Extra Clerk Training 1 XPS Opening a Vessel 2 XPS Opening a - - PowerPoint PPT Presentation

extra clerk training
SMART_READER_LITE
LIVE PREVIEW

Extra Clerk Training 1 XPS Opening a Vessel 2 XPS Opening a - - PowerPoint PPT Presentation

Extra Clerk Training 1 XPS Opening a Vessel 2 XPS Opening a Vessel The Vessel profile & Stowage warning windows will open . *You can close the Stowage warning window as this is information used by the Stevedore Vessel Planner when


slide-1
SLIDE 1

1

Extra Clerk Training

slide-2
SLIDE 2

2

XPS – Opening a Vessel

slide-3
SLIDE 3

3

XPS – Opening a Vessel

The Vessel profile & Stowage warning windows will open. *You can close the Stowage warning window as this is information used by the Stevedore Vessel Planner when stowing the vessel. The Vessel profile window should remain

  • pen to allow viewing of the Crane List for

the vessel. You can minimize this to get the window off the desktop.

slide-4
SLIDE 4

4

XPS – Setting up your screen

Select Vessel>Crane Work List. The STS cranes assigned to work the vessel are displayed, the total moves assigned to each crane and the expected moves per hour.

Opening the Crane work list

slide-5
SLIDE 5

5

XPS – Setting up your screen

View the work queues assigned to each STS Crane

  • click the down arrow on the left of the

pool name. The open Crane work list displays the order in which the bays will be worked and a summary of the moves in each bay. The summary indicates the quantity and size of moves per bay and which queues have twin lifts, live reefers, cycling opportunities and empties.

Closed Pool Open Pool

slide-6
SLIDE 6

6

XPS – Setting up your screen

Select Control>Points of Work –When you open the POW to reveal the work queues, notice the symbols to the right of the work queues.

Opening the Points of Work

Reefer unit(s) need to be unplugged prior to dispatch Reefer unit(s) have been unplugged. Indicates a twin lift

slide-7
SLIDE 7

7

XPS – Setting up your screen

When working a vessel, it is best to open a complete list of the STS queues to be worked. Double click on the desired POW to

  • pen the entire list of Work Instructions assigned to that crane.

Queues within the POW -

You can, however, open an individual bay queue by double clicking your choice in the POW.

slide-8
SLIDE 8

8

XPS – Setting up your screen

The list of moves in the POW will be displayed in the bay order the crane is intended to be worked. The same order the bays show in the POW window. Note that each queue typically starts with seq.1.

Queues within the POW -

slide-9
SLIDE 9

9

XPS – Setting up your screen

From the POW window, highlight the STS crane, choose Actions>Set Dispatch Mode>Prime Route

Choosing a dispatcher - Ensure the Dispatch Mode for the crane is Prime Route when the vessel

starts or your moves will not automatically dispatch.

WHY? So the system will automatically generate rehandles!

slide-10
SLIDE 10

10

XPS – Setting up your screen

Activating Work Queues in the POW

In the POW, highlight the work queues Actions>Activate Queue. The queues will change color from black (inactive) to blue (active). Only the boxes in active queues will automatically dispatch.

slide-11
SLIDE 11

11

XPS – Setting up your screen

Activating Work Queues in the Crane work list

In the Crane Work List, highlight the work queues. Select Planning > Activate Queue. The queues will change color from black (inactive) to blue (active). Only the boxes in active queues will automatically dispatch.

slide-12
SLIDE 12

12

XPS – Setting up your screen

Opening Pools & Equipment

Select Control>Pools & Equipment. Click the down arrow on the left of the pool name to open the pool to view the strads assigned to that pool. Take note of the recommended attributes for the Pool and Equipment window.

