17 th INTERNATIONAL CONFERENCE & EXHIBITION ON 17 th INTERNATIONAL CONFERENCE & EXHIBITION LIQUEFIED NATURAL GAS (LNG 17) ON LIQUEFIED NATURAL GAS (LNG 17) Engineering, Procurement, and Construction Challenges of the Mt. Hayes LNG


slide-1
SLIDE 1

<Title of Presentation> By: <Author Name>, <Organization> <Date>

<Title of Presentation>

By: <Author Name>, <Organization> <Date>

17th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Engineering, Procurement, and Construction Challenges of the Mt. Hayes LNG Peakshaving Facility

By: Matthew E. Stobart PE, CB&I April 18, 2013

17th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

slide-2
SLIDE 2

Mt Hayes LNG Peak Shaving Facility

slide-3
SLIDE 3

OWNER AND LOCATION

  • FortisBC Energy
  • Vancouver Island, British Columbia,

Canada

  • Commissioned May 2011
  • Roughly 9 miles (15 kilometers) South
  • f City of Nanaimo
  • Backside and near top of Mt Hayes at

920 foot elevation (280 meters)

slide-4
SLIDE 4

MT HAYES LOCATION

VANCOUVER ISLAND, BRITISH COLUMBIA, CANADA

slide-5
SLIDE 5

MT HAYES LOCATION

ROUGHLY 9 MILES SOUTH OF NANAIMO

Nanaimo

slide-6
SLIDE 6

FACILITY DESCRIPTION

  • 1.5 bscf (70,500 cu meter) Single

Containment Steel LNG Tank

slide-7
SLIDE 7

FACILITY DESCRIPTION

  • 1.5 bscf (70,500 cu meter) Single

Containment Steel LNG Tank

  • 7.5 mmscfd Mixed Refrigerant

Liquefaction System

slide-8
SLIDE 8

FACILITY DESCRIPTION

  • 1.5 bscf (70,500 cu meter) Single

Containment Steel LNG Tank

  • 7.5 mmscfd Mixed Refrigerant

Liquefaction System

  • 150 mmscfd (peak) Shell and Tube

Sendout (Vaporization) System

slide-9
SLIDE 9

FACILITY DESCRIPTION

  • 1.5 bscf (70,500 cu meter) Single

Containment Steel LNG Tank

  • 7.5 mmscfd Mixed Refrigerant

Liquefaction System

  • 150 mmscfd (peak) Shell and Tube

Sendout (Vaporization) System

  • Amine Pretreatment (CO2

Removal) System

slide-10
SLIDE 10

PROCESS GRAPHIC

AMINE PRETREATMENT (CO2 Removal) 7.5 MMSCFD MRL LIQUEFIER PRESSURE LETDOWN 1.5 BSCF LNG TANK 150 MMSCFD VAPORIZATION FORTIS PIPELINE (2160 MAOP) BOILOFF COMPRESSION TAILGAS LINE HEATER

slide-11
SLIDE 11

CONSTRUCTION CHALLENGES

  • Site Blasted out of Rock
slide-12
SLIDE 12

SITE BLASTED OUT OF ROCK

LOTS OF ROCK BLASTING AND CRUSHING

slide-13
SLIDE 13

SITE BLASTED OUT OF ROCK

TANK FOUNDATION EXCAVATION

slide-14
SLIDE 14

SITE BLASTED OUT OF ROCK

SUMP EXCAVATION

slide-15
SLIDE 15

CONSTRUCTION CHALLENGES

  • Site Blasted out of Rock
  • Steep Climb Up to the Facility
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18

CONSTRUCTION CHALLENGES

  • Site Blasted out of Rock
  • Steep Climb Up to the Facility
  • Site is Very Wet (High Precipitation –

Lots of Snow)

slide-19
SLIDE 19

SITE IS VERY WET - SNOW

slide-20
SLIDE 20

LOTS OF SNOW

slide-21
SLIDE 21

LOTS AND LOTS OF SNOW

slide-22
SLIDE 22

TONS OF SNOW !!!

slide-23
SLIDE 23

ENGINEERING CHALLENGES

  • High Pressure Pipeline Interface
slide-24
SLIDE 24

PROCESS GRAPHIC

AMINE PRETREATMENT (CO2 Removal) 7.5 MMSCFD MRL LIQUEFIER PRESSURE LETDOWN 1.5 BSCF LNG TANK 150 MMSCFD VAPORIZATION FORTIS PIPELINE (2160 MAOP) BOILOFF COMPRESSION TAILGAS LINE HEATER

slide-25
SLIDE 25

ENGINEERING CHALLENGES

  • High Pressure Pipeline Interface
  • Low Pipeline Flow-by Rates
slide-26
SLIDE 26

PROCESS GRAPHIC

AMINE PRETREATMENT (CO2 Removal) 7.5 MMSCFD MRL LIQUEFIER PRESSURE LETDOWN 1.5 BSCF LNG TANK 150 MMSCFD VAPORIZATION FORTIS PIPELINE (2160 MAOP) BOILOFF COMPRESSION TAILGAS LINE HEATER

slide-27
SLIDE 27

ENGINEERING CHALLENGES

  • High Seismic Zone
  • High Pressure Pipeline Interface
  • Low Pipeline Flow-by Rates
slide-28
SLIDE 28

Mt Hayes LNG Peak Shaving Facility