FIRST QUANTUM MINERALS LT LTD.

ANNUAL GENERAL MEETING

slide-2
SLIDE 2

PHI HILI LIP P PASC SCALL LL

CHAI AIRMAN MAN & CHIEF EF EX EXEC ECUTIVE UTIVE OFFICER ICER

slide-3
SLIDE 3

CLI LIVE VE NEWALL LL

PRES ESIDE IDENT NT & DIRECT ECTOR OR

slide-4
SLIDE 4

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 MO 2 MONTHS THS

STRENGTHENED OUR OPERATING BASE

+

REINFORCED THE BALANCE SHEET

+

ADVANCED OUR COBRE PANAMA PROJECT

slide-5
SLIDE 5

Brought the new Sentinel mine into commercial production  Long-life mine  Ramping up & transitioning to terrace layout  Capacity to produce over 250,000 tonnes of copper in concentrate annually

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 2 MON ONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-6
SLIDE 6

Strong operations at Kansanshi complex  Mine performance benefitting from process & margin improvement work  Smelter set sequential records for throughput and copper production  New 3-year labour agreement signed and effective January 2017

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 2 MON ONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-7
SLIDE 7

Las Cruces mine hits its stride  Most consistent operations since start-up  Maintaining a low unit cost profile  Researching potential for mine life extension

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 MO 2 MONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-8
SLIDE 8

Smaller, more mature mines  Good contributors to earnings & cash flow  Guelb Moghrein

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 2 MON ONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-9
SLIDE 9

Smaller, more mature mines  Good contributors to earnings & cash flow  Çayeli

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 2 MON ONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-10
SLIDE 10

Smaller, more mature mines  Good contributors to earnings & cash flow  Pyhäsalmi

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 2 MON ONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-11
SLIDE 11

Smaller, more mature mines  Together Guelb Moghrein, Çayeli and Pyhäsalmi contributed:

$125 million in operating profit in 2016

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL PAST 12 2 MON ONTHS THS

STRENGTHENED OUR OPERATING BASE

slide-12
SLIDE 12

Ravensthorpe  Low-cost nickel producer  Long-life mine  Challenging nickel price environment

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL 12 2 MONTH ONTHS

STRENGTHENED OUR OPERATING BASE

slide-13
SLIDE 13

A STRONG ONG START T TO O 20 2017

131 140 Q1 2016 Q1 2017

Copper Sales 000’s tonnes

119 132 Q1 2016 Q1 2017

Copper Production 000’s tonnes

Hi Higher ye year ar-over ver-year year co coppe pper r pr production duction & & sale les

Generated $265 million comparative EBITDA & $239 million of cash flow

slide-14
SLIDE 14

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL 12 M 2 MONTH ONTHS

 Sold the Kevitsa operation  Restructured the balance sheet  Implemented & maintaining a focused sales hedge program  Total proceeds of $732 million  Improved debt maturity profile  No senior debt due until 2021 when Cobre Panama is expected to be well in production and generating cash flow  Reduced revolving & senior term debt  Protecting cash flows, in a low metal price environment, ahead of the completion of Cobre Panama

REINFORCED THE BALANCE SHEET

Outlook for First Quantum upgraded to STABLE by S&P Ratings Agency

slide-15
SLIDE 15
  • Total project over 50% complete
  • Mining concession extended for a 2nd 20-year term to

February 2037

  • Heading for peak construction activity
  • Power station and associated infrastructure

prioritized for early completion

  • Power production expected in Q4 2017 from the 1st

150MW generating set

  • The 2nd 150MW set expected to follow in the 1st half of

2018

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL 12 M 2 MONTH ONTHS

ADVANCING OUR COBRE PANAMA PROJECT

slide-16
SLIDE 16
  • At mine site, 6 of the 7 mills installed
  • Installing the large gearless mill drives, with 3 mill

drives fully complete and a further 3 installed and well progressed to completion

  • Other areas of the project well underway in

construction

  • Cobre Panama will benefit from learnings from our

Sentinel mine

  • Targeting a phased commissioning in 2018 followed by

continued ramp up in 2019

AN EVENTFUL NTFUL AND SU SUCCESSFUL ESSFUL 12 M 2 MONTH ONTHS

ADVANCING OUR COBRE PANAMA PROJECT

slide-17
SLIDE 17

COBRE E PANAMA AMA PROGRE RESS SS – PORT T & POW OWER ER STATION TION OVERVIEW VIEW

slide-18
SLIDE 18

COB OBRE RE PANAMA MA PROGRESS OGRESS – POR ORT T SU SUBS BSTATION TION

slide-19
SLIDE 19

COB OBRE RE PANAMA MA PROGRESS OGRESS – POWER OWER STATION ION OVERVI ERVIEW EW

Set 1 Set 2

slide-20
SLIDE 20

COB OBRE RE PANAMA MA PROGRESS OGRESS – POWER OWER STATION ION

slide-21
SLIDE 21

COB OBRE RE PANAMA MA PROGRESS OGRESS – POWER OWER STATION ION

Set 1 Set 2

slide-22
SLIDE 22

COB OBRE RE PANAMA MA PROGRESS OGRESS – POWER OWER STATION ION

Set 1 Set 2

slide-23
SLIDE 23

COB OBRE RE PANAMA MA PROGRESS OGRESS – 23 230K 0KV V SW SWITCHY TCHYARD ARD

slide-24
SLIDE 24

COB OBRE RE PANAMA MA PROGRESS OGRESS – PLA LANT T AREA EA OVERVI ERVIEW EW

slide-25
SLIDE 25

COB OBRE RE PANAMA MA PROGRESS OGRESS – BOXCUT UTS S & & PRE-STRIP TRIP

slide-26
SLIDE 26

COBRE E PANAMA AMA PROGRE RESS SS – TAILIN ILINGS GS MANAGEMENT EMENT FACILIT ILITY Y DEC ECANT NT TUNNEL EL

slide-27
SLIDE 27

COBRE E PANAMA AMA PROGRE RESS SS – TAILIN ILINGS GS MANAGEMENT EMENT FACILIT ILITY Y NORTH H WALL

slide-28
SLIDE 28

 Acquired in August 2014  Located in the Puna region of Salta Province  An outstanding copper deposit  Conducting environmental impact assessment studies; expected to conclude in 2nd quarter 2017  Commercial & logistics aspects being addressed

A ROB OBUS UST T PROJE OJECT CT PIPELINE ELINE

TACA TACA PROJECT, ARGENTINA

slide-29
SLIDE 29

 Acquired in December 2010  Located in the Apurimac Department of southern Peru  One of the world’s major undeveloped copper deposits  Focused on the community and environmental aspects of the project

A ROB OBUS UST T PROJE OJECT CT PIPELINE ELINE

HAQUIRA PROJECT, PERU

slide-30
SLIDE 30

FIRS RST T QUANTUM TUM MINERALS ERALS

PLATFORM OF HIGH-QUALITY, EFFICIENT OPERATIONS

+

HEALTHY BALANCE SHEET

+

ROBUST COPPER PROJECT PIPELINE

+

INDUSTRY LEADING PROJECT DEVELOPMENT EXPERTISE

slide-31
SLIDE 31

FIRST QUANTUM MINERALS LT LTD.

ANNUAL GENERAL MEETING