Future Meetings ! Meeting eeting Da Date Loca ocation tion - - PowerPoint PPT Presentation

future meetings meeting eeting da date loca ocation tion
SMART_READER_LITE
LIVE PREVIEW

Future Meetings ! Meeting eeting Da Date Loca ocation tion - - PowerPoint PPT Presentation

Agenda ! 6.15 Doors open / arriv Doors open / arrivals als 6.30 Intr troduc oductions tions 6.40 Terms of r erms of ref efer erenc ence e 6.55 Welc elcome and P ome and Projec oject upda t update e 7.15 Gener eneral clari


slide-1
SLIDE 1

!

6.15 Doors open / arriv Doors open / arrivals als 6.30 Intr troduc

  • ductions

tions 6.40 Terms of r erms of ref efer erenc ence e 6.55 Welc elcome and P

  • me and Projec
  • ject upda

t update e 7.15 Gener eneral clari al clarifi fica cations tions 7.20 Site Preparations 7.35 Par arty y Wall and Neighbourly M all and Neighbourly Matt tters ers 7.40 Q&A session Q&A session 7.55 Round-up

  • und-up

8.00 Close lose

Agenda

slide-2
SLIDE 2

!

Meeting eeting Da Date Loca

  • cation

tion Agenda genda RLG 1 3 October Francis Holland Project update from QDDC Refresher from Squire and Partners Site Preparation works presentation from GIA and Arup RLG 2 5 November TBC Introduction to demolition contactors Progress update from contractor Phase 1 consultation RLG 3 3 December TBC Progress Update from contractor Phase 1 consultation. RLG 4 7 January, 14 TBC Progress Update from contractor Secant Piling Phase 1 consultation. RLG 5 4 March TBC TBC RLG 6 6 May TBC TBC RLG 7 8 July TBC TBC RLG 8 9 September TBC TBC

Future Meetings

slide-3
SLIDE 3

!

Chelsea Barracks

Welcome

Michael Patrizio – QDDC RLG 3rd Oct 2013

slide-4
SLIDE 4

!

Chelsea Barracks

Update

Jeremy Titchen – QDDC RLG 3rd Oct 2013

slide-5
SLIDE 5

!

Development Phases

slide-6
SLIDE 6

!

Chelsea Barracks

Masterplan

Chris Hartiss– Squire and Partners RLG 3rd Oct 2013

slide-7
SLIDE 7

!

Site Context

Ebury Bridge Road Grosvenor Waterside

!

slide-8
SLIDE 8

!

Example of Consented Parameter Plan

!

slide-9
SLIDE 9

!

Consented Design Code

slide-10
SLIDE 10

!

Originally Consented Scheme

!

slide-11
SLIDE 11

!

Chelsea Barracks

Revised Planning Application Section 73

slide-12
SLIDE 12

!

Parameter Plan and Illustrative Layout

slide-13
SLIDE 13

!

Originally Consented Scheme

!

slide-14
SLIDE 14

!

Revised Consented Scheme

!

slide-15
SLIDE 15

!

SUBMITTED MASTERPLAN 360 sq m PROPOSED REVISION 400 sq m

Increased Public Open Space

slide-16
SLIDE 16

!

PROPOSED REVISION 400 sq m

Increased Public Open Space

slide-17
SLIDE 17

!

Masterplan

Proposed Revision

Block 1 1162 sq m 748 sq m Block 2 1320 sq m 1583 sq m Block 3 792 sq m 748 sq m TOTAL 3274 sq m 3079 sq m

Developable Area – Typical Floor

slide-18
SLIDE 18

!

Example of Consented Parameter Plan

!

slide-19
SLIDE 19

!

Originally Consented Scheme

!

slide-20
SLIDE 20

!

Revised Consented Scheme

!

slide-21
SLIDE 21

!

Originally Consented Scheme

slide-22
SLIDE 22

!

Revised Consented Scheme

slide-23
SLIDE 23

!

Originally Consented Scheme

!

slide-24
SLIDE 24

!

Revised Consented Scheme

!

slide-25
SLIDE 25

!

Originally Consented Scheme

!

slide-26
SLIDE 26

!

Revised Consented Scheme

!

slide-27
SLIDE 27

!

Chelsea Barracks

PHASE 0

slide-28
SLIDE 28

!

Chelsea Barracks

Site Preparation Works

Malcolm Turpin – Arup RLG 3rd Oct 2013

slide-29
SLIDE 29

!

Proposed Site Preparation Works

Demolition

  • Demolish above ground structures:
  • Dove Walk warehouses
  • Broome & Butler Houses
  • Other redundant structures
  • Planned Start on site Nov 2013
  • Expected Duration 4-5 months

SITE PREPARATION WORKS

slide-30
SLIDE 30

!

SITE PREPARATION WORKS

Proposed Site Preparation Works

Demolition Works

slide-31
SLIDE 31

!

Proposed Site Preparation Works

Ground Clearance

  • Clear ground of former foundations and other buried structures in 4-6m band around

perimeter and line of secant piled wall in preparation for future construction of perimeter retaining walls

  • Planned Start on site Feb 2014
  • Expected Duration 4-5 months

SITE PREPARATION WORKS

slide-32
SLIDE 32

!

Proposed Site Preparation Works

Ground Clearance

slide-33
SLIDE 33

!

Proposed Site Preparation Works

Ground Clearance

slide-34
SLIDE 34

!

Proposed Site Preparation Works

Sub-station Relocation

  • Relocate existing network electrical sub-station adjacent to the Dove Walk Warehouse to new

temporary location on corner of Pimlico Road and Dove Walk

  • Timing – during demolition and ground clearance works

SITE PREPARATION WORKS

slide-35
SLIDE 35

!

SITE PREPARATION WORKS

Proposed Site Preparation Works

Electrical Sub-station relocation

slide-36
SLIDE 36

!

Chelsea Barracks

Party Wall & Neighbourly Matters

Aaron Morris– GIA RLG 3rd Oct 2013

slide-37
SLIDE 37

!

  • Legislates the rights to carry out work whilst providing protection to the

Neighbours

  • Surveyors role is to protect the rights of the wall or adjoining buildings
  • Party Wall Surveyors must be impartial and act independently
  • Agree a schedule of condition
  • Consent will be documented in a party wall Award
  • Notices will be served in phases:
  • Demolition of Dove Walk warehouse above ground
  • Removal of earlier foundations below ground
  • Future notices:
  • Secant wall piling
  • Excavations for basement
  • Does not cover demolition of Broome and Butler House …

Party Wall and Neighbourly Matters

slide-38
SLIDE 38

!

  • Survey and inspection of neighbouring properties
  • To identify any buildings that are more sensitive than others
  • To carry out a schedule of condition survey

Party Wall and Neighbourly Matters

slide-39
SLIDE 39

!

Meeting eeting Da Date Loca

  • cation

tion Agenda genda RLG 1 3 October Francis Holland Project update from QDDC Refresher from Squire and Partners Site Preparation works presentation from GIA and Arup RLG 2 5 November TBC Introduction to demolition contactors Progress update from contractor Phase 1 consultation RLG 3 3 December TBC Progress Update from contractor Phase 1 consultation. RLG 4 7 January, 14 TBC Progress Update from contractor Secant Piling Phase 1 consultation. RLG 5 4 March TBC TBC RLG 6 6 May TBC TBC RLG 7 8 July TBC TBC RLG 8 9 September TBC TBC