engineering procurement and construction challenges of
play

Engineering, Procurement, and Construction Challenges of the Mt. - PowerPoint PPT Presentation

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON 17 th INTERNATIONAL CONFERENCE & EXHIBITION LIQUEFIED NATURAL GAS (LNG 17) ON LIQUEFIED NATURAL GAS (LNG 17) Engineering, Procurement, and Construction Challenges of the Mt. Hayes LNG


  1. 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON 17 th INTERNATIONAL CONFERENCE & EXHIBITION LIQUEFIED NATURAL GAS (LNG 17) ON LIQUEFIED NATURAL GAS (LNG 17) Engineering, Procurement, and Construction Challenges of the Mt. Hayes LNG <Title of Presentation> <Title of Presentation> Peakshaving Facility By: <Author Name>, <Organization> By: <Author Name>, <Organization> <Date> <Date> By: Matthew E. Stobart PE, CB&I April 18, 2013

  2. Mt Hayes LNG Peak Shaving Facility

  3. OWNER AND LOCATION • FortisBC Energy • Vancouver Island, British Columbia, Canada • Commissioned May 2011 • Roughly 9 miles (15 kilometers) South of City of Nanaimo • Backside and near top of Mt Hayes at 920 foot elevation (280 meters)

  4. MT HAYES LOCATION VANCOUVER ISLAND, BRITISH COLUMBIA, CANADA

  5. MT HAYES LOCATION Nanaimo ROUGHLY 9 MILES SOUTH OF NANAIMO

  6. FACILITY DESCRIPTION • 1.5 bscf (70,500 cu meter) Single Containment Steel LNG Tank

  7. FACILITY DESCRIPTION • 1.5 bscf (70,500 cu meter) Single Containment Steel LNG Tank • 7.5 mmscfd Mixed Refrigerant Liquefaction System

  8. FACILITY DESCRIPTION • 1.5 bscf (70,500 cu meter) Single Containment Steel LNG Tank • 7.5 mmscfd Mixed Refrigerant Liquefaction System • 150 mmscfd (peak) Shell and Tube Sendout (Vaporization) System

  9. FACILITY DESCRIPTION • 1.5 bscf (70,500 cu meter) Single Containment Steel LNG Tank • 7.5 mmscfd Mixed Refrigerant Liquefaction System • 150 mmscfd (peak) Shell and Tube Sendout (Vaporization) System • Amine Pretreatment (CO2 Removal) System

  10. PROCESS GRAPHIC BOILOFF COMPRESSION TAILGAS LINE • 1.5 BSCF LNG TANK AMINE 7.5 MMSCFD PRETREATMENT MRL LIQUEFIER HEATER (CO2 Removal) PRESSURE LETDOWN 150 MMSCFD VAPORIZATION FORTIS PIPELINE (2160 MAOP)

  11. CONSTRUCTION CHALLENGES • Site Blasted out of Rock

  12. SITE BLASTED OUT OF ROCK LOTS OF ROCK BLASTING AND CRUSHING

  13. SITE BLASTED OUT OF ROCK TANK FOUNDATION EXCAVATION

  14. SITE BLASTED OUT OF ROCK SUMP EXCAVATION

  15. CONSTRUCTION CHALLENGES • Site Blasted out of Rock • Steep Climb Up to the Facility

  16. CONSTRUCTION CHALLENGES • Site Blasted out of Rock • Steep Climb Up to the Facility • Site is Very Wet (High Precipitation – Lots of Snow)

  17. SITE IS VERY WET - SNOW

  18. LOTS OF SNOW

  19. LOTS AND LOTS OF SNOW

  20. TONS OF SNOW !!!

  21. ENGINEERING CHALLENGES • High Pressure Pipeline Interface

  22. PROCESS GRAPHIC BOILOFF COMPRESSION TAILGAS LINE • 1.5 BSCF LNG TANK AMINE 7.5 MMSCFD PRETREATMENT MRL LIQUEFIER HEATER (CO2 Removal) PRESSURE LETDOWN 150 MMSCFD VAPORIZATION FORTIS PIPELINE (2160 MAOP)

  23. ENGINEERING CHALLENGES • High Pressure Pipeline Interface • Low Pipeline Flow-by Rates

  24. PROCESS GRAPHIC BOILOFF COMPRESSION TAILGAS LINE • 1.5 BSCF LNG TANK AMINE 7.5 MMSCFD PRETREATMENT MRL LIQUEFIER HEATER (CO2 Removal) PRESSURE LETDOWN 150 MMSCFD VAPORIZATION FORTIS PIPELINE (2160 MAOP)

  25. ENGINEERING CHALLENGES • High Pressure Pipeline Interface • Low Pipeline Flow-by Rates • High Seismic Zone

  26. Mt Hayes LNG Peak Shaving Facility

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend