  1. Fairlington Park Reconstruction Aaron Wohler Park Development Arlington County Parks and Recreation

  2. Today’s Meeting  Timeline  Discuss Survey Results  Discuss Conceptual Design  Record Input from Community

  3. Improvement Process  Public Process (2-3 Months ) • Present & Discuss Initial Conceptual Design • Present Final Conceptual Design  Improvements • Finalize Drawings / Permitting ( 4-5 Months ) • Bidding / Board Approval (2 Months) • Begin Construction (summer 2017)

  4. Existing Conditions Amphitheater Playground Fairlington Park Athletic Field Gazebo Exercise Fairlington Equipment Community Building Exercise Path N Scale: no scale

  5. Survey Results (3/1/16 – 4/15/16)  Majority access the park off of S. Utah Street and from the parking lot  Majority of kids are in the 2-5yr age group  2:1 in favor of keeping sand play in the playground  Almost everyone wants increased seating, with preference given to the playground area  Outdoor fitness equipment is rarely used (comments indicated that if the equipment was better, there would be greater use)  Stretching, simple strength training, and high impact strength training are preferred types of exercise (many replied that they would check “all”, but that feature wasn’t working in the survey)  Slight majority would like to be able to do a total-body workout using equipment that is similar to that of indoor fitness equipment  The existing path is used frequently for exercise and most users would prefer to have a surface that provides greater spring-back, shock absorption, and stability  Most everyone thinks that distance markers would be helpful / beneficial  Majority are in favor of extending the exercise path around the playground, but not incorporating it into the playground  Most everyone is “satisfied” with the current park facilities  What they liked most about the park: Large open space / Convenient and easy to access / Playground Play field / Variety of features / Track and Pathways / Fitness equipment Restroom access / Farmer’s Market

  6. QR-Fit Board

  7. What’s Next?  Prepare Final Conceptual Design based on Feedback  Next Meeting • Present Final Conceptual Design and Post on Website

  8. Contact Information Aaron Wohler 703-228-7928 Awohler@arlingtonva.us Website : https://projects.arlingtonva.us/projects/fairlington-park-project/

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.