EXCELLENT GOOD FAIR CRITICAL LOST ROAD NAME: JP DISTRICT MILEAGE: CONDITION BEFORE: AREA: DESCRIPTION OF WORK: CONDITION AFTER Aubrey Long Rd. 11 2 Critical Gentry Crack Seal Critical Battlefield Rd. 1 0.7 Critical Bentonville


slide-1
SLIDE 1
slide-2
SLIDE 2

EXCELLENT GOOD FAIR CRITICAL LOST ❖ Crack seal condition change pending re-assessment

Benton County ROAD NAME: JP DISTRICT MILEAGE: CONDITION BEFORE: AREA: DESCRIPTION OF WORK: CONDITION AFTER Aubrey Long Rd. 11 2 Critical Gentry Crack Seal Critical Battlefield Rd. 1 0.7 Critical Bentonville Crack Seal Critical Beaty Rd. 11 4.3 Good Gravette Crack Seal Good Galyean Rd. 11 0.5 Fair Hiwassee Crack Seal Fair Honey Creek Rd. 11 5.1 Fair Gravette Crack Seal Fair Peach Orchard Rd. 15 1.1 Good Bentonville Crack Seal Good Bill Young Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent Black Oak Dr. 1 1.5 Critical Lost Bridge Asphalt Overlay Excellent Cedar Forest Dr. 1 1.2 Fair Avoca / Garfield Asphalt Overlay Excellent Cripps West Rd. 12 1.4 New Construction Gentry Asphalt Overlay Excellent

  • E. High Meadows Dr.

1 1.5 Fair Avoca / Garfield Asphalt Overlay Excellent

  • E. McNelly Rd.

1 0.2 Good Bentonville Asphalt Overlay Excellent Fairmount Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent Harper Ln. 12 0.12 Good Gentry Asphalt Overlay Excellent

  • N. Wimpy Jones Rd.

1 1 New Construction Garfield Asphalt Overlay Excellent N.E. Peach Orchard Rd. 15 1.3 Fair Bentonville Asphalt Overlay Excellent Point Virgo Rd. 1 0.3 Critical Prairie Creek Asphalt Overlay Excellent Posy Mountain Rd. 1 1.5 Critical Garfield Asphalt Overlay Excellent Punkin Hollow Rd. 15 0.8 Critical Bentonville Asphalt Overlay Excellent

  • S. Peach Orchard Rd.

15 1.1 Fair Bentonville Asphalt Overlay Excellent S.W. Anglin Rd. 1 1 Good Bentonville Asphalt Overlay Excellent

  • W. High Meadows Dr.

1 0.9 Fair Avoca / Garfield Asphalt Overlay Excellent White Oak Dr. 1 0.9 Fair Lost Bridge Asphalt Overlay Excellent Fairmount Rd. 11 5.8 Good Lowell Fog Seal Good Indian Creek Rd. 1 4.7 Good Garfield Fog Seal Good Mill Dam Rd. 9 2.3 Good Bentonville Fog Seal Good

slide-3
SLIDE 3

❖IMPROVED WITH RED DIRT: Approximately 72 roads / portions of road ❖IMPROVED WITH GRAVEL: Approximately 256 roads / portions of road ❖CONCRETE: Approximately 23 roads/projects ❖CULVERTS: Approximately 64 roads/projects ❖IMPROVED WITH GUARDRAIL: Approximately 3,402 Ft. ❖BRUSH CUTTERS: Approximately 4,200 miles ❖POTHOLES: Approximately 500 ❖GRADERS: Approximately 5,600 miles

BID PROJECTS:

