excellent good fair critical lost
play

EXCELLENT GOOD FAIR CRITICAL LOST ROAD NAME: JP DISTRICT - PowerPoint PPT Presentation

EXCELLENT GOOD FAIR CRITICAL LOST ROAD NAME: JP DISTRICT MILEAGE: CONDITION BEFORE: AREA: DESCRIPTION OF WORK: CONDITION AFTER Aubrey Long Rd. 11 2 Critical Gentry Crack Seal Critical Battlefield Rd. 1 0.7 Critical Bentonville


  1. EXCELLENT GOOD FAIR CRITICAL LOST ROAD NAME: JP DISTRICT MILEAGE: CONDITION BEFORE: AREA: DESCRIPTION OF WORK: CONDITION AFTER Aubrey Long Rd. 11 2 Critical Gentry Crack Seal Critical Battlefield Rd. 1 0.7 Critical Bentonville Crack Seal Critical Beaty Rd. 11 4.3 Good Gravette Crack Seal Good Galyean Rd. 11 0.5 Fair Hiwassee Crack Seal Fair Honey Creek Rd. 11 5.1 Fair Gravette Crack Seal Fair Peach Orchard Rd. 15 1.1 Good Bentonville Crack Seal Good Bill Young Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent Black Oak Dr. 1 1.5 Critical Lost Bridge Asphalt Overlay Excellent Cedar Forest Dr. 1 1.2 Fair Avoca / Garfield Asphalt Overlay Excellent Cripps West Rd. 12 1.4 New Construction Gentry Asphalt Overlay Excellent E. High Meadows Dr. 1 1.5 Fair Avoca / Garfield Asphalt Overlay Excellent E. McNelly Rd. 1 0.2 Good Bentonville Asphalt Overlay Excellent Fairmount Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent Harper Ln. 12 0.12 Good Gentry Asphalt Overlay Excellent N. Wimpy Jones Rd. 1 1 New Construction Garfield Asphalt Overlay Excellent N.E. Peach Orchard Rd. 15 1.3 Fair Bentonville Asphalt Overlay Excellent Point Virgo Rd. 1 0.3 Critical Prairie Creek Asphalt Overlay Excellent Posy Mountain Rd. 1 1.5 Critical Garfield Asphalt Overlay Excellent Punkin Hollow Rd. 15 0.8 Critical Bentonville Asphalt Overlay Excellent S. Peach Orchard Rd. 15 1.1 Fair Bentonville Asphalt Overlay Excellent S.W. Anglin Rd. 1 1 Good Bentonville Asphalt Overlay Excellent W. High Meadows Dr. 1 0.9 Fair Avoca / Garfield Asphalt Overlay Excellent White Oak Dr. 1 0.9 Fair Lost Bridge Asphalt Overlay Excellent Fairmount Rd. 11 5.8 Good Lowell Fog Seal Good Indian Creek Rd. 1 4.7 Good Garfield Fog Seal Good Mill Dam Rd. 9 2.3 Good Bentonville Fog Seal Good ❖ Crack seal condition change pending re-assessment Benton County

  2. ❖ IMPROVED WITH RED DIRT: Approximately 72 roads / portions of road ❖ IMPROVED WITH GRAVEL: Approximately 256 roads / portions of road ❖ CONCRETE: Approximately 23 roads/projects ❖ CULVERTS: Approximately 64 roads/projects ❖ IMPROVED WITH GUARDRAIL: Approximately 3,402 Ft. ❖ BRUSH CUTTERS: Approximately 4,200 miles ❖ POTHOLES: Approximately 500 ❖ GRADERS: Approximately 5,600 miles BID PROJECTS: ❖ Fog Seal – Completed ❖ Pothole – In Progress ❖ Concrete Patching – Completed ❖ Guardrail – In Progress

  3. Benton County

  4. YEARLY HAZARD MITIGATION GRANT FROM THE STATE ❖ THAT PROVIDES PERMANENT SOLUTIONS TO FLOOD PRONE AREAS COST SHARE: 50% / 50% ❖ SITES COMPLETED: ❖ “ The goal of our conservation and restoration “The purpose of the Unpaved Roads Program is to Punkin Hollow Rd. efforts is to keep the Illinois River and its create a better unpaved county road system with tributaries as a fully functioning ecosystem.” a reduced negative environmental impact on TOTAL COST: $180,000.00 ❖ priority water resources in Arkansas.” NEW SITES SUBMITTED FOR 2020: ❖ Benton County Posy Mtn. Rd. & Coose Hollow Ln.

