Monday, December 18, 2017 1 Region 8: Woodbury Transit & Economic Development Hub (Route 17 at Route 32 - Exit 131) Reconstruction Project Thursday, December 14, 2017 2 Agenda Welcome & Team Introductions Project Update


  1. Monday, December 18, 2017 1 Region 8: Woodbury Transit & Economic Development Hub (Route 17 at Route 32 - Exit 131) Reconstruction Project Thursday, December 14, 2017

  2. 2 Agenda • Welcome & Team Introductions • Project Update • Project Overview • Open House Format & Comments

  3. 3 Project Update • RFP process • Procurement process

  4. 4 Project Benefits • Improved levels of service/travel time • Improved safety • Fewer environmental impacts • Utility upgrades

  5. 5 Project Overview

  6. 6 Benefits of the Project • Improved access to the surrounding retail, school, highway, & local roadways • Minimizes impact on local neighborhoods and businesses during construction • Minimizes conflict points and increased safety • Simplifies driver navigation • Relocate existing overhead utilities underground

  7. Exit 131 Eastbound Ramps at Route 32 Proposed Existing • Two phase signals along Route 32 • Three phase signals along Route 32 • Three travel lanes and a left turn bay on Route 32 • Two travel lanes and a left turn bay along Route 32

  8. 8

  9. 9

  10. Exit 131 Westbound Ramps/Nininger Road at Route 32 Proposed Existing • Route 17 WB Off-Ramp gets maximum allowable time • Route 17 WB Off-Ramp has minimal time to depending on Route 32 traffic conditions access Route 32 • Two right turn lanes from Route 32 to Nininger Road • One right turn lane from Route 32 southbound to • Nininger Road Extension separates local traffic and Nininger Road connect to Woodbury Common Premium Outlets on the south side

  11. Route 32 Corridor Between US 6 and Route 17 Proposed Existing • Three travel lanes on Route 32 with turn lanes • Two travel lanes on Route 32 with turn lanes • Three approach lanes off of Route 6 • Two approach lanes off of Route 6 • Park-N-Ride holds 200 vehicles • Park-N-Ride holds 100 vehicles

  12. Route 32 Corridor Between Woodbury Commons and School Proposed Existing • Two northbound lanes entering Woodbury Commons • One northbound lane enters Woodbury Commons • One exit from Woodbury Commons to Route 32 and • Two exits from Woodbury Commons to Route 32 one to the Nininger Road Extension • Two travel lanes in each direction on Route 32 • Three travel lanes in each direction on Route 32

  13. 13

  14. 14 Project Timeline • Minor construction activities start winter of 2018 • Major construction activities start spring of 2018 • Route 32 southbound work completed fall of 2018 • Route 17 eastbound work completed winter of 2018 • Route 32 northbound work completed/DDI implementation late summer of 2019 • Route 17 westbound work completed late summer of 2019 • Project completion fall of 2019

  15. 15 Open House • Staff to answer questions • Stenographer to collect comments • Comment forms & comment box • Sign up for project updates & information

  16. 16 Divergent Diamond Design • FHWA video (https://www.youtube.com/watch?v=BcxUaNLaJVM)

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.