Fire Safeguarding Buildings Under Construction, Alteration and Demolition

April 16, 2019

  • f C11ode & Theory

Chris Towski mcmcodeconsulting@gmail.com

slide-2
SLIDE 2

Woburn Electrical School of Code & Theory

slide-3
SLIDE 3

Notre Dame Cathedral

April 15, 2019

slide-4
SLIDE 4
  • 2017

27 Incidents Killed 8

  • 2018

91 Incidents Killed 11 Injured 94

  • 2019

30 Incidents Injured 22

slide-5
SLIDE 5

U.S. Average Annual Fire Responses 3,750 Construction 2,650 Alteration 2,130 Demolition _____ 8,530 Total

slide-6
SLIDE 6

2018 CFD Issued 930 Hot Work Permits 56 Temporary Fuel Permits

slide-7
SLIDE 7
slide-8
SLIDE 8

Requirements Risk Real Life Revenue Regulations

slide-9
SLIDE 9
slide-10
SLIDE 10

MA Amended Editions 1-4 Chapter 13 Edition 5 Chapter 30 Editions 6-9 Chapter 33 MA Amended Adopted 1/1/2015 In second cycle Chapter 16 Additional Chapters for other processes Chapter 33 Chapter 4 Section 11

slide-11
SLIDE 11

Began 1930 Tall Wood Chapter Enhanced Cooking

slide-12
SLIDE 12
  • Fire Safety Program 7.1
  • Owner’s Responsibility (Owner’s Document) 7.2
  • Pre Fire Plans 7.2.3 (Content, Application FD vs.

Evacuation, FPPM vs when a plan is needed) Avalon Fire Elimination

  • Fire Prevention Program Manager (FPPM)

Responsibility 7.2.4 (does not give clear guidance or qualifications)

slide-13
SLIDE 13

Hot Work Chapter 5

  • Requires fire watch
  • New certification requirements
  • Includes metal studs and ram sets
slide-14
SLIDE 14

Getting People Comfortable

  • If it can be predicted then it can be prevented (or at least managed)
  • Accepting partial compliance
  • Having fire companies make frequent visits
  • Using the ticket book under MGL 148A
slide-15
SLIDE 15

Products/Solutions

  • Fedora
  • Tattletale
  • Pillar
  • Fire Rover
  • Procon
  • Fire wire
  • Treated wood
  • Air pressurized standpipes and associated equipment
  • Early design changes i.e. steel pipe instead of plastic
  • WES
slide-16
SLIDE 16

Wireless Evacuation Signal

www.lifeguardnetworks.com

slide-17
SLIDE 17

Potential Changes

slide-18
SLIDE 18