design display grp structures
play

Design& Display GRP Structures case study:Barton Square Rotunda - PDF document

Design& Display GRP Structures case study:Barton Square Rotunda DESIGN & DISPLAY STRUCTURES Client: TOPS CLASSICAL VISION Bovis Lend Lease Market leading GRP expert Design & Display Structures has exhibited its classical


  1. Design& Display GRP Structures case study:Barton Square Rotunda DESIGN & DISPLAY STRUCTURES Client: TOPS CLASSICAL VISION Bovis Lend Lease Market leading GRP expert Design & Display Structures has exhibited its classical Architects: design prowess with a stunningly elaborate rotunda – 15m in diameter with turret and 19m wide simulated stone entablature – that perfectly rounds off Manchester’s Leach Rhodes Walker landmark £70 million Barton Square retail project. Project: Barton Square Rotunda Brief Trafford Centre, Manchester The latest instalment in a string of contracts at From the exterior, the archetypal blue-green Barton Square required a comprehensive design, rotunda, crowned by a detailed turret elevating Products: manufacture and installation solution to realise from its centre, cannot be missed. Together with Design, manufacture and the architect’s neo-classical bold vision. the Campanile Tower, located at the opposite end of the building, it provides a striking landmark that installation of 15m diameter Calling on influences from Italian classical is visible to shoppers, far and wide. Night time architecture, the Rotunda’s size and complex detail rotunda with turret and illumination via strings of light bulbs applied to the meant success relied heavily on Design & Display 19m wide simulated GRP surface add a further marketing dimension. Structures’ off-site construction methods, stone entablature efficient project management skills and dedication Benefits to partnering. The finished products were delivered to site in Project Duration: modular pieces and assembled at ground level into Its completion follows Design & Display Structures’ 9 Months much larger sections, complete with waterproofing design, manufacture and installation of the project’s “ seals between panels. These were then lowered by award winning Campanile Belfry last year. Design & Display met our full brief crane onto the steelwork structure, which reduced Altogether, the company’s collective contract value and the team were very helpful in the time working at height and, therefore, the on the development has now exceeded £1.2 million. scaffolding and access costs. finding the most cost-effective Solution approach to the designs we had. Using traditional materials it would have been In a highly recognisable classical style, the dome impossible to construct a design as vast as this in Their expertise in the features beautiful and ornate aesthetics inside as well the same time and budget. However, with Design as out. Internally, a shallower GRP liner with central design/fabrications and solution & Display Structures’ expertise, it was able to utilise boss and decorative cornice encases the supporting of complex GRP structures was an “ GRP’s lightweight nature and strength to produce steelwork. Design & Display Structures also provided the desired structure with maximum efficiency, on enormous benefit to us. the huge GRP entablature immediately below, time and within the tender sum. manufactured to match perfectly with the low level stone cladding. Adrian Davidson, Bovis Lend Lease. Design & Display Structures - The Studio, Amberley, Hempstead Road, Uckfield, East Sussex TN22 1DZ T: 0844 736 5995 E: grp@design-and-display.co.uk www.design-and-display.co.uk