  5. ❖ EMERGENCY WATERSHED PROTECTION PROGRAM THAT HELPS REMOVE HAZARD AND RESTORE STREAM HYDROLOGY BACK TO PRE-DISASTER CONDITIONS ❖ COST SHARE: 75% / 25% ❖ 4 SITES THAT WERE SENT TO THE NATIONAL OFFICE HAVE BEEN APPROVED ❖ FIRST 2 SITES ON SPRING CREEK AND OSAGE CREEK TO ADVERTISE FOR BIDS SUNDAY 10/13/19 ❖ TOTAL ESTIMATED COST: $529,401.00 ❖ WE HAVE UNTIL 3/20/20 (220 DAYS) TO COMPLETE THE WORK. Benton County

  6. ❖ OVER 200 BRIDGES, CULVERTS, & LOW WATER CROSSINGS. ❖ 98 BRIDGES INSPECTED BY ARDOT AS PART OF THE NATIONAL BRIDGE INSPECTION PROGRAM. ❖ 50+ ARDOT BRIDGE INSPECTION REPORTS RECEIVED ANNUALLY. Benton County

  7. ❖ BRIDGE REPORTS COMPLETED: 25 ❖ SCHOOL HOUSE RD. ▪ DESIGN & CONSTRUCT NEW DECK AND ABUTMENT END WALLS ▪ ADD NEW MIDSPAN LATERAL SUPPORT ▪ REPAINTING WITH INMATE LABOR ❖ PUNKIN HOLLOW RD. ▪ DESIGNED & CONSTRUCTED AS PART OF HAZARD MITIGATION PROJECT WITH 50% GRANT FUNDS ❖ WISEMAN RD. ▪ DEMOLISHING EXISTING STRUCTURALLY DEFICIENT STRUCTURE AND CONSTRUCTING NEW CLEANABLE CULVERT (JULY-AUGUST) ❖ CLOER RD. ▪ COMPLETED DESIGN OF REPLACEMENT FOR EXISTING BRIDGE. PRECAST BOXES ARE INSTALLED, WINGWALLS/HEADWALLS TO BE CONSTRUCTED SOON. ❖ O.D. CLARK DR. ❖ BILL YOUNG RD. Benton County

  8. COW FACE SPANKER CREEK WAGON WHEEL BRIDGE BRIDGE BRIDGE Engineering & Environmental ❖ ❖ Construction completed & new Construction began October 1st ❖ consultants have began work. 30% bridge is open to the public completion scheduled for 2/3/20 Plans to be submitted to ARDOT this project cost was $1,100,000 with ❖ Pre-fab arch design for cost, ❖ month. 50% being paid by EDA Grant hydraulics, & debris collection Plan ROW acquisition in 2020 & ❖ Construction Cost: $932,836 ❖ construction in 2021. Const. based on availability of grant funds Estimated cost: $1.2 M (80% ❖ Benton County Fed/20% local)

  9. OSAGE BRIDGE ROBINSON (OLD HWY 68) BRIDGE State Aid bridge Currently being designed in-house for ❖ ❖ Currently being designed by ARDOT ❖ construction in 2020 (possible const. in 2020) Estimated Cost $800,000 ❖ Estimated Cost $3M-$4M ❖ Cost share: 80% fed., 18% State, & 2% County ❖ Benton County

  10. COON HOLLOW COLUMBIA HOLLOW To submit as our next State Aid bridge To begin design phase in 2020 ❖ ❖ project as soon as Osage Bridge is in construction $15,000 State Aid design fee ❖ Benton County

  11. PROJECT BUDGET OFFSETTING 2019 NET ROAD DEPT. BRIDGE PROJECTS: STATUS: PHASE: TOTAL: REVENUE: EXPENSE: ROBINSON ROAD BRIDGE DESIGN $0.00 $0.00 $0.00 DESIGN IN-HOUSE COW FACE ROAD BRIDGE CONST. $932,836.00 $0.00 $932,836.00 $551,013.50 EDA GRANT 50/50 SPANKER CREEK BRIDGE CONST. $1,102,027.00 $551,013.50 COMPLETED STBGP-A GRANT WAGON WHEEL BRIDGE DESIGN $357,900.00 $200,000.00 $157,900.00 $200,000 2019 PROJECT GRAND TOTALS: $2,392,763 $751,014 $1,641,750 We have paid for the design phase on Osage Bridge ❖ Benton County

