ES ESS IN NYC BATTERIES NY NYC E ESS SS ESS History 2013 - - - PowerPoint PPT Presentation

es ess in nyc
SMART_READER_LITE
LIVE PREVIEW

ES ESS IN NYC BATTERIES NY NYC E ESS SS ESS History 2013 - - - PowerPoint PPT Presentation

ES ESS IN NYC BATTERIES NY NYC E ESS SS ESS History 2013 - Present Power Shortage Indian Point Nuclear Power Plant Energy Demand Sustainability Grid Resiliency Ch Chemi mistri ries Lithium ION Lead Acid


slide-1
SLIDE 1

ES ESS IN NYC

“BATTERIES”

slide-2
SLIDE 2

NY NYC E ESS SS

ESS History 2013 - Present

  • Power Shortage
  • Indian Point Nuclear Power

Plant

  • Energy Demand
  • Sustainability
  • Grid Resiliency
slide-3
SLIDE 3

Ch Chemi mistri ries

Lithium ION Lead Acid (Flooded) Valve Regulated Lead Acid (VRLA) Flow battery Sodium Sulphur Ni Cad Evolving Chemistries

slide-4
SLIDE 4

Ins Installa allatio tion n Locatio tion n

  • Existing buildings
  • Outdoor\Roof tops
  • mobile ESS
  • versatile
  • Indoor
  • Residential
  • Little fire protection
  • Meter
  • Front
  • Behind
slide-5
SLIDE 5

Ch Challenges

Codes Standards Energy demands Life safety Responder safety New Tech Policy Goals

slide-6
SLIDE 6

Initial Initial Collabo llaboratio tion

UL NFPA IAFF DOE ICC NYC DOB

NYSERDA/CUNY

Electrical utilities

slide-7
SLIDE 7

SAFETY TY PARTN TNERS

UL NFPA DOE IAFF

Military

slide-8
SLIDE 8

St Standards F For Ba

  • r Batteri

ries UL 1973 UL 1741 UL 9540 UL 1974

slide-9
SLIDE 9

Initial Initial Tes esting ting

Life Safety Fire Operations Building Concerns

slide-10
SLIDE 10

BIGGEST CONCERN

slide-11
SLIDE 11

Full Full Scale ale System em Tes esting ting

Data test Separation Distances Suppression Requirements Ventilation\Exhaust Re-ignition

slide-12
SLIDE 12

NF NFPA 855 855

ESS Installation Standard 2020

Outdoor\Indoor\Rooftop Installations Threshold Limits

Chemistries (Li Ion,Lead Acid,NiCad,Flow) Fire Protection\Exhaust\Separation Large Scale testing (if needed) Indoor installation (utility industry)

slide-13
SLIDE 13

Ba Balancing

RISK REWARDS

slide-14
SLIDE 14

ESS NYC Installation

Dual Process NYC DOB Site Specific Installations Small , Med, Large systems (chemistry) NYC Fire Tech Management (engineers) Haz Mat Operations

slide-15
SLIDE 15

Op Operational Concerns

Explosions

High Heat Stranded energy Re-ignition

NO OVERHAUL

Post Operations Operations

slide-16
SLIDE 16

FORCED FAILURE

slide-17
SLIDE 17

Fire Operations

  • Lithium Ion (Fire Showing/Not Showing)
  • Water “Copious”
  • Electrical Leakage (?)
  • Arcing (Not Enough Water)
  • NO ADDITIVES (conductive\insufficient cooling)
  • Clean Agents
  • Incipient Fire only (no cooling)
  • Dry Chemical/Purple K
  • Lead Acid
  • NOT LI ION
slide-18
SLIDE 18

Kn Knowledge Based Tra raining of Fire Service

Awareness Operations Technician Specialist

slide-19
SLIDE 19

Dang nger erous us ???? ????

STRANDED ENERGY

slide-20
SLIDE 20

Post Operations

Decommission

Fire\Emergency SME End Of Life

Considerations

How? Who? Where?

slide-21
SLIDE 21

ESS installation

Sprinkler Water ?

slide-22
SLIDE 22

Con Container r 12 12 MW MW

FDC CA Exhaust FDC Piping Shut

  • ff
slide-23
SLIDE 23

Te Terrorism\Cy Cyber r Terr rrori

  • rism
slide-24
SLIDE 24

Th Thank k You