DUNE News and Introduction Stefan Sldner-Rembold Ed Blucher Collaboration Call 6 March 2020 Fermilab ..Busy Schedule(many dates omitted) Collaboration Meeting, Fermilab (Sep 23-27) DESY MPD/ND Workshop, DESY (Oct 21-23) DOE
..Busy Schedule…(many dates omitted)
- Collaboration Meeting, Fermilab (Sep 23-27)
- DESY MPD/ND Workshop, DESY (Oct 21-23)
- DOE IPR, Fermilab (Oct 29-31)
- “Module of Opportunity” Workshop, BNL (Nov 11-12),
- LBNC Meeting, CERN (Dec 2-5)
- Collaboration Meeting, CERN (Jan 27-31)
- DUNE ND Workshop, TIFR, India (Feb 27-29)
- LBNC Meeting at FNAL (March 4-6)
- RRB Meeting at FNAL (April 2-3)
- LBNF/DUNE Director’s Review at FNAL (April 28 – May 1)
- Collaboration Meeting at SURF (May 18-22) (tbc)
Collaboration Call - 6 March 2020 2
Next Collaboration Meeting (tbc)
3 Collaboration Call - 6 March 2020
- We will make final decision about the meeting on April 1.
- We recommend to make no bookings until then.
4 Collaboration Call - 6 March 2020
- Invitation for one DUNE and one LBNF talk
- Contact dune-sc@fnal.gov for speaker nominations (and poster abstracts)
This week: LBNC meeting
5
- LBNC Meeting held at Fermilab, 4-6 March
- Presentations on ProtoDUNE-SP/DP operations and analysis, Near Detector
Status, Computing, Reconstruction.
- Presented impressive progress on all these topics
- https://web.fnal.gov/organization/LBNC/LBNC%20Meeting%20-
%20March%202020/_layouts/15/start.aspx#/
- LBNC currently in closed session preparing feedback.
- You can find LBNC reports on DocDB:
https://docs.dunescience.org/cgi-bin/private/ShowDocument?docid=14425
Collaboration Call - 6 March 2020
Path towards CD2
6
- Schedule and scope to be finalized during the CD2 baselining
process, in the second half of 2020.
- Challenge to stay within the total envelope of $2.6B for the total
project cost (TPC).
- Also need to reduce uncertainty (e.g., due to international
contributions, NSF funding for APAs etc.).
- Announcement of Hyper-K has further underlined the
importance of building a competitive experiment, achieving P5 physics goals on the shortest possible time scale.
- We work with DOE and all international partners to balance
these requirements.
Collaboration Call - 6 March 2020
Effort Reporting - 2019
- Effort Reporting for 2018 (”beta release”) had some weaknesses due to lack of
some important topics and consistent “FTE” reporting; corrected for this year.
- We also hope that we have created enough topics to capture the effort that
has been on-going over the past year – balancing granularity and completeness.
- We will be updating the list of activities annually to best match the activities of
the collaboration – balancing granularity and completeness.
- IB Representatives work with their institute members to collect accurate data
and get it entered into the database by March 1, 2020:
Collaboration Call - 6 March 2020 7
HyperK Schedule
Collaboration Call - 6 March 2020 8
First ProtoDUNE-SP paper in ARC review
9 Collaboration Call - 6 March 2020
ProtoDUNE Analysis
10
- Implementing the LBNC recommendation, we have created an
integrated ProtoDUNE SP/DP analysis group structure.
- Single-phase conveners:
- Tingjun Yang (Fermilab), Georgios Christodoulou (CERN)
- Dual-phase conveners:
- Jaime Dawson (APC Paris), Slavic Galymov (IPNL)
- Analysis groups have alternating joint and separate meetings.
- All collaborators are encouraged to contribute – contact conveners
Collaboration Call - 6 March 2020
Technical Design Report
11 Collaboration Call - 6 March 2020
Technical Design Report
12 Collaboration Call - 6 March 2020
- Volumes I-IV published on
arXiv.
- Technical Volumes submitted
to JINST
- Three physics papers based
- n Physics Volume to be
submitted to EPJC (currently in ARC review).
- Long baseline physics
- Supernova physics
- BSM physics
”Claiming” papers (e.g. TDR)
13
1. Go to INSPIRES (not beta version) https://inspirehep.net/ 2. Click on HEPNAMES 3. Search for your profile, e.g. ’find a Einstein, A.’ 4. Click on your ‘Author Profile’ 5. Click on ‘Manage Publications’ 6. Scroll through your publications and click on ‘yes, this paper is by this person’ for all relevant papers (you can do this in bulk). 7. You can also unassign papers if they are not yours. 8. Then confirm. This will allow you to claim the papers and link to your ORCID.
Collaboration Call - 6 March 2020
Near Detector Organization
The EB has endorsed the formation of three new Consortia:
1.
Liquid-argon TPC
- Based on ArgonCube concept
2.
Multipurpose Detector
- Magnetized gas argon spectrometer, Calorimeter, Muon system
3.
Beam Monitor
- On-axis Beam Monitor based on SAND design using the KLOE magnet
and calorimeter, and 3DST/tracker. Each consortium will have a CL (represented on EB/TB) and a TL (represented on TB) In addition, we create a ND DAQ Task Force which will explore the future structure (Common FD/ND DAQ Consortium vs. separate consortia). The NDDG will remain in place for the time being, in a modified form, which includes the new consortia leadership teams. The creation of the consortia and the appointment of the CLs/TLs proceeds in the same way as for the FD consortia.
Collaboration Call - 6 March 2020 14
DUNE Near Detector
15
- Next steps
- CDR in April 2020 (Editors: Steven Manly and Mike Kordosky)
- ArgonCube 2x2 demonstrator à ProtoDUNE-ND (at Bern and
FNAL)
- Call for ND Consortium EOIs has gone out, deadline March 6.
- NDDG will continue in modified form to provide coordination of effort
through TDR.
- Possible IDR in autumn 2020 (preliminary design level, as required
for near site CD-2 in US)
- TDR about 1 year after IDR
Collaboration Call - 6 March 2020
16 Collaboration Call - 6 March 2020