future meetings meeting eeting da date loca ocation tion
play

Future Meetings ! Meeting eeting Da Date Loca ocation tion - PowerPoint PPT Presentation

Agenda ! 6.15 Doors open / arriv Doors open / arrivals als 6.30 Intr troduc oductions tions 6.40 Terms of r erms of ref efer erenc ence e 6.55 Welc elcome and P ome and Projec oject upda t update e 7.15 Gener eneral clari


  1. Agenda ! 6.15 Doors open / arriv Doors open / arrivals als 6.30 Intr troduc oductions tions 6.40 Terms of r erms of ref efer erenc ence e 6.55 Welc elcome and P ome and Projec oject upda t update e 7.15 Gener eneral clari al clarifi fica cations tions 7.20 Site Preparations 7.35 Par arty y Wall and Neighbourly M all and Neighbourly Matt tters ers 7.40 Q&A session Q&A session 7.55 Round-up ound-up 8.00 Close lose

  2. Future Meetings ! Meeting eeting Da Date Loca ocation tion Agenda genda RLG 1 3 October Francis Holland Project update from QDDC Refresher from Squire and Partners Site Preparation works presentation from GIA and Arup RLG 2 5 November TBC Introduction to demolition contactors Progress update from contractor Phase 1 consultation RLG 3 3 December TBC Progress Update from contractor Phase 1 consultation. RLG 4 7 January, 14 TBC Progress Update from contractor Secant Piling Phase 1 consultation. RLG 5 4 March TBC TBC RLG 6 6 May TBC TBC RLG 7 8 July TBC TBC RLG 8 9 September TBC TBC

  3. ! Chelsea Barracks Welcome Michael Patrizio – QDDC RLG 3 rd Oct 2013

  4. ! Chelsea Barracks Update Jeremy Titchen – QDDC RLG 3 rd Oct 2013

  5. ! Development Phases

  6. ! Chelsea Barracks Masterplan Chris Hartiss– Squire and Partners RLG 3 rd Oct 2013

  7. ! ! Ebury Bridge Road Grosvenor Waterside Site Context

  8. ! ! Example of Consented Parameter Plan

  9. ! Consented Design Code

  10. ! ! Originally Consented Scheme

  11. ! Chelsea Barracks Revised Planning Application Section 73

  12. ! Parameter Plan and Illustrative Layout

  13. ! ! Originally Consented Scheme

  14. ! ! Revised Consented Scheme

  15. SUBMITTED MASTERPLAN ! 360 sq m PROPOSED REVISION 400 sq m Increased Public Open Space

  16. PROPOSED REVISION ! 400 sq m Increased Public Open Space

  17. Developable Area – Typical Floor ! Masterplan Proposed Revision Block 1 1162 sq m 748 sq m Block 2 1320 sq m 1583 sq m Block 3 792 sq m 748 sq m TOTAL 3274 sq m 3079 sq m

  18. ! ! Example of Consented Parameter Plan

  19. ! ! Originally Consented Scheme

  20. ! ! Revised Consented Scheme

  21. ! Originally Consented Scheme

  22. ! Revised Consented Scheme

  23. ! ! Originally Consented Scheme

  24. ! ! Revised Consented Scheme

  25. ! ! Originally Consented Scheme

  26. ! ! Revised Consented Scheme

  27. ! Chelsea Barracks PHASE 0

  28. ! Chelsea Barracks Site Preparation Works Malcolm Turpin – Arup RLG 3 rd Oct 2013

  29. Proposed Site Preparation Works ! Demolition • Demolish above ground structures: • Dove Walk warehouses • Broome & Butler Houses • Other redundant structures • Planned Start on site Nov 2013 • Expected Duration 4-5 months SITE PREPARATION WORKS

  30. Proposed Site Preparation Works ! SITE PREPARATION WORKS Demolition Works

  31. Proposed Site Preparation Works ! Ground Clearance • Clear ground of former foundations and other buried structures in 4-6m band around perimeter and line of secant piled wall in preparation for future construction of perimeter retaining walls • Planned Start on site Feb 2014 • Expected Duration 4-5 months SITE PREPARATION WORKS

  32. Proposed Site Preparation Works ! Ground Clearance

  33. Proposed Site Preparation Works ! Ground Clearance

  34. Proposed Site Preparation Works ! Sub-station Relocation • Relocate existing network electrical sub-station adjacent to the Dove Walk Warehouse to new temporary location on corner of Pimlico Road and Dove Walk • Timing – during demolition and ground clearance works SITE PREPARATION WORKS

  35. Proposed Site Preparation Works ! SITE PREPARATION WORKS Electrical Sub-station relocation

  36. ! Chelsea Barracks Party Wall & Neighbourly Matters Aaron Morris– GIA RLG 3 rd Oct 2013

  37. Party Wall and Neighbourly Matters ! • Legislates the rights to carry out work whilst providing protection to the Neighbours • Surveyors role is to protect the rights of the wall or adjoining buildings • Party Wall Surveyors must be impartial and act independently • Agree a schedule of condition • Consent will be documented in a party wall Award • Notices will be served in phases: • Demolition of Dove Walk warehouse above ground • Removal of earlier foundations below ground • Future notices: • Secant wall piling • Excavations for basement • Does not cover demolition of Broome and Butler House …

  38. Party Wall and Neighbourly Matters ! • Survey and inspection of neighbouring properties • To identify any buildings that are more sensitive than others • To carry out a schedule of condition survey

  39. Future Meetings ! Meeting eeting Da Date Loca ocation tion Agenda genda RLG 1 3 October Francis Holland Project update from QDDC Refresher from Squire and Partners Site Preparation works presentation from GIA and Arup RLG 2 5 November TBC Introduction to demolition contactors Progress update from contractor Phase 1 consultation RLG 3 3 December TBC Progress Update from contractor Phase 1 consultation. RLG 4 7 January, 14 TBC Progress Update from contractor Secant Piling Phase 1 consultation. RLG 5 4 March TBC TBC RLG 6 6 May TBC TBC RLG 7 8 July TBC TBC RLG 8 9 September TBC TBC

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.