DUNE News and Introduction Stefan Sldner-Rembold Ed Blucher - - PowerPoint PPT Presentation

dune news and introduction
SMART_READER_LITE
LIVE PREVIEW

DUNE News and Introduction Stefan Sldner-Rembold Ed Blucher - - PowerPoint PPT Presentation

DUNE News and Introduction Stefan Sldner-Rembold Ed Blucher Collaboration Call 6 March 2020 Fermilab ..Busy Schedule(many dates omitted) Collaboration Meeting, Fermilab (Sep 23-27) DESY MPD/ND Workshop, DESY (Oct 21-23) DOE


slide-1
SLIDE 1

DUNE News and Introduction

Stefan Söldner-Rembold Ed Blucher Collaboration Call 6 March 2020 Fermilab

slide-2
SLIDE 2

..Busy Schedule…(many dates omitted)

  • Collaboration Meeting, Fermilab (Sep 23-27)
  • DESY MPD/ND Workshop, DESY (Oct 21-23)
  • DOE IPR, Fermilab (Oct 29-31)
  • “Module of Opportunity” Workshop, BNL (Nov 11-12),
  • LBNC Meeting, CERN (Dec 2-5)
  • Collaboration Meeting, CERN (Jan 27-31)
  • DUNE ND Workshop, TIFR, India (Feb 27-29)
  • LBNC Meeting at FNAL (March 4-6)
  • RRB Meeting at FNAL (April 2-3)
  • LBNF/DUNE Director’s Review at FNAL (April 28 – May 1)
  • Collaboration Meeting at SURF (May 18-22) (tbc)

Collaboration Call - 6 March 2020 2

slide-3
SLIDE 3

Next Collaboration Meeting (tbc)

3 Collaboration Call - 6 March 2020

  • We will make final decision about the meeting on April 1.
  • We recommend to make no bookings until then.
slide-4
SLIDE 4

4 Collaboration Call - 6 March 2020

  • Invitation for one DUNE and one LBNF talk
  • Contact dune-sc@fnal.gov for speaker nominations (and poster abstracts)
slide-5
SLIDE 5

This week: LBNC meeting

5

  • LBNC Meeting held at Fermilab, 4-6 March
  • Presentations on ProtoDUNE-SP/DP operations and analysis, Near Detector

Status, Computing, Reconstruction.

  • Presented impressive progress on all these topics
  • https://web.fnal.gov/organization/LBNC/LBNC%20Meeting%20-

%20March%202020/_layouts/15/start.aspx#/

  • LBNC currently in closed session preparing feedback.
  • You can find LBNC reports on DocDB:

https://docs.dunescience.org/cgi-bin/private/ShowDocument?docid=14425

Collaboration Call - 6 March 2020

slide-6
SLIDE 6

Path towards CD2

6

  • Schedule and scope to be finalized during the CD2 baselining

process, in the second half of 2020.

  • Challenge to stay within the total envelope of $2.6B for the total

project cost (TPC).

  • Also need to reduce uncertainty (e.g., due to international

contributions, NSF funding for APAs etc.).

  • Announcement of Hyper-K has further underlined the

importance of building a competitive experiment, achieving P5 physics goals on the shortest possible time scale.

  • We work with DOE and all international partners to balance

these requirements.

Collaboration Call - 6 March 2020

slide-7
SLIDE 7

Effort Reporting - 2019

  • Effort Reporting for 2018 (”beta release”) had some weaknesses due to lack of

some important topics and consistent “FTE” reporting; corrected for this year.

  • We also hope that we have created enough topics to capture the effort that

has been on-going over the past year – balancing granularity and completeness.

  • We will be updating the list of activities annually to best match the activities of

the collaboration – balancing granularity and completeness.

  • IB Representatives work with their institute members to collect accurate data

and get it entered into the database by March 1, 2020:

Collaboration Call - 6 March 2020 7

slide-8
SLIDE 8

HyperK Schedule

Collaboration Call - 6 March 2020 8

slide-9
SLIDE 9

First ProtoDUNE-SP paper in ARC review

9 Collaboration Call - 6 March 2020

slide-10
SLIDE 10

ProtoDUNE Analysis

10

  • Implementing the LBNC recommendation, we have created an

integrated ProtoDUNE SP/DP analysis group structure.

  • Single-phase conveners:
  • Tingjun Yang (Fermilab), Georgios Christodoulou (CERN)
  • Dual-phase conveners:
  • Jaime Dawson (APC Paris), Slavic Galymov (IPNL)
  • Analysis groups have alternating joint and separate meetings.
  • All collaborators are encouraged to contribute – contact conveners

Collaboration Call - 6 March 2020

slide-11
SLIDE 11

Technical Design Report

11 Collaboration Call - 6 March 2020

slide-12
SLIDE 12

Technical Design Report

12 Collaboration Call - 6 March 2020

  • Volumes I-IV published on

arXiv.

  • Technical Volumes submitted

to JINST

  • Three physics papers based
  • n Physics Volume to be

submitted to EPJC (currently in ARC review).

  • Long baseline physics
  • Supernova physics
  • BSM physics
slide-13
SLIDE 13

”Claiming” papers (e.g. TDR)

13

1. Go to INSPIRES (not beta version) https://inspirehep.net/ 2. Click on HEPNAMES 3. Search for your profile, e.g. ’find a Einstein, A.’ 4. Click on your ‘Author Profile’ 5. Click on ‘Manage Publications’ 6. Scroll through your publications and click on ‘yes, this paper is by this person’ for all relevant papers (you can do this in bulk). 7. You can also unassign papers if they are not yours. 8. Then confirm. This will allow you to claim the papers and link to your ORCID.

Collaboration Call - 6 March 2020

slide-14
SLIDE 14

Near Detector Organization

The EB has endorsed the formation of three new Consortia:

1.

Liquid-argon TPC

  • Based on ArgonCube concept

2.

Multipurpose Detector

  • Magnetized gas argon spectrometer, Calorimeter, Muon system

3.

Beam Monitor

  • On-axis Beam Monitor based on SAND design using the KLOE magnet

and calorimeter, and 3DST/tracker. Each consortium will have a CL (represented on EB/TB) and a TL (represented on TB) In addition, we create a ND DAQ Task Force which will explore the future structure (Common FD/ND DAQ Consortium vs. separate consortia). The NDDG will remain in place for the time being, in a modified form, which includes the new consortia leadership teams. The creation of the consortia and the appointment of the CLs/TLs proceeds in the same way as for the FD consortia.

Collaboration Call - 6 March 2020 14

slide-15
SLIDE 15

DUNE Near Detector

15

  • Next steps
  • CDR in April 2020 (Editors: Steven Manly and Mike Kordosky)
  • ArgonCube 2x2 demonstrator à ProtoDUNE-ND (at Bern and

FNAL)

  • Call for ND Consortium EOIs has gone out, deadline March 6.
  • NDDG will continue in modified form to provide coordination of effort

through TDR.

  • Possible IDR in autumn 2020 (preliminary design level, as required

for near site CD-2 in US)

  • TDR about 1 year after IDR

Collaboration Call - 6 March 2020

slide-16
SLIDE 16

16 Collaboration Call - 6 March 2020