Open pool Closed pool

slide-13
SLIDE 13

13

XPS – Setting up your screen

Choosing a Dispatcher – Ensure the Dispatch mode for the Pool of Equipment to be used

is in PrimeRoute. If the dispatcher is not primeroute, moves will not automatically dispatch. From the P&E window, highlight the STS crane, right click, Choose a dispatcher, click Prime Route.

slide-14
SLIDE 14

14

XPS – Setting up your screen

Adding Strads / Shuttles to a Pool

Highlight/select the required Pool, Right click, Get Handler, enter the SC/ST number preceded by S, and click ENTER.

slide-15
SLIDE 15

15

XPS – Setting up your screen

Removing Strads / Shuttles from a Pool

  • 1. Click and drag the ST/SC to the UNASSIGNED Pool.

OR..

  • 2. Highlight/select the ST/SC, right click, assign the ST/SC back to

the UNASSIGNED Pool.

slide-16
SLIDE 16

16

XPS – Planning & looking ahead

Are there live reefers to load that will need to be unplugged? Ensure M&R knows to update N4 when the units have been unplugged or the Dispatch State will show ‘On Power’ and the units will not dispatch. Notice that seq. 10 is physically on top of seq. 6. Can seq. 10 be taken to the whip without compromising productivity? Or does the weight of seq. 6 dictate that seq. 6 load first? Do we shift seq. 10 onto the berth or contact the planner to see if we can switch the load order?

slide-17
SLIDE 17

17

XPS – Planning & looking ahead

  • Seq. 11 below, shows the current location of this container as EC. EC indicates the unit is planned to

move out of it’s current location, but does not yet have a planned position in the yard. This container shows it has a YARD move in the SOUTHSHIFTWORK queue to be completed prior to the LOAD move to the vessel. When you see 2 moves like this, you will need to notify the OCC and your AOM! This will not dispatch unless OCC reverts the move from the shift queue!

slide-18
SLIDE 18

18

Are moves not automatically dispatching?

  • Ensure the POW has Prime Route as the

Dispatcher, the correct Pool of Equipment has been assigned to the correct POW and all queues are active (blue).

  • Ensure that the work shift is accurate

XPS – Working the Vessel

slide-19
SLIDE 19

19

Are moves not automatically dispatching?

  • Ensure the XPS

Vessel Schedule shows the vessel in the Working Visit Phase. If not, notify the Vessel Planner to advance the Visit Phase to Working in N4

XPS – Working the Vessel

slide-20
SLIDE 20

20

Suspending Auto Dispatch

The VC Checker/ Dockforeman may need to temporarily stop a ST/SC from being automatically dispatched to a move. Highlight the ST/SC in Pools and Equipment > Actions > Suspend Auto Dispatch

*When the ST/SC is able to receive automatic

dispatch, do the same thing, but choose Resume Auto Dispatch.

XPS – Working the Vessel

slide-21
SLIDE 21

21

XPS – Working the Vessel

Abandoning a job - Strad 999 is dispatched to seq. 1 in the X6.2 position.

There is a box in X6.3 covering the target, but the X6.3 box is also loading the vessel, though not until after seq. 5. All

  • f these units are empty. What is the Extra clerks role in this situation?
slide-22
SLIDE 22

22

XPS – Working the Vessel

Abandoning a job

1. Suspend Auto dispatch for S999 2. Abandon the current job on his screen. In the Pools and Equipment window, highlight the ST/SC>Actions>Abandon Job. This will automatically place the SHFT move on Bypass.

slide-23
SLIDE 23

23

XPS – Working the Vessel

Abandoning a job

3. Revert the SHFT move – Highlight the container in the LOAD queue and click the revert button. 4. Highlight the X6.3 Load box and click inside the dispatch button for the ST/SC, then resume Auto dispatch.

slide-24
SLIDE 24

24

Ask Questions!!

If you ever have a question about how to navigate a situation, please reach out to your AOM for assistance. Don’t ever fumble through the work, with the hope that it sorts itself out… it will not.

slide-25
SLIDE 25

25

Thank you