George Washington Murals June 11 2019 2 Intervention Scale CONSERVE INTERPRET OBSCURE REMOVE Textile Solid Painting Covering Panels (Curtain) (Fabricated) SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2 3 Additional Information
SAN FRANCISCO UNIFIED SCHOOL DISTRICT
Intervention Scale
2
2
CONSERVE INTERPRET OBSCURE REMOVE
Painting Textile Covering (Curtain) Solid Panels (Fabricated)
Additional Information
- Feasibility Assessment, not a Design.
- Costs are Estimates Only.
3
SCOPE OF WORK
- Engineering design to
determine the method of attachment for the curtain track above the murals.
- Architectural design for
selection of curtain color and design.
- Protection of murals in vicinity
- f track installation.
- Installation of track.
- Touch up painting and repair of
area affected by track system installation.
- Installation of curtains.
TEXTILE COVERING
4
4
Project Cost $375k Duration Up to 16 ½ months
SCOPE OF WORK
- Erection of scaffold to access
the murals.
- Installation structural elements
at top and bottom of mural panels.
- Installation of custom acoustic
panel framework.
- Touch-up painting and repair of
area affected by track system installation.
- Installation of acoustic panels.
Solid Panels
5
5
Cost Estimate $645 - $825k Duration Up to 14 months
SCOPE OF WORK
- Erection of scaffold to access
the murals.
- Application of a primer to the
mural surface.
- Filling of surface irregularities
after priming.
- Second application of primer
- ver filled areas.
- Application of interior coating.
- Second application of coating.
PAINTING
6
6
Cost $600k + Duration 3 Years +
Questions?