hacienda de las flores
play

HACIENDA de las FLORES one of Moragas most important assets 1 - PowerPoint PPT Presentation

HACIENDA de las FLORES one of Moragas most important assets 1 Joao A. Magalhaes November 2014 HACIENDA de las FLORES background & goals expand utilization Generate revenue 2 Joao A. Magalhaes November 2014


  1. HACIENDA de las FLORES one of Moraga’s most important assets 1 Joao A. Magalhaes – November 2014

  2. HACIENDA de las FLORES background & goals  expand utilization  Generate revenue 2 Joao A. Magalhaes – November 2014

  3. HACIENDA de las FLORES Potential improvements to enhance, promote and preserve Hacienda de las Flores B& B&B B – Res estau aurant  Tea ea Room - Libr brary  Ne New E Ent ntranc nce(s)  Multi i - gen ener erat ational  commu mmunity cent nter Sw Swimming P Pool ool  Spa/Fi Sp Fitness ss a at Pavi vilion  Cave/ e/Cellar ellar for  reh rehear earsal l dinners Expan ansion o of even ent areas areas  Bocce b e ball all courts  New Classroom oms, e s, etc…  3 Joao A. Magalhaes – November 2014

  4. HACIENDA de las FLORES B & B private investment support weddings, St. Mary’s College, • special events and out of Town visitors source of revenue for Hacienda/Town • 4 Joao A. Magalhaes – November 2014

  5. Typical B&B Five star rooms Quality private investment 5 Joao A. Magalhaes – November 2014

  6. Restaurant quality private investment keeping r resi sidents a s and t their o outl tlays s in to town. (75% (75% curren entl tly diverge ged ou out of of town) synergy with B& h B&B and W Wedding e events 6 Joao A. Magalhaes – November 2014

  7. Tea Room library quality private investment A A plac place f for meeting ng and reading ng wh while e enjo njoying a cu cup of ca cappucc ccino or tea with h locally pr lo produced pas pastries. 7 Joao A. Magalhaes – November 2014

  8. swimming pool spa . fitness private investment hacien enda’s ’s ear arly da days s sty tyle tial com poten enti omponent of of a new B& B&B 8 Joao A. Magalhaes – November 2014

  9. HACIENDA de las FLORES new entrance(s) quality entrances to an impressive asset 9 Joao A. Magalhaes – November 2014

  10. HACIENDA de las FLORES Cave – Cellar ideal for rehearsal dinners additional area for weddings and local events (source of revenue) 10 Joao A. Magalhaes – November 2014

  11. HACIENDA de las FLORES a good ood plan cou ould incor orpor orate e all listed ed idea eas pl plus us other ot er com ompon onen ents that have e not ot been een iden entifi fied ed yet 11 Joao A. Magalhaes – February 2014

  12. HACIENDA de las FLORES 12 Joao A. Magalhaes – November 2014

  13. HACIENDA de las FLORES Typical Conceptual plans 13 Joao A. Magalhaes – November 2014

  14. Typica cal sketches hes to to illu llustrate Design fea eatures es 14 Joao A. Magalhaes – November 2014

  15. design to tool ols to to preserv rve histo torical ch character of of hacien enda 15 Joao A. Magalhaes – November 2014

  16. HACIENDA de las FLORES Plans & Strategies Joao A. Magalhaes – November 2014 16

  17. HACIENDA de las FLORES no action might not be a good plan B&B - projected yearly gross revenue Revenue to Town from: 10 • Leasing contract including Rooms $2,500/ percentage profit sharing $250/ni night • Taxes ght Town of moraga 60% occupancy 210 days *15 days for 350 days major repairs $525,00 $875,000 special events 0 investors Transient occupancy tax of approximately $50,000 based on 9.5% rate 17 Joao A. Magalhaes – November 2014

  18. Haci Hacienda plan  Avoid piecemeal programs that may alter the characteristics of the Hacienda. Suggestions  Engage experienced architectural firm to develop Comprehensive Conceptual Plan. key capabilities: Talent - Network  Conceptual Plan should consider: • Hacienda’s history and character, Hacienda Foundation’s recommendations, • Moraga Resident’s suggestions, • potential suitable new installations as • required to generate revenue to Town. 18 Joao A. Magalhaes – November 2014

  19. Haci Hacienda plan  Based on the feasibility of the conceptual plan, Select investors, Suggestions tenants and quality operators through a request for qualifications process  Criteria for selection: Maximization of use, • Proposed revenue to Town, • Quality of proposed improvements • Integrity of original facilities. • 19 Joao A. Magalhaes – November 2014

  20. HACIENDA de las FLORES Suggested actions Selection through request for qualifications process phase 1 phase 2 Develop, Prepare Finance, Conceptual Plan Town Town Design, Build and for Manage operation best use of asset 20

  21. scope of work by stages phase 1 Phase 1 (A) - Preliminary concept prepare Analysis to confirm conceptual plan proposed concept is viable for best use of asset Phase 1 (B) - Conceptual plan based on feasibility 21 Joao A. Magalhaes – November 2014

  22. Town Main O&M Lease phase 2 Contract Agreement Facilities investors Operators O&M equity develop, finance, design, build Architectural SPC Contractor and firm operate EPC AD refurbished facilities Hacienda Bank(s) Foundation financing O&M  Maximization of use  Revenue to Town  Quality of proposed improvements  Integrity of original facilities SPC – Special Purpose Company 22 Joao A. Magalhaes – November 2014

  23. HACIENDA de las FLORES 23 Joao A. Magalhaes – November 2014

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend