ES ESS IN NYC BATTERIES NY NYC E ESS SS ESS History 2013 - - - PowerPoint PPT Presentation
ES ESS IN NYC BATTERIES NY NYC E ESS SS ESS History 2013 - - - PowerPoint PPT Presentation
ES ESS IN NYC BATTERIES NY NYC E ESS SS ESS History 2013 - Present Power Shortage Indian Point Nuclear Power Plant Energy Demand Sustainability Grid Resiliency Ch Chemi mistri ries Lithium ION Lead Acid
NY NYC E ESS SS
ESS History 2013 - Present
- Power Shortage
- Indian Point Nuclear Power
Plant
- Energy Demand
- Sustainability
- Grid Resiliency
Ch Chemi mistri ries
Lithium ION Lead Acid (Flooded) Valve Regulated Lead Acid (VRLA) Flow battery Sodium Sulphur Ni Cad Evolving Chemistries
Ins Installa allatio tion n Locatio tion n
- Existing buildings
- Outdoor\Roof tops
- mobile ESS
- versatile
- Indoor
- Residential
- Little fire protection
- Meter
- Front
- Behind
Ch Challenges
Codes Standards Energy demands Life safety Responder safety New Tech Policy Goals
Initial Initial Collabo llaboratio tion
UL NFPA IAFF DOE ICC NYC DOB
NYSERDA/CUNY
Electrical utilities
SAFETY TY PARTN TNERS
UL NFPA DOE IAFF
Military
St Standards F For Ba
- r Batteri
ries UL 1973 UL 1741 UL 9540 UL 1974
Initial Initial Tes esting ting
Life Safety Fire Operations Building Concerns
BIGGEST CONCERN
Full Full Scale ale System em Tes esting ting
Data test Separation Distances Suppression Requirements Ventilation\Exhaust Re-ignition
NF NFPA 855 855
ESS Installation Standard 2020
Outdoor\Indoor\Rooftop Installations Threshold Limits
Chemistries (Li Ion,Lead Acid,NiCad,Flow) Fire Protection\Exhaust\Separation Large Scale testing (if needed) Indoor installation (utility industry)
Ba Balancing
RISK REWARDS
ESS NYC Installation
Dual Process NYC DOB Site Specific Installations Small , Med, Large systems (chemistry) NYC Fire Tech Management (engineers) Haz Mat Operations
Op Operational Concerns
Explosions
High Heat Stranded energy Re-ignition
NO OVERHAUL
Post Operations Operations
FORCED FAILURE
Fire Operations
- Lithium Ion (Fire Showing/Not Showing)
- Water “Copious”
- Electrical Leakage (?)
- Arcing (Not Enough Water)
- NO ADDITIVES (conductive\insufficient cooling)
- Clean Agents
- Incipient Fire only (no cooling)
- Dry Chemical/Purple K
- Lead Acid
- NOT LI ION
Kn Knowledge Based Tra raining of Fire Service
Awareness Operations Technician Specialist
Dang nger erous us ???? ????
STRANDED ENERGY
Post Operations
Decommission
Fire\Emergency SME End Of Life
Considerations
How? Who? Where?
ESS installation
Sprinkler Water ?
Con Container r 12 12 MW MW
FDC CA Exhaust FDC Piping Shut
- ff
Te Terrorism\Cy Cyber r Terr rrori
- rism