Drivers of Climate Change & What We Must Do
World On Your Plate Daemen College
Charley Bowman Renewable Energy Task Force WNY Peace Center Inc. RenewableEnergy@WNYPeace.org
October 11, 2014
Drivers of Climate Change C N N RenewableEnergy@WNYPeace.org Y - - PowerPoint PPT Presentation
E N E R G E Y L B A W w a b l e E T n e e E n r A e g R y S N K N E % R O 0 F 0 W O F 1 R ! U C B E W . Drivers of Climate Change C N N RenewableEnergy@WNYPeace.org Y I , R MMXIII P E E
Drivers of Climate Change & What We Must Do
World On Your Plate Daemen College
Charley Bowman Renewable Energy Task Force WNY Peace Center Inc. RenewableEnergy@WNYPeace.org
October 11, 2014
Temperature anomaly (°C) relative to 1961–1990 Observed change in surface temperature 1901–2012
−0.6 −0.4 −0.2 0.0 0.2 0.4 0.6
Annual average
1850 1900 1950 2000
(°C) Observed globally averaged combined land and ocean surface temperature anomaly 1850–2012
−0.6 −0.4 −0.2 0.2 0.4 0.6 0.8 1.0 1.25 1.5 1.75 2.5
Year
1950 1960 1970 1980 1990 2000 2010 300 320 340 360 380 400
Year CO2 (ppm)
Atmospheric CO2
https://scripps.ucsd.edu/programs/keelingcurve/
Atmospheric Greenhouse Gases
( ) ( ) ( )
CO2 CH4 N2O
CO2 CH4 N2O
( ) ( ) ( )
CO2 CH4 N2O
1 2 3
Age (Ma)
100 200 300 400 500
Atmospheric CO2 (ppm)
d d d
Atmospheric CO2
Millions of Years Ago
10 20 30 40 50 60
Age (Ma)
100 200 500 1000 2000
Atmospheric CO2 (ppm)
CO2 proxies
Phytoplankton Boron Stomata Liverworts Nahcolite Paleosols
d d d
Atmospheric CO2
Millions of Years Ago
1 2 3 4 5 1000 2000 3000 4000 5000 6000 7000 8000 Cumulative total anthropogenic CO2 emissions from 1870 (GtCO2) Temperature anomaly relative to 1861–1880 (°C) 500 1000 1500 2000 Cumulative total anthropogenic CO2 emissions from 1870 (GtC) 2500
2050 2100 2100 2030 2050 2100 2100 2050 2030 2010 2000 1980 1890 1950 2050
RCP2.6 Historical RCP4.5 RCP6.0 RCP8.5 RCP range 1% yr -1 CO2 1% yr -1 CO2 range
Who Generates the CO2?
Energy Transportation Industry Ag,deForest.
Atmospheric CO2 from Bottom Up Approach
Oil, coal & gas industries report numbers: 1 trillion bbl oil, 160 billion tons coal, 1037 trillion cubic feet gas Chemistry: Burning 1 gram of fossil fuel (coal, gasoline, methane,
Coal + Oil + Methane = 1.2 x 1015kg CO2 Fossil fuel CO2: 1/2 into oceans + 1/2 into atmosphere Ancient CO2 atmosphere 300 ppm + 75 ppm fossil = 375 ppm CO2
Thanks to the fossil fuel industry for the data and Tom Murphy http://physics.ucsd.edu/do-the-math/2011/08/recipe-for-climate-change/#
Current State of Affairs in NYS
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 10−1 100 101 102 103 104 105 106
NY SUN Goal, 2025 Sierra Niagara Group Wind Goal, 2018 Jacobson et al. Offshore Wind Goal, 2030 Onshore Wind Goal, 2030 Jacobson et al. Solar PV Goal, 2030Nuclear Methane + others M e t h a n e Coal Fuel Oil Kerosene Hydropower Wind Refuse Solid Waste W
W a s t e Sunlight B i
a s
Year
Electrical Energy Production (gWh)
Energy State of New York State
Clean Energy in NY State
; 2005 2006 2007 2008 2009 2010 2011 2012 2013 100 101 102 103 104 105 106
NY SUN Goal, 2025 Onshore Wind Goal, 2030 Jacobson et al. Offshore Wind Goal, 2030 Jacobson et al. Solar PV Goal, 2030 Wind Goal, 2018 Sierra Niagara Group Sources: NYISO Load & Capacity Data Onshore/Offshore Wind Capacity Factors = 22/35% Solar Capacity Factor = 10% Charley Bowman, 5/4/2014 Renewable Energy Task Force WNY Peace Center, Inc. RenewableEnergy@WNYPeace.orgConventional Hydro Biogas Pumped Storage Wind W
W a s t e Refuse Solid Waste S u n l i g h t
Year Electrical Energy (gWh)
New York State Renewable Energy
No Improvement in Clean Energy in 7 Years
2005 2006 2007 2008 2009 2010 2011 2012 2013 25 50 75 100
Year % of Total Energy Production
NY State Relative Fuel Use (%)
Clean Fossil Nuclear
What We Must Do...in New York State
◮ Vision: 100% Energy Generation from renewables by 2050 ◮ Transition from fossil fuels to renewable sources of energy:
wind,solar and geothermal
◮ Public Service Commission hold hearings on Jacobson Plan for
NYS
◮ Begin building renewable energy infrastructure capable of 110
GW (name plate)
◮ Stop burning coal (3% of NYS electrical power) ◮ Replace lost local/school taxes of ∼$25 million using NYPA
money
◮ Begin retraining/retirement of ∼ 400 coal plant workers using
NYPA money
Jacobson’s Renewable Energy Infrastructure...in NY State
◮ Residential rooftop solar panels: 6.1 GW ◮ Commercial/government rooftop solar panels: 5.4 GW ◮ Utility sized solar farms: 55 GW (1100 50 MW farms) ◮ Onshore wind: 5 GW (1,068 5 MW turbines) ◮ Offshore wind: 18 GW (3,653 5 MW turbines) ◮ Geothermal: 10 GW (100 100 MW plants) ◮ Hydro: 7 GW (already built) ◮ Biogas (landfills): 2 GW ◮ Total: 108 GW
Jobs in a 100% Renewable Energy Economy
Project years: 2016-2050 New permanent jobs added by 2050: 107,000 Old fossil fuels jobs lost by 2050: 50,000 Total Construction Costs: ∼$350 billion ($3.50/watt) $ Source: NYS Stock Transfer Tax: ∼$12 billion collected annually At 4% bond APR, stock transfer tax would almost cover annual payments
into
Charles Bowman Renewable Energy Task Force Western New York Peace Center, Inc. Buffalo, NY Tel: 716.332.3904 RenewableEnergy@WNYPeace.org http://www.WNYPeace.org
Niagara Falls Air Reserve Station Solar Farm
513 acres: 170 MWp−dc → 193 GWhac−yr Cost: ✩434 million Income: ✩15.4 million/year @ 8➣/kWh
Seneca Army Depot
5,515 acres: 1,838 MWp−dc → 2.30 TWhac−yr Cost: ✩3.78 billion Income: ✩183.7 million annually @ 8➣/kWh
Dunkirk NY Solar Park
65.7 acres: 22 MWp−dc → 27.7 GWhac−yr Cost: ✩56.2 million Income: ✩2.22 million/year @ 8➣/kWh
Lewiston Pump Storage Reservoir
1,860 acres: 620 MWp−dc → 710 GWhac−yr Cost: ✩1.52 billion Income: ✩56.8 million annually @ 8➣/kWh
+ underwater supports, or surface floats
716-332-3904
Niagara Falls Air Reserve Station Solar Farm - 170 MWp−dc
Project Construction Costs: ✩434 million 708,333 solar panels installed (e.g. Sun Power SPR-240E 240 watt panels) Local Spending: ✩205 million During Construction: On site Construction Jobs: 600 Related Jobs: 550 After Construction: O&M Costs: ✩2.3 million/year Permanent Jobs: 22 - 51 Income: ✩15.4 million annually (@8.0➣/kW-h; 193 GWhac) ✩ ✩ ✩ ➣
✩ ✩ ➣
Lewiston Pump Storage Facility Solar Farm - 591 MWp−dc
Project Construction Costs: ✩1.45 billion 2.462 million solar panels installed (e.g. Sun Power SPR-240E 240 watt panels) During Construction: On site construction jobs: 2,000 Related jobs: 1800 After Construction: O&M Costs: ✩4.8 million/year Permanent jobs: 71 - 177 Income: ✩54.1 million/year (@8.0➣/kW-h; 676 GWhac)
716-332-3904
Seneca Army Depot Solar Park - 1,838 MWp−dc
Project Construction Costs: ✩3.78 billion 7.658 million solar panels installed (e.g. Sun Power SPR-240E 240 Watt) Local Spending: ✩1.77 billion During Construction: On site Construction Jobs: 5,200 Related Jobs: 4,700 After Construction: O&M Costs: ✩19.8 million/year Permanent Jobs: 184 - 551 Income: ✩183.7 million annually (@8.0➣/kW-h; 2.295 TWhac) ✩ ✩ ✩ ➣
References
http://www.climatechange2013.org/ and WG1AR5_ALL_FINAL.pdf
group/efmh/jacobson/Articles/I/NewYorkWWSEnPolicy.pdf
08/recipe-for-climate-change/#
http://wnypeace.org/new/RenewableEnergy.html
http://wnypeace.org/new/RenewableEnergy.html