Facility Expansion Project Spaces Needs Exhibit Space for the - - PowerPoint PPT Presentation
Facility Expansion Project Spaces Needs Exhibit Space for the - - PowerPoint PPT Presentation
Facility Expansion Project Spaces Needs Exhibit Space for the 650-700 sq. ft. Walker Collection Archival Storage 325 sq. ft. Walker Collection Storage 500 sq. ft. Non-Walker Collections 500 sq. ft. Storage Total 2, 025 sq. ft. Options
Spaces Needs
Exhibit Space for the Walker Collection 650-700 sq. ft. Archival Storage 325 sq. ft. Walker Collection Storage 500 sq. ft. Non-Walker Collections Storage 500 sq. ft. Total 2, 025 sq. ft.
Options
- Option 1 – Adding on to Prouty-Chew
- Option 2 – Building a new facility at Rose Hill
- Option 3 - Leasing/buying/building a space
somewhere in Geneva
Option 3
- Existing Spaces – old DeSales High School,
Trinity Church, Pinkie’s, Dove Block, former Stomping Grounds building
- Lots within the town and city – Old Gilotti Gas
Station and corner of North and Exchange Streets
- Leasing – old Tops building and office park on
County Rd. 6
Option 3
- After careful consideration, Option 3 is no longer a
viable option.
– Existing spaces
- Spaces were too big or too small
- High costs (purchase price, utilities, and retro-fitting a building)
– Town and City Lots
- Town lots proved to be too expensive
- City lots were unavailable
– Leasing
- Concerns about not being in control of the building and its
maintenance
- Concerns about the lease not being renewed.
Option 1 - Prouty-Chew
- Installing an elevator that
would go from the sub- basement to the 2nd floor
- Building on top of the
Hucker Gallery and Archival Vault to create additional space for collections storage and exhibits
- Renovating bathrooms
- Modifying the outside
entrance to the Hucker Gallery.
Option 1 - Costs
Low High Elevator $247,5000 $297,000 Renovations and Additions $821,000 $985,300 Bathrooms $39,600 $47,500 New Mechanical Systems $368,400 $442,000 Total Costs $1,476,600 $1,772,000
Option 2- Rose Hill
- Building a new facility at
Rose Hill where the barn currently stands
- The Historical Society’s
headquarters would still be at Prouty-Chew
- Exhibit, collection storage
and program space along with a small kitchen and bathrooms
- Costs - $841,600 -
$1,000,900
- However…..
Work must also be done at Prouty-Chew
- Renovating the
bathrooms
- Creating an accessible
entrance to the Hucker Gallery
- Installing a LULA
(Limited Use Limited Access) lift from the Hucker Gallery to the First Floor
Low High Bathrooms $35,000 $42,000 Accessible Entrance to Hucker Gallery $27,100 $32,500 LULA lift $183,500 $220,200 Total $245,600 $294,700
Option 2 - Costs
Low High New Building at Rose Hill $841,600 $1,009,900 Work to be done at Prouty- Chew $245,600 $ 294,700 Total $1,087,200 $1,304,600
Costs for Option 1 and Option 2
Low High Option 1 – Adding on to Prouty – Chew $1,475,600 $1,772,000 Option 2 – Building a new facility at Rose Hill and work done at Prouty-Chew $1,087,200 $1,304,600