SLIDE 1
Ground Water Rule
- Classification
- Urban setting designation
- Response requirements
2
Ground Water Classification And Response Requirements OAC 3745 300 - - PowerPoint PPT Presentation
Ground Water Classification And Response Requirements OAC 3745 300 10 Certified Professional 8 Hour Training Eric Sainey Ground Water Rule Classification Urban setting designation Response requirements 2 Ground Water
2
3
4
5
6
7
8
9
10
11
12
13
14
Clay Till
25 gpm sand zone
Yield = 2 gpm
15
15 feet
15 feet Yield of lower zones is not a factor
Unconsolidated Material
(clay till with sandy silt zone)
Yields less than 3 gpm Well
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
33
35
36
½ mile buffer around USD
37
38
39
40