forces based i2rs for e2e control maintenance of mpls
play

ForCES-based I2RS for E2E Control/Maintenance of MPLS Bhumip - PowerPoint PPT Presentation

ForCES-based I2RS for E2E Control/Maintenance of MPLS Bhumip Khasnabish (vumip1@gmail.com), and a few others IETF88, 1:00 -2:30 PM, Monday 04 Nov., 2013 Hyatt Regency Vancouver, Rm. Plaza C 655 Burrard Street Vancouver, BC, Canada V6C 2R7 Tel:


  1. ForCES-based I2RS for E2E Control/Maintenance of MPLS Bhumip Khasnabish (vumip1@gmail.com), and a few others IETF88, 1:00 -2:30 PM, Monday 04 Nov., 2013 Hyatt Regency Vancouver, Rm. Plaza C 655 Burrard Street Vancouver, BC, Canada V6C 2R7 Tel: +1 604 683 1234 Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 1

  2. Outline • Background • I2RS Framework • Applicability of ForCES Framework • Using ForCES in I2RS Framework • Next Step, Q&A, and Discussion • THANKS! Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 2

  3. Background • Can we use ForCES (http://datatracker.ietf.org/wg/forces/charter/) based Interface to Routing System (I2RS) for controlling/maintaining End-to-End MPLS session – End-points of MPLS session – Mid-points of MPLS session – Core-points of MPLS session • Where do we place the ForCES Agents? • What types of ForCES Apps may be necessary? • What other types of Interfaces may be involved? • Can ForCES CE be an integral part of the traditional SDN controller/orchestrator for ETE MPLS-based session/circuit management Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 3

  4. I2RS Framework Application Application Application Server I2RS Client I2RS Client I2RS Protocol & Data Encoding Router OAM, Events and Topology DB I2RS Agent Measurement Routing and Signaling Protocols RIBs and RIB Manager Policy DB Data Plane FIB Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 4

  5. Applicability of ForCES Framework • Apps must support dynamic and fine-grained control/management of label and label-based paths – ForCES Apps can be utilized for this purpose • Control/Orchestration must support the desired Security, Policy, QoS, Inspection/Analytics, Routing and Topology/Configuration Management – ForCES CE Agent with NBI to Apps and SBI to FE Agent can serve these purposes Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 5

  6. Using ForCES in I2RS Framework Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 6

  7. Next Steps • Work on Developing a draft • Welcome Contributions/Participations from others • Comments/Suggestions Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 7

  8. Q&A, and Discussion THANKS! Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 8

  9. Misc. Additional Information based on http://www.ietf.org/id/draft-hu-i2rs-overlay-use-case-02.txt Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 9

  10. Application and Orchestration • Applications can adapt based on – Loading and Recovery status – Pre- and post-condition(s) – Any other Requirements ?! • Orchestration – Multiple CE/VCE scenarios – Handling of Bursts and/or Multiple Conflicting Requests from the Apps/Services • For example, using CLI based Apps at the Cobtroller Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 10

  11. Overlay Structure Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 11

  12. Controller-Mediated Security Association ER1 and ER2 need to establish SA (security Association) with instructions from the Controller (CE Agent resides in the Controller) and adopt IPSec as the security mechanism for the transport channel Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 12

  13. Network Virtualization Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 13

  14. CE/FE/LFB Life Cycle Management START Allocate (from the Return to the END Pool of healthy Ones) Pool of healthy Ones Activate / Sanitize & Test Commission (Fix, if needed) Monitor (for SLA) & Release (After allotted Replace (if needed) time has elapsed) Mon, 04 Nov. 2013 Hyatt Regency, 655 Burrard St., Vancouver, BC, Canada V6C 2R7 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend