development of f aviation in infrastructure
play

Development of f Aviation In Infrastructure Mik ikael Maanstroem, - PowerPoint PPT Presentation

Stimulating In Investments in Financing the Development of f Aviation In Infrastructure Mik ikael Maanstroem, LF LFV GATM 2018-11 11-22 22 Examples of methods & tools -Intentions / Words actions & results -Priorities


  1. Stimulating In Investments in Financing the Development of f Aviation In Infrastructure Mik ikael Maanstroem, LF LFV GATM 2018-11 11-22 22

  2. Examples of methods & tools -Intentions / Words  actions & results -Priorities -Example: Regional airport A-CDM

  3. fining business model & value Defi http://www.businessmodelgeneration.com/

  4. Value Proposition % Stakeholder adoption % Operational requirements coverage Stakeholder Measure Stakeholder Stakeholder Gain creators Gains Creators Gain  Costumer jobs Products Pain  Pain Services relievers http://www.businessmodelgeneration.com/

  5. Architecture Capability Enterprise Programme Standards Operation Service System https://www.atmmasterplan.eu/

  6. https://www.atmmasterplan.eu/

  7. Prioritize

  8. irwise se Prioritize Passenger throughput pairwi on parision RW length CAT 3 omparisi ed pa << < X > >> imized com ptimi Opt

  9. ACD CDM-li lite te exa xample mple ES ESUT UT-ESSA ESSA

  10. o AFIS Operator SA o Airport Operator, Ground Handler, Security ESSA o Aircraft Operator, Flight Crew A-CDM CDM ors ESUT-ES actor o Air Traffic Control, Stockholm o ATC Tower Controller ESUT o ACC En-route Controller o Eurocontrol, Network Manager o Landside (Taxi, Buses, Hotel etc.)

  11. ins CDM Gains • Improve predictability, on-timeperformance • Reduce ground movement costs • Enhance use of ground handling resources A-CDM • Enhance use of stands, gates and terminals • Optimize use of AP infrastructure/reduce congestion • Flexible pre-departure planning • Reduce apron and taxiway congestion

  12. ACDM-lite ESUT-ESSA IE # Primary assets C I A 1 PA#1 Scheduled Flight Trajectory / NM Flight Data Service 4 3 2 2 PA#2 Target Off Block Time TOBT / Airport Flight Information Publication Service 3 2 2 3 PA#3 Target Start-Up Approval Time TSAT / Airport Flight Information Publication Service 3 2 2 3 PA#4 Target Take Off Time TTOT / Airport Flight Information Publication Service 3 2 2 4 PA#5 Actual Take Off Time ATOT / Airport Flight Information Publication Service 3 3 3 5 PA#6 Flight Update Message / NM Flight Data Service 3 3 2 6 PA#7 Radar Plot (Position, Altitude, Speed, Heading) 3 3 3 7 PA#8 Estimated Landing Time ELDT / Airport Flight Information Publication Arrival Service or SRA Management Information Service 4 3 2 8 PA#9 Actual Landing Time ALDT / Airport Flight Information Publication Service 3 2 2 Impact scale: 1 No impact; 2 Minor; 3 Severe; 4 Critical; 5 Catastrophic Prim imary Asset ID ID & Im Impact analysis from Enterprise Archit itecture, summary

  13. Summary ry • Know the business model • Focus stakeholder gains & pains • Use EA models to align, coordinate & plan • Prioritize • Keep it simple • Use supporting tools • Do cybersecurity risk analysis & mitigation • Useful even in small scale application • Horizon 2020/EU projects ?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend