Facility Expansion Project Spaces Needs Exhibit Space for the - - PowerPoint PPT Presentation

facility expansion
SMART_READER_LITE
LIVE PREVIEW

Facility Expansion Project Spaces Needs Exhibit Space for the - - PowerPoint PPT Presentation

Facility Expansion Project Spaces Needs Exhibit Space for the 650-700 sq. ft. Walker Collection Archival Storage 325 sq. ft. Walker Collection Storage 500 sq. ft. Non-Walker Collections 500 sq. ft. Storage Total 2, 025 sq. ft. Options


slide-1
SLIDE 1

Facility Expansion Project

slide-2
SLIDE 2

Spaces Needs

Exhibit Space for the Walker Collection 650-700 sq. ft. Archival Storage 325 sq. ft. Walker Collection Storage 500 sq. ft. Non-Walker Collections Storage 500 sq. ft. Total 2, 025 sq. ft.

slide-3
SLIDE 3

Options

  • Option 1 – Adding on to Prouty-Chew
  • Option 2 – Building a new facility at Rose Hill
  • Option 3 - Leasing/buying/building a space

somewhere in Geneva

slide-4
SLIDE 4

Option 3

  • Existing Spaces – old DeSales High School,

Trinity Church, Pinkie’s, Dove Block, former Stomping Grounds building

  • Lots within the town and city – Old Gilotti Gas

Station and corner of North and Exchange Streets

  • Leasing – old Tops building and office park on

County Rd. 6

slide-5
SLIDE 5

Option 3

  • After careful consideration, Option 3 is no longer a

viable option.

– Existing spaces

  • Spaces were too big or too small
  • High costs (purchase price, utilities, and retro-fitting a building)

– Town and City Lots

  • Town lots proved to be too expensive
  • City lots were unavailable

– Leasing

  • Concerns about not being in control of the building and its

maintenance

  • Concerns about the lease not being renewed.
slide-6
SLIDE 6

Option 1 - Prouty-Chew

  • Installing an elevator that

would go from the sub- basement to the 2nd floor

  • Building on top of the

Hucker Gallery and Archival Vault to create additional space for collections storage and exhibits

  • Renovating bathrooms
  • Modifying the outside

entrance to the Hucker Gallery.

slide-7
SLIDE 7

Option 1 - Costs

Low High Elevator $247,5000 $297,000 Renovations and Additions $821,000 $985,300 Bathrooms $39,600 $47,500 New Mechanical Systems $368,400 $442,000 Total Costs $1,476,600 $1,772,000

slide-8
SLIDE 8

Option 2- Rose Hill

  • Building a new facility at

Rose Hill where the barn currently stands

  • The Historical Society’s

headquarters would still be at Prouty-Chew

  • Exhibit, collection storage

and program space along with a small kitchen and bathrooms

  • Costs - $841,600 -

$1,000,900

  • However…..
slide-9
SLIDE 9

Work must also be done at Prouty-Chew

  • Renovating the

bathrooms

  • Creating an accessible

entrance to the Hucker Gallery

  • Installing a LULA

(Limited Use Limited Access) lift from the Hucker Gallery to the First Floor

Low High Bathrooms $35,000 $42,000 Accessible Entrance to Hucker Gallery $27,100 $32,500 LULA lift $183,500 $220,200 Total $245,600 $294,700

slide-10
SLIDE 10

Option 2 - Costs

Low High New Building at Rose Hill $841,600 $1,009,900 Work to be done at Prouty- Chew $245,600 $ 294,700 Total $1,087,200 $1,304,600

slide-11
SLIDE 11

Costs for Option 1 and Option 2

Low High Option 1 – Adding on to Prouty – Chew $1,475,600 $1,772,000 Option 2 – Building a new facility at Rose Hill and work done at Prouty-Chew $1,087,200 $1,304,600