Greyfield Precinct Renewal Presentation to Minister for Planning , - - PowerPoint PPT Presentation

greyfield precinct renewal
SMART_READER_LITE
LIVE PREVIEW

Greyfield Precinct Renewal Presentation to Minister for Planning , - - PowerPoint PPT Presentation

Greening the Greyfields Greyfield Precinct Renewal Presentation to Minister for Planning , Victoria & Senior Executive, DELWP Prof. Peter Newton FASSA and Dr. Stephen Glackin Swinburne University 18 February 2016 Objective: Improving the


slide-1
SLIDE 1
  • Prof. Peter Newton FASSA and Dr. Stephen Glackin

Greening the Greyfields

Presentation to Minister for Planning , Victoria & Senior Executive, DELWP

Greyfield Precinct Renewal

Swinburne University 18 February 2016

slide-2
SLIDE 2

Objective: Improving the performance of Residential Infill

A business as usual (knockdown/ rebuild) scenario Sub-optimal use of land in relation to:

  • Housing (low yield)
  • Green space
  • Energy/carbon footprint
  • Water conservation.

Regeneration scenario with lot amalgamation

  • Optimised land use, high quality design
  • Better yield (medium density)
  • Housing mix (types/size)
  • Zero carbon (distributed generation and

storage)

  • Water sensitive (stormwater harvesting)
  • Minimise area devoted to vehicles
  • Maximised green space
  • Landowners maximise investment through

collective sale

slide-3
SLIDE 3

Research Stages

Technical Engagement

Source: Newton & Glackin (2015)

Statutory

slide-4
SLIDE 4

Plan Melbourne Refresh

Source: Plan Melbourne Refresh Discussion Paper, p57

slide-5
SLIDE 5

Technical: Identifying Precincts with High Redevelopment Potential (ENVISION)

ENVISION tool locates LGAs and precincts with high redevelopment potential

Booroondara Maroondah

slide-6
SLIDE 6

Technical: Maroondah Housing Strategy

  • Business as Usual / Piecemeal Capacity
  • by suburb
  • zone
  • typical redevelopment rates
  • uptake analysis
  • Neighbourhood Activity Centres
  • by activity centre
  • zone
  • typical redevelopment rates
  • with lot amalgamations & medium density
  • Uptake analysis
  • Greyfields / lot amalgamations
  • by suburb
  • zone
  • typical and encouraged redevelopment rates
  • uptake analysis
slide-7
SLIDE 7

Technical: Business as Usual redevelopment versus Precincts

NAC Avg lot size RPI >= 0.7 Total area (sqm) BAU DSR (sqm) Capacity

BAU DSR (detached housing) DSR200 (large townhouse) DSR 100 (Small Townhouse) DSR 50 (Walk up apartment) DSR 20 (5 story apartment)

Burnt Bridge SC & PO

725 217 157,325 371

424 786 1573 3146 7866

Canterbury Gardens

799 46 36,754 372

99 183 367 735 1837

Bedford Rd

686 290 198,940 374

532 994 1989 3978 9947

Kallay Street Shops

725 146 105,850 371

285 529 1058 2117 5292

McAdam Square

725 189 137,025 371

369 685 1370 2740 6851

Merrindale SC

749 141 105,609 433

244 528 1056 2112 5280

North Croydon Shopping Plaza

897 167 149,799 368

407 748 1497 2995 7489

North Ringwood

888 192 170,496 471

362 852 1704 3409 8524

Total

2,722 5,309 10,618 21,236 53,090

Centre Suburb Avg lot size Avg dev. DSR Projected Units / lot RPI >= 0.7 # high RPI and area > avg. Capacity at BAU DSR (100%) Burnt Bridge SC & PO CROYDON 725 371 2.0 217 72

141

Canterbury Gardens BAYSWATER NORTH 799 372 2.1 46 9

19

Bedford Rd RINGWOOD EAST 686 374 1.8 290 195

358

Kallay Street Shops CROYDON 725 371 2.0 146 97

190

McAdam Square CROYDON 725 371 2.0 189 173

338

Merrindale SC CROYDON SOUTH 749 433 1.7 141 137

237

North Croydon Shopping Plaza CROYDON NORTH 897 368 2.4 167 56

137

North Ringwood RINGWOOD NORTH 888 471 1.9 192 46

87

Total

1506

If 100% of high RPI properties are developed (only to existing densities), we almost double the dwellings by using precincts and land optimisation

slide-8
SLIDE 8

Technical: Environmental and Financial Feasibility of Precinct Re-Design (ESP)

Economic viability: Our calculators indicate significant gains can be made through lot amalgamation - particularly in joint venture (landowner / developer) scenarios. [Missing

from Productivity Commission report: Housing Decisions of Older Australians, Dec 2015]

Environmental and Social Sustainability: ESP indicates significant sustainability and social gains can be made through lot amalgamation - particularly with LGA involvement in design and statutory regulation

slide-9
SLIDE 9

Engagement: process and tools for Precinct Scale Renewal

Community Engagement – Town hall: Large scale engagements with all

  • residents. Recently completed in

Maroondah (in collaboration with housing strategy officers) and previously in Reservoir and Hampton (AHURI) Neighbourhood Engagement – Kitchen Table: Being prepared, in collaboration with Maroondah officers

slide-10
SLIDE 10

Statutory and legal tools for greyfield precincts

Legal templates: Offering a variety of contractual templates for land owners to engage with precincts Financial options: establishing a range of financial options for residents Statutory tools: Currently working on identifying the regulatory issues that could prevent greyfield precinct redevelopment and how to overcome them.

slide-11
SLIDE 11