SLIDE 1
FDOT District 5 Clyde Morris Boulevard (SR 483) from south of - - PowerPoint PPT Presentation
FDOT District 5 Clyde Morris Boulevard (SR 483) from south of - - PowerPoint PPT Presentation
FDOT District 5 Clyde Morris Boulevard (SR 483) from south of Beville Rd (SR 400) to north of International Speedway Blvd (US 92/SR 600) FPID: 408178-1-32-01 Volusia County MPO BPAC Meeting January 13, 2010 Project Implementation PD&E
SLIDE 2
SLIDE 3
SR 483 Design Phase
- Detailed Engineering
- Define:
– Right of Way Needs – Anticipated Construction Costs
- Continue:
– Local Agency and Stakeholder Involvement – Public Involvement
SLIDE 4
SR 483 – Project Limits
Project Limit Project Limit
SLIDE 5
Project Need - Safety
SLIDE 6
SR 483 PD&E Study Proposed Typical Section
Width of sidewalk adjusted to demand of pedestrian use near the educational institutions:
- Continuous 5 foot sidewalks to be constructed at outer edge of pavement on both
sides of roadway.
- Eight foot sidewalk on west side of roadway between Hancock Blvd to Richard
Petty Blvd.
- Eight foot sidewalk on east side of roadway between Richard Petty Blvd to US
92/SR 600.
SLIDE 7
Preferred Alternative
Estimated Project Cost
- Construction
$ 33,700,000
- Engineering, CEI
$ 6,750,000
- Utility Relocation
$ 4,700,000
- Right-of-Way
$ 15,000,000 Total $ 60,150,000
SLIDE 8
Volusia County MPO Bicycle/Pedestrian Feasibility Study
Completed in 2008 Analyzed 3 alternatives:
- Option A ‐ 5‐ft wide concrete sidewalk
- Option B ‐ 10‐ft wide concrete sidewalk
- Option C ‐ 12‐ft wide asphalt multi‐use trail
SLIDE 9
Volusia County MPO Bicycle/Pedestrian Feasibility Study
SLIDE 10