Engineering and Operations Committee Item 6b August 15, 2016 Background Schedule Review Progress on Demonstration Plant Feasibility Report Methodology Progress on Feasibility Study Funding Update Next Steps E&O Committee Item 6b


  1. Engineering and Operations Committee Item 6b August 15, 2016

  2. Background Schedule Review Progress on Demonstration Plant Feasibility Report Methodology Progress on Feasibility Study Funding Update Next Steps E&O Committee Item 6b Slide 2 Aug 15, 2016

  3. Regional Approach Meets Resource Needs Significant, reliable new supply Up to 150 MGD Favorably located to meet multiple member agency needs Importance of timing Addresses Uncertainty Climate change Variations in existing supplies Demographic & economic change Emergency & seismic events

  4. Joint Water Pollution Control Plant Item 8-3 March 7, 2016 E&O Committee

  5. E&O Committee Item 6b Slide 5 Aug 15, 2016

  6. September 2015 – Board information letter October 2015 – Board presentation November 2015 – Board action letter Appropriated $15 million in capital funds Authorized recycled water demonstration project Authorized feasibility and financing studies Authorized agreement with LA County Sanitation District No. 2 for development of potential regional recycled water program March 2016 – Board action letter Awarded consultant agreements for demo plant E&O Committee Item 6b Slide 6 Aug 15, 2016

  7. 2017 2016 2018 2019 Demo Plant Design Construction Operation Feasibility Study Finance Plan Full-Scale Program (pending Board action) Legend Demonstration Program Board Action/Information Advisory Panel Meetings Full-Scale Program

  8. Purpose To ensure quality of purified water for groundwater recharge Anticipated Activities Provide water quality data for regulatory acceptance Coordinate operations with LACSD to ensure source quality and treatment Optimize full-scale treatment process design Establish cost clarity for treatment Provide vehicle for public outreach & acceptance E&O Committee Item 6b Slide 8 Aug 15, 2016

  9. Demo Plant Site Full Scale Plant Site

  10. Executed agreement with LACSD for Demonstration Plant per Board authorization Advisory Panel Report on Demonstration Plant complete and posted on Metropolitan website Final design 50% complete Evaluation of 0.5 mgd facility indicates potential cost savings while meeting design goals and objectives Advisory Panel concurs with re-sizing plant E&O Committee Item 6b Slide 10 Aug 15, 2016

  11. 1 1. No Fatal Flaws? Regulatory Setting and Public Acceptance Requirements Base Case Treatment Plant Groundwater Basins Storage, and Transmission Systems Spreading and Well Capacities Overall System Operations and Water Management 2 2. Justified and Cost Effective? Total System Capital and O&M Evaluation of Regional Costs Benefits 3 3. Fair and Financing Plan, Rate Structure and Rate Reasonable Rates Impacts and Charges?

  12. Developed technical analyses and cost estimates for treatment, conveyance, and groundwater basins Obtained Advisory Panel concurrence with feasibility methodology and approach Meetings with various Member Agencies and Groundwater Basins on-going Regulatory coordination on-going Draft report on-schedule for review by Advisory Panel in late September E&O Committee Item 6b Slide 14 Aug 15, 2016

  13. Applications prepared for State Water Resources Control Board’s Water Recycling Funding Program Planning Grants Up to $75,000 available for each planning project Total of $525,000 requested for 7 projects Construction Grant $1 million of Prop 1 – Recycled Water Construction Grants funding identified E&O Committee Item 6b Slide 15 Aug 15, 2016

  14. Complete Feasibility Study Complete Financial Evaluation Complete final design of Demonstration Plant Hold Advisory Panel review of Feasibility Study Hold third regulatory coordination meeting Board Report and discussion in November Recommendation to Board in December E&O Committee Item 6b Slide 16 Aug 15, 2016

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.