

SOFTWARE

  • Autocad
  • Foran
  • Microstation
  • Windows
  • MS Project
  • Axapta
  • SAP
  • Safran
slide-9
SLIDE 9

REFERENCES

slide-10
SLIDE 10

Client Dubai Petroleum Establishment (DPE), TOTAL New Terminal Project (Djeno), PETRONAS PENAPISAN SDN BHD (MELAKA) Project localisation Imodco Terminals S.A. (Building upon SBM Offshore Terminals Technology) Project title DPE, Upgrading of Fateh Field Offloading System TOTAL Djeno, New CALM BUOY Terminal MELAKA, PETRONAS PENAPISAN SDN BHD Position : Package Manager Mission’s objectives Ensure that the assigned owner furnished equipment packages (CALM BUOY and PLEM equipment such as Buoy emerged/submerged valves, PLEM subsea valves, Buoy HPUs, Buoy Central Pipe Units, Buoy Swivels, winches) are managed, designed, fabricated, installed, tested, preserved, packed, delivered and transported to site and meet requirements stated in contract. Realised tasks From builder’s point of view review and comment vendors’ documents such as drawings, calculations, equipment/material specifications and functional descriptions etc. Review and comment ITP-/FAT- and commissioning

  • procedures. Create/reply reports, NCRs, change requests and technical
  • queries. Monitor and control vendor’s performance and quality accuracy

against project time-, cost- and scope baselines. Participate tests, commissioning, and approval process. Coordinate logistics and final delivery. Software/Methods/Environment : MS Project, Windows Office, Autocad Achieved results Material received on site in time, budget and with acceptable quality.

slide-11
SLIDE 11

Client Petrobras Project localisation Jurong Shipyard in Singapore, Poland, Norway Project title Offshore cranes for Drilling ship.

  • 2x Electro Hydraulic Wire luffing Offshore Pedestal Crane,

63T@48M/7,5T@50M

  • 2x Electro Hydraulic Knuckle boom Offshore Pedestal Crane, 85T@45M

Position : Project Manager Mission’s objectives Manage signed project to meet the contractual requirements Realised tasks From manufactures point of view review and comment internal engineering. Review and comment suppliers’ engineering. Create documents such as schedules, specifications and functional descriptions prior procurement, surface preparation and painting procedures, ITP-/FAT- and commissioning procedures and manuals. Create logical equipment packages for procurement, confirm the accuracy of the offered technical and commercial content. Ensure timely and accurate submittal of approval document packages to classification society and

  • client. Create and communicate reports. Create/reply NCRs, changes requests

and technical queries. Monitor and control the manufacturing. Ensure safe execution of the project. Monitor and control project performance and quality accuracy against time-, cost- and scope baselines. Coordinate tests, commissioning, approval process, logistics and final delivery. Manage project closure process, reports and lessons learned. Software/Methods/Environment : Inventor, Autocad, MS Project, Windows Office Achieved results Succesfull deliveries in time and budget

slide-12
SLIDE 12

Client Total Project localisation Huyndai Heavy Industries, Korea Project title Offshore cranes to Moho Nord FPU project.

  • 2x Electro-Hydraulic Stiff-Boom Offshore Pedestal Crane, 27T@19M / 8T@33M

Position : Project Manager Mission’s objectives Manage signed project to meet the contractual requirements Realised tasks As above. Software/Methods/Environment Inventor, Autocad, MS Project, Windows Office Resultats obtenus Succesfull deliveries in time and budget

slide-13
SLIDE 13

Client Allseas Engineering B.V. Project localisation Delft The Netherlands / DSME South Korea / Shanghai China Project title Pioneering Spirit (a vessel for single-lift installation and removal of large offshore oil and gas platforms, and the installation of subsea oil and gas pipelines, 403342 GT). Position : Package Manager Mission’s objectives Ensure that the assigned owner furnished equipment packages are managed, designed, fabricated, installed, tested and transported to site and meet requirements stated in contract. Offshore Pedestal Crane, 600T@20m / 50T@58m 2x Offshore Pedestal Crane, 50T@33m / 24T@58m Multipurpose Offshore Travelling Crane, 50T@33m / 24T@58m Electric pipe handling Offshore Gantry Crane, 100T/10T Electric pipe handling Offshore Gantry Crane, 50T/10T 4x Electric pipe handling Overhead Crane, 100T/10T Electric pipe handling Overhead Crane, 50T/10T 4x Electro-Hydraulic platform lifts, 2.5T Realised tasks From owner’s point of view review and comment vendors’ documents such as drawings, calculations, equipment/material specifications and functional descriptions etc. Review and comment ITP-/FAT- and commissioning procedures. Create/reply reports, NCRs, changes requests and technical queries. Monitor and control vendor’s performance and quality accuracy against project time-, cost- and scope baselines. Participate tests, commissioning, and approval process. Coordinate logistics and final delivery. Software/Methods/Environment : Autocad, MS Project, Windows Office Achieved results Material received on site in time, budget and with acceptable quality.

slide-14
SLIDE 14

Client Abu Dhabi National Oil Company, RCCL, Color Line, Norilsk Nickel Project localisation STX Finland (now Meyer Turku) Project title LNG Tankers, Ferries, Cruise ships, Container carrier Position : Buyer, System Coordinator, Turn-Key Contract Engineer Mission’s objectives Execute procurement activities, coordinate ITT, create specifications to equipment packages, test-commission-deliver the equipment packages on site Realised tasks Define content and budget to new project proposals. Create content to ITT. Manage bidding contest and supplier selection. Identify, monitor and control

  • risks. Approve vendor invoices. Monitor and control vendor performance and

ensure deliverables (motors, valves, pipes, lifting devises etc) are received in time and budget. Participate FATs, inspections, coordinate equipment commissioning (lifting devises, engine rooms, elevators, escalators) in vessel at yard and onboard during sea trial. Software/Methods/Environment : MARS, Windows Office, MS Project, Safran, Jira, Autocad, Foran, Kronodoc Achieved results Material received on site in time, budget and with acceptable quality.

slide-15
SLIDE 15

Client Royal Dutch Navy Project localisation Royal Schelde Shipyard (now DAMEN Vlissingen) Project title Air Defense and Command Frigate Position : Designer Mission’s objectives Outfitting design for military equipment Realised tasks Design workshop drawings in connection to hull design and special equipment. Software/Methods/Environment : Microstation Achieved results Drawings completed in assigned time and quality.

slide-16
SLIDE 16

Client International Cableship Pte. Ltd., Singapore Project localisation SCHEEPSWERF DE HOOP LOBITH B.V. Project title Multipurpose cable layer Position : Designer Mission’s objectives Outfitting design, General Arrangement, Insulation Schema, Fire Class Schema, interior layouts etc. Realised tasks Design workshop drawings in connection to hull design and special equipment. Software/Methods/Environment : Autocad Achieved results Drawings completed in assigned time and quality.

slide-17
SLIDE 17

Helsinki shipyard (STX Finland)

EPIC Engineer, System Coordinator in following projects:  505 MMC Norilsk Nickel, Arctic container vessel, Norilsk Nickel, 2006, 14500 GT

Turku shipyard (Wärtsilä Marine, Masa-Yards, Kvaerner Masa-Yards, Aker Yards, STX Finland)

EPIC Engineer, System Coordinator in following projects:  1 364 M/S Allure of the Seas, Cruise ship, RCCL, 2010, 225000 GT  1 363 M/S Oasis of the Seas, Cruise ship, RCCL, 2009, 225000 GT  1 354 M/S Independence of the Seas, Cruise ship, RCCL, 2008, 158000 GT  1 353 M/S Liberty of the Seas, Cruise ship, RCCL, 2007, 158000 GT  1 355 M/S Color Magic, Passenger ferry, Color Line AS, 2007, 74600 GT  1 352 M/S Freedom of the Seas, Cruise ship, RCCL, 2006, 158000 GT  Lengthening of M/S Enchantment of the Seas, Cruise ship, RCCL, 2005  1 351 M/S Color Fantacy, Passenger ferry, Color Line AS, 2004, 74600 GT  1 348 M/S Mariner of the Seas, Cruise ship, RCCL, 2003, 137300 GT  1 347 M/S Navigator of the Seas, Cruise ship, RCCL, 2002, 137300 GT Purchaser in following projects:  1 346 M/S Adventure of the Seas, Cruise ship, RCCL, 2001, 137300 GT  1 345 M/S Explorer of the Seas, Cruise ship, RCCL, 2000 137300 GT  1 344 M/S Voyager of the Seas, Cruise ship, RCCL, 1999, 137300 GT  1 330 - 1 333 M/S Mubaraz, LNG-carrier, Abu Dhabi National Oil Company, 1996, 135000 m3  1 336 Cable Innovator, Cablelayer, International Cableship Pte. Ltd., Singapore, 1995, 14000 GT Designer in following projects:  1 320 M/S Nils Holgersson, Ro/Ro-Ferry Conversio, TT-Line, 1993, 17500 GT  1 302 M/S Cinderella, Passenger ferry, Oy SF Line Ab, 1989, 46400 GT  1 301 M/S Silja Serenade, Passenger ferry, Oy Silja Line Ab, 1990, 58000 GT  1 298 M/S Kalypso, Passenger ferry, Rederi AB Slite, 1990, 39500 GT  1 297 M/S Athena, Passenger ferry, Rederi AB Slite, 1989, 39500 GT

slide-18
SLIDE 18

Kiitos Thank you Merci beaucoup Danke schoen Dank u well Tusen takk Xièxiè