❖ Fog Seal – Completed ❖ Pothole – In Progress ❖ Concrete Patching – Completed ❖ Guardrail – In Progress

slide-4
SLIDE 4

Benton County

slide-5
SLIDE 5

Benton County

“The goal of our conservation and restoration efforts is to keep the Illinois River and its tributaries as a fully functioning ecosystem.” “The purpose of the Unpaved Roads Program is to create a better unpaved county road system with a reduced negative environmental impact on priority water resources in Arkansas.” ❖ YEARLY HAZARD MITIGATION GRANT FROM THE STATE THAT PROVIDES PERMANENT SOLUTIONS TO FLOOD PRONE AREAS ❖ COST SHARE: 50% / 50% ❖ SITES COMPLETED: Punkin Hollow Rd. ❖ TOTAL COST: $180,000.00 ❖ NEW SITES SUBMITTED FOR 2020: Posy Mtn. Rd. & Coose Hollow Ln.

slide-6
SLIDE 6

❖ EMERGENCY WATERSHED PROTECTION PROGRAM THAT HELPS REMOVE HAZARD AND RESTORE STREAM HYDROLOGY BACK TO PRE-DISASTER CONDITIONS ❖ COST SHARE: 75% / 25% ❖ 4 SITES THAT WERE SENT TO THE NATIONAL OFFICE HAVE BEEN APPROVED ❖ FIRST 2 SITES ON SPRING CREEK AND OSAGE CREEK TO ADVERTISE FOR BIDS SUNDAY 10/13/19 ❖ TOTAL ESTIMATED COST: $529,401.00 ❖ WE HAVE UNTIL 3/20/20 (220 DAYS) TO COMPLETE THE WORK.

Benton County

slide-7
SLIDE 7

❖ OVER 200 BRIDGES, CULVERTS, & LOW WATER CROSSINGS. ❖ 98 BRIDGES INSPECTED BY ARDOT AS PART OF THE NATIONAL BRIDGE INSPECTION PROGRAM. ❖ 50+ ARDOT BRIDGE INSPECTION REPORTS RECEIVED ANNUALLY.

Benton County

slide-8
SLIDE 8

Benton County

❖ BRIDGE REPORTS COMPLETED: 25 ❖ SCHOOL HOUSE RD. ▪ DESIGN & CONSTRUCT NEW DECK AND ABUTMENT END WALLS ▪ ADD NEW MIDSPAN LATERAL SUPPORT ▪ REPAINTING WITH INMATE LABOR ❖ PUNKIN HOLLOW RD. ▪ DESIGNED & CONSTRUCTED AS PART OF HAZARD MITIGATION PROJECT WITH 50% GRANT FUNDS ❖ WISEMAN RD. ▪ DEMOLISHING EXISTING STRUCTURALLY DEFICIENT STRUCTURE AND CONSTRUCTING NEW CLEANABLE CULVERT (JULY-AUGUST) ❖ CLOER RD. ▪ COMPLETED DESIGN OF REPLACEMENT FOR EXISTING BRIDGE. PRECAST BOXES ARE INSTALLED, WINGWALLS/HEADWALLS TO BE CONSTRUCTED SOON. ❖ O.D. CLARK DR. ❖ BILL YOUNG RD.

slide-9
SLIDE 9

WAGON WHEEL BRIDGE COW FACE BRIDGE

❖ Engineering & Environmental consultants have began work. 30% Plans to be submitted to ARDOT this month. ❖ Plan ROW acquisition in 2020 & construction in 2021. Const. based

  • n availability of grant funds

❖ Estimated cost: $1.2 M (80% Fed/20% local) ❖ Construction began October 1st completion scheduled for 2/3/20 ❖ Pre-fab arch design for cost, hydraulics, & debris collection ❖ Construction Cost: $932,836

SPANKER CREEK BRIDGE

❖ Construction completed & new bridge is open to the public ❖ project cost was $1,100,000 with 50% being paid by EDA Grant

Benton County

slide-10
SLIDE 10

ROBINSON BRIDGE

❖ Currently being designed in-house for construction in 2020 ❖ Estimated Cost $800,000

OSAGE BRIDGE (OLD HWY 68)

❖ State Aid bridge ❖ Currently being designed by ARDOT (possible const. in 2020) ❖ Estimated Cost $3M-$4M ❖ Cost share: 80% fed., 18% State, & 2% County

Benton County

slide-11
SLIDE 11

COLUMBIA HOLLOW COON HOLLOW

❖ To submit as our next State Aid bridge project as soon as Osage Bridge is in construction ❖ $15,000 State Aid design fee

Benton County

❖ To begin design phase in 2020

slide-12
SLIDE 12

❖ We have paid for the design phase on Osage Bridge ROAD DEPT. BRIDGE PROJECTS: PROJECT PHASE: BUDGET TOTAL: OFFSETTING REVENUE: 2019 NET EXPENSE: STATUS: ROBINSON ROAD BRIDGE DESIGN $0.00 $0.00 $0.00 DESIGN IN-HOUSE COW FACE ROAD BRIDGE CONST. $932,836.00 $0.00 $932,836.00 SPANKER CREEK BRIDGE CONST. $1,102,027.00 $551,013.50 $551,013.50 EDA GRANT 50/50 COMPLETED WAGON WHEEL BRIDGE DESIGN $357,900.00 $200,000.00 $157,900.00 STBGP-A GRANT $200,000 $2,392,763 $751,014 $1,641,750 2019 PROJECT GRAND TOTALS:

Benton County

slide-13
SLIDE 13

Benton County

ROAD DEPT. BRIDGE PROJECTS: PROJECT PHASE: BUDGET TOTAL: OFFSETTING REVENUE: 2020 CAPITAL REQUEST STATUS: ROBINSON ROAD BRIDGE CONST. $800,000.00 $0.00 $800,000.00 OSAGE CREEK BRIDGE CONST. $4,000,000.00 $3,920,000.00 $80,000.00 STATE AID 98/2 COON HOLLOW BRIDGE DESIGN $15,000.00 $0.00 $15,000.00 STATE AID WAGON WHEEL BRIDGE ROW $40,000.00 $0.00 $40,000.00 COLUMBIA HOLLOW BRIDGE DESIGN $225,000.00 $0.00 $225,000.00 $5,080,000 $3,920,000 $1,160,000 2020 PROJECT GRAND TOTALS:

slide-14
SLIDE 14

2019 2020 2021 2022 2023

18572 WAGON WHEEL 18577 COON HOLLOW 10626 ROBINSON ROAD 10643 COLUMBIA HOLLOW 22196 STONEY POINT 21418 HONEY CREEK 10663 COW FACE 01785 OSAGE CREEK 10643 COLUMBIA HOLLOW 18577 COON HOLLOW 21418 HONEY CREEK 10626 ROBINSON ROAD 18572 WAGON WHEEL 22196 STONEY POINT

DESIGN CONSTRUCTION

Benton County

slide-15
SLIDE 15

Benton County

slide-16
SLIDE 16

Benton County

ROAD NAME: JP DISTRICT: MILEAGE: CONDITIONS: AREA: DESCRIPTION OF WORK: COST: TRAFFIC COUNTS: SCHOOL BUSES: EMERGENCY CALLS: Bloomfield North Rd. 9 1 Fair Gentry Crack and Scrub seal $38,000 6 day- 2160 2 7 Spanker Creek Rd. 5 0.5 Fair Bentonville/ Bella Vista Chip-n-Seal $19,000.00 7 day- 2305 12 18 Wpa Rd 9 4.8 Good Gentry Fog Seal $55,756 7 day- 2250 2 29 Ruby Hall Rd 9 1.8 Good Gentry Fog Seal $20,275 7 day- 1502 3 11 Browning Rd. 9, 10 1.3 Fair Gentry Asphalt Overlay $153,000.00 6 day- 3853 1 19 Hickory Dr 5, 12, 14 0.7 Fair Lost Bridge Asphalt Overlay $82,300.00 7 day- 363 2 21 Cottonwood Ln. 5,14 0.3 Fair Beaver Shores Asphalt Overlay $25,900.00 5 day- 135 2 7 Coose Hollow Ln 7 1.4 Fair Gentry Asphalt Overlay $164,600.00 7 day- 1495 4 17 Fain Dr. 15 0.7 Critical HWY 303 Asphalt Overlay $71,300.00 6 day- 758 2 4 Gum Dr. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 5 day- 94 2 2 Gum Ln. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 5 day- 56 2 6 Jack Crabtree Rd. 5 1 Fair Bentonville/Bella Vista Asphalt Overlay $117,600.00 5 day- 4005 5 10 Cedar Dr 8, 14 0.4 Fair Lost Bridge Asphalt Overlay $38,700.00 7 day- 482 2 7 Red Bud St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 6 day- 565 2 6 Old Prairie Creek Rd 14 1.1 Fair HWY 12 Asphalt Overlay $122,570.00 7 day- 4659 6 23 Larue Rd. 15 2.4 Fair HWY 303 Chip-n-Seal $84,480.00 6 day- 1547 3 8 Maple Ln. 15 0.2 Fair Beaver Shores Asphalt Overlay $23,525.00 5 day- 210 2 4 Walnut St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 7 day- 343 1 2 Oakview Rd 11 0.4 Fair Siloam Asphalt Overlay $47,000.00 7 day- 343 2 2 Wann Rd 1, 2 0.2 Critical Gravette Asphalt Overlay $19,350.00 7 day- 486 1 7 Hickory Rd 15 0.3 Fair Rogers Asphalt Overlay $29,000.00 7 day- 210 1 3 Tanglewood Rd. 15 1.8 Fair Hwy 303 Asphalt Overlay $211,300.00 6 day- 1227 2 1 Reed Ave 14 0.5 New Construction Springdale Asphalt $87,500.00 7 day- 1703 5 22 Bloomfield North Rd. 9 1 New Construction Gentry Asphalt $175,000.00 6 day- 2161 2 7 TOTAL MILEAGE: 22.4 TOTAL COST: $1,648,456.00 POT HOLES $50,000.00 LEVEL COATING $100,000 TOTAL ASPHALT BUDGET $1,798,456.00

slide-17
SLIDE 17

Parrick Rd. Sites 1&2 – Install Boxes

Kane Rd. – Install Boxes

Dale Schrader Rd. – Install Low Water Slab

Wann Rd. – Install Low Water Slabs

Limekiln Rd. in Gravette – Install Low Water Slab

Coker Rd. – Install Low Water Slab

2020 Hazard Mitigation Grant – Posy Mountain Rd. Intersection

slide-18
SLIDE 18

Benton County

2020 ROAD DEPARTMENT CAPITAL REQUEST QUANITY: TYPE OF EQUIPMENT: PRICE PER ITEM: TOTAL PRICE: 4 GRADERS $280,000.00 $1,120,000.00 4 DUMP TRUCKS $142,000.00 $568,000.00 1 84" COMPACTOR $80,000.00 $80,000.00 2 TRACTORS W/ SIDBOOM MOWERS $150,000.00 $300,000.00 2 BACKHOE $110,000.00 $220,000.00 1 TRACK SKID STEER $80,000.00 $80,000.00 TOTAL COST: $842,000.00 $2,368,000.00 QUANITY: TYPE OF VEHICLE: PRICE PER ITEM: TOTAL PRICE: 2 1/2 TON 4X4 EXTENDED CAB PICKUPS $30,000.00 $60,000.00 2 3/4 TON 4X4 PICKUPS $30,000.00 $60,000.00 2 19,500 4X4 TRUCKS $51,000.00 $102,000.00 TOTAL COST: $111,000.00 $222,000.00 GRAND TOTALS: $953,000.00 $2,590,000.00 2019 ESTIMATED RETURNS DESCRIPTION: RETURN AMOUNT: SALE RETURN $300,000.00 TURN BACK OUT OF CAPITAL $435,000.00 TOTAL AMOUNT: $735,000.00 2020 ESTIMATED RETURNS DESCRIPTION: TOTAL RETURN AMOUNT: VEHICLES & EQUIPMENT $800,000.00