EOU & Taget Sizing White Group: - Eduardo Apestegui - Robert - - PowerPoint PPT Presentation

eou taget sizing
SMART_READER_LITE
LIVE PREVIEW

EOU & Taget Sizing White Group: - Eduardo Apestegui - Robert - - PowerPoint PPT Presentation

EOU & Taget Sizing White Group: - Eduardo Apestegui - Robert Kennedy - Salah Al Zubi - Yus Wilian Where are we? Survey: Depth Schlumberger Private Inclination Azimuth Errors are introduced in measurements Along hole


slide-1
SLIDE 1

EOU & Taget Sizing

White Group:

  • Eduardo Apestegui
  • Robert Kennedy
  • Salah Al Zubi
  • Yus Wilian
slide-2
SLIDE 2

Schlumberger Private 2 White Group 8/7/2009

Where are we?

Survey:

– Depth – Inclination – Azimuth

Errors are

introduced in measurements

Semi Major Axis Semi Minor Axis Along hole Axis

slide-3
SLIDE 3

Schlumberger Private 3 White Group 8/7/2009

Errors

Random Errors Systematic Errors:

– Relative depth error – References error – Drillstring magnetization interference – True inclination error – Survey tool misalignment – Sensor specific error

slide-4
SLIDE 4

Schlumberger Private 4 White Group 8/7/2009

Uncertainty Model

Simple Cone

– Function of depth

Shell

– Includes Inc – No minor axis or depth

Wolff and Wardt

– Depth & Tool (Good & Bad)

SLB ISCWSA

slide-5
SLIDE 5

Schlumberger Private 5 White Group 8/7/2009

Azimuth Uncertainty

slide-6
SLIDE 6

Schlumberger Private 6 White Group 8/7/2009

Tools Uncertainty

slide-7
SLIDE 7

Schlumberger Private 7 White Group 8/7/2009

Targeting

Geological Target

– Planned area – Defined by client/geologist

slide-8
SLIDE 8

Schlumberger Private 8 White Group 8/7/2009

Geological Target

slide-9
SLIDE 9

Schlumberger Private 9 White Group 8/7/2009

Geological Target DrillerTarge t

slide-10
SLIDE 10

Schlumberger Private 10 White Group 8/7/2009

Targeting

Drillers Target

– Area where drilled well needs to be located to comply with design criteria – Function of EOU and geological target

slide-11
SLIDE 11

Schlumberger Private 11 White Group 8/7/2009

DO Example (Geological Target)

slide-12
SLIDE 12

Schlumberger Private 12 White Group 8/7/2009

EOU Computed at Target

Comments Measured Depth Inclination Azimuth TVD Vertical Section NS EW DLS Semi-Axis Major NEV Semi-Axis Minor NEV EOU Unc Vertical Major Axis Azimuth NEV ( ft ) ( deg ) ( deg ) ( ft ) ( ft ) ( ft ) ( ft ) ( deg/100 ft ) ( ft ) ( ft ) ( ft ) ( deg )

9375.00 45.00 238.29 8706.07 1782.33

  • 936.81
  • 1516.27

0.00 60.22 23.08 15.16 148.97 9400.00 45.00 238.29 8723.75 1800.01

  • 946.10
  • 1531.31

0.00 60.77 23.17 15.29 148.96

MRL20 9423.21 45.00 238.29 8740.16 1816.42 -954.72

  • 1545.28

0.00 61.28 23.24 15.40 148.96

9425.00 45.00 238.29 8741.42 1817.68

  • 955.39
  • 1546.35

0.00 61.32 23.25 15.41 148.96 9450.00 45.00 238.29 8759.10 1835.36

  • 964.68
  • 1561.39

0.00 61.86 23.34 15.54 148.96

slide-13
SLIDE 13

Schlumberger Private 13 White Group 8/7/2009

Driller Target

slide-14
SLIDE 14

Schlumberger Private 14 White Group 8/7/2009

  • 1200
  • 1100
  • 1000
  • 900
  • 800
  • 700
  • 600
  • 1200
  • 1100
  • 1000
  • 900
  • 800
  • 700
  • 600
  • 2000
  • 1900
  • 1800
  • 1700
  • 1600
  • 1500
  • 1400
  • 1300
  • 1200
  • 2000
  • 1900
  • 1800
  • 1700
  • 1600
  • 1500
  • 1400
  • 1300
  • 1200

<<< W Scale = 1:100(ft) E >>>

8 7 T V D 8 6 T V D 8 8 T V D 8 4 T V D 8 5 T V D 8 6 T V D 8 7 T V D 8 8 T V D 8 9 T V D 8 5 T V D 9 T V D 9 1 T V D 9 2 T V D 9 1 T V D 9 T V D 9 2 T V D

Target Sizing 9-MLL-9D-RJ Target Sizing

8 4 T V D

9-MLL-9D-RJS V4.0

Geological Target R=300 Ft Drillers Target R=240 Ft EOU R=60 Ft

MWD Std Surveys

slide-15
SLIDE 15

Schlumberger Private 15 White Group 8/7/2009

References

Power Plan Manual; Chapter 4 “Trajectory

Design”; August 2002

Survey Uncertainties, Survey Accuracy and

Target Sizing; Intouch ticket ID#3017487

KPI’s – DD Services

http://www.hub.slb.com/Docs/DandM/MEA_DEC/KPIs_- _DD_Services_English2.xls http://www.hub.slb.com/Docs/DandM/MEA_DEC/KPIs_- _DD_Services_Metric2.xls