  12. 2020 PROJECT BUDGET OFFSETTING ROAD DEPT. BRIDGE PROJECTS: CAPITAL STATUS: PHASE: TOTAL: REVENUE: REQUEST ROBINSON ROAD BRIDGE CONST. $800,000.00 $0.00 $800,000.00 OSAGE CREEK BRIDGE CONST. $4,000,000.00 $3,920,000.00 $80,000.00 STATE AID 98/2 COON HOLLOW BRIDGE DESIGN $15,000.00 $0.00 $15,000.00 STATE AID WAGON WHEEL BRIDGE ROW $40,000.00 $0.00 $40,000.00 COLUMBIA HOLLOW BRIDGE DESIGN $225,000.00 $0.00 $225,000.00 2020 PROJECT GRAND TOTALS: $5,080,000 $3,920,000 $1,160,000 Benton County

  13. 2019 2020 2021 2022 2023 18572 18577 WAGON WHEEL COON HOLLOW DESIGN 10626 10643 22196 21418 ROBINSON COLUMBIA STONEY POINT HONEY CREEK ROAD HOLLOW 10663 01785 10643 18577 21418 COW FACE OSAGE CREEK COLUMBIA HOLLOW COON HOLLOW HONEY CREEK CONSTRUCTION 10626 18572 22196 ROBINSON ROAD WAGON WHEEL STONEY POINT Benton County

  14. Benton County

  15. TRAFFIC ROAD NAME: JP DISTRICT: MILEAGE: CONDITIONS: AREA: DESCRIPTION OF WORK: COST: SCHOOL BUSES: EMERGENCY CALLS: COUNTS: 9 1 Fair Gentry Crack and Scrub seal $38,000 6 day- 2160 2 7 Bloomfield North Rd. Spanker Creek Rd. 5 0.5 Fair Bentonville/ Bella Vista Chip-n-Seal $19,000.00 7 day- 2305 12 18 Wpa Rd 9 4.8 Good Gentry Fog Seal $55,756 7 day- 2250 2 29 Ruby Hall Rd 9 1.8 Good Gentry Fog Seal $20,275 7 day- 1502 3 11 9, 10 1.3 Fair Gentry Asphalt Overlay $153,000.00 6 day- 3853 1 19 Browning Rd. Hickory Dr 5, 12, 14 0.7 Fair Lost Bridge Asphalt Overlay $82,300.00 21 7 day- 363 2 Cottonwood Ln. 5,14 0.3 Fair Beaver Shores Asphalt Overlay $25,900.00 5 day- 135 2 7 Coose Hollow Ln 7 1.4 Fair Gentry Asphalt Overlay $164,600.00 7 day- 1495 4 17 Fain Dr. 15 0.7 Critical HWY 303 Asphalt Overlay $71,300.00 6 day- 758 2 4 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 2 Gum Dr. 5 day- 94 2 Gum Ln. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 6 5 day- 56 2 Jack Crabtree Rd. 5 1 Fair Bentonville/Bella Vista Asphalt Overlay $117,600.00 5 day- 4005 5 10 Cedar Dr 8, 14 0.4 Fair Lost Bridge Asphalt Overlay $38,700.00 7 day- 482 2 7 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 Red Bud St 6 day- 565 2 6 14 1.1 Fair HWY 12 Asphalt Overlay $122,570.00 Old Prairie Creek Rd 7 day- 4659 6 23 Larue Rd. 15 2.4 Fair HWY 303 Chip-n-Seal $84,480.00 8 6 day- 1547 3 Maple Ln. 15 0.2 Fair Beaver Shores Asphalt Overlay $23,525.00 5 day- 210 2 4 Walnut St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 7 day- 343 1 2 11 0.4 Fair Siloam Asphalt Overlay $47,000.00 7 day- 343 2 Oakview Rd 2 Wann Rd 1, 2 0.2 Critical Gravette Asphalt Overlay $19,350.00 7 7 day- 486 1 Hickory Rd 15 0.3 Fair Rogers Asphalt Overlay $29,000.00 3 7 day- 210 1 Tanglewood Rd. 15 1.8 Fair Hwy 303 Asphalt Overlay $211,300.00 6 day- 1227 2 1 Reed Ave 14 0.5 New Construction Springdale Asphalt $87,500.00 7 day- 1703 5 22 9 1 New Construction Gentry Asphalt $175,000.00 7 Bloomfield North Rd. 6 day- 2161 2 TOTAL MILEAGE: 22.4 TOTAL COST: $1,648,456.00 POT HOLES $50,000.00 LEVEL COATING $100,000 TOTAL ASPHALT BUDGET $1,798,456.00 Benton County

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.