  2. Design& Display GRP Structures case study:Campanile Tower, Barton Square A towering success for Client: Bovis Lend Lease Architects: Design & Display Structures Leach Rhodes Walker The crowning glory to the Barton Square Development in Manchester has been Project craned into place by UK experts in GRP , Design & Display Structures. The award winning Campanile, Barton Square Campanile was completed for October’s official topping out ceremony for the Products: multi-million pound retail project due to open in 2008. Bespoke stone finish cladding Brief Benefits for the Campanile and a striking lead coloured finial feature Design & Display Structures was tasked with Working in partnership with steel frame creator Project Duration: producing bespoke, stone appearance cladding William Hare, the masterpiece of GRP design for the belfry and a striking lead coloured finial was built at ground level so there was no need 6 months feature. It also had to be easily manoeuvrable for high level scaffolding. This brought by crane, allowing the belfry to be dropped significant time and cost savings for the client. “ into place atop the 67m high development Design & Display’s work also offered significant The finished Campanile is truly (a £70 million extension of the £1.6 billion environmental benefits for the client, as the stunning and the tower provides T rafford Centre). lightweight finished product is easily handled, requires minimal mechanical lifting and delivery a real focal point for the Solution payloads are reduced. This cuts the carbon Barton Square Development. costs of delivery, making GRP a very sustainable Under a six month £250,000 contract with solution over heavier, more cumbersome We are thrilled to have been main contractor Bovis Lend Lease, Design & construction alternatives. The Campanile, able to help the vision of Display Structures crafted the breathtaking built using innovative modular off site cladding for the 14m tall belfry. Design & production techniques, has since scooped architect Leach Rhodes Walker “ Display Structures also installed fibre optic lights Bovis’ Project Innovation Award 2007. come to life. throughout the finial and LEDs in the pediments Design & Display Structures offers a one stop for night time illumination. In addition they shop for GRP design, manufacture and Managing Director Allan Curtis designed an innovative maintenance solution installation and will be completing £1 million for changing the long life bulb in the worth of projects at Barton Square. hard-to-reach aircraft warning beacon. Design & Display Structures - The Studio, Amberley, Hempstead Road, Uckfield, East Sussex TN22 1DZ T: 0844 736 5995 E: grp@design-and-display.co.uk www.design-and-display.co.uk

  3. Design& Display GRP Structures case study:Gurdwara domes and decorative features Client: Sikh temples put faith in Surinder Buray Commissioned by: Reade Buray Associates Design & Display Structures Project: Gurdwara decorative Design & Display Structures has sympathetically replicated highly ornate traditional architectural symbols of the Sikh faith for two new temples located in the Midlands. architectural features The importance of these temples, known as Gurdwaras to the Sikh community, required Products: an approach that would produce an authentic finish, yet remain cost effective. The GRP Onion-shaped domes, mini experts’ stunning white mouldings have done just that. domes and oriel windows Brief Project Duration: Gurdwaras are instantly recognisable to the Sikh segments, plus a finial and the stainless steel 10 weeks community by their unique and historical architectural Khanda – the Sikh emblem. This kept tooling and features. This meant a solution that remained true to origination costs down. With both sites using the traditional forms, yet offered outstanding durability same moulds, the costs to the committee were “ and light weight. effectively halved. The challenge of accurately Solution Until recently, these structures would be formed in replicating such significant Design & Display Structures delivered the perfect reinforced concrete – a much heavier and more symbols was an exciting one, fast-track solution, with each element expertly crafted expensive option compared to GRP . in GRP . The most striking of these are the distinctive both in terms of tooling and onion-shaped domes, known as Gumuts, which The segment size and shape also meant they turning the products around span 4.75m across and stand 11m high. These could be nestled during shipping and easily were designed with historical assistance from the manhandled on site. This reduced the haulage in a short timeframe. It is Gurdwara Committee. necessary and, therefore, made the project more a perfect demonstration of environmentally friendly. GRP’s versatility, particularly Arriving on site on a just in time basis, they were assembled at ground level before being craned into Combined with fast erection times, Design & Display for fast-track construction “ place. In addition, Design & Display Structures Structures’ turnkey solution took just 10 weeks from programmes. produced 33 mini domes, each measuring 0.9m in start to finish. diameter and manufactured in one piece, plus three Managing Director, Allan Curtis oriel windows. This level of efficiency and cost saving simply isn’t possible using heavier alternatives and demonstrates Benefits why the versatile material is now the specifiers’ preferred choice for projects such as these. Each dome was produced in 12 orange-like Design & Display Structures - The Studio, Amberley, Hempstead Road, Uckfield, East Sussex TN22 1DZ T: 0844 736 5995 E: grp@design-and-display.co.uk www.design-and-display.co.uk

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend