Design Activity Update Schedule Coordination Feb 20: Cost Estimation Begins Feb 23-March 24: Internal QA/QC on 40% Design March 27: 40% Design Submittal Due April 1-30: 40% Design Approval and Next Steps Design Activity


slide-1
SLIDE 1
slide-2
SLIDE 2

Design Activity Update

  • Schedule Coordination

– Feb 20: Cost Estimation Begins – Feb 23-March 24: Internal QA/QC on 40% Design – March 27: 40% Design Submittal Due – April 1-30: 40% Design Approval and Next Steps

slide-3
SLIDE 3

Design Activity Update

  • Advancing the Design, Develop Deliverables:

– Build on the Dec 6th site plan – Drawing Development – Basis of Design (BOD) documentation – Specifications (expanded Table of Contents) – Planning the cost estimate

slide-4
SLIDE 4

Design Activity Update

Advancing the Design:

– Gate Facility Programming, Preliminary Design.

  • Project team working session (including SARA, COSA

and Bexar County) conducted on December 11, 2014

slide-5
SLIDE 5
slide-6
SLIDE 6

Purpose of Gate Structures

  • To hold back water and create a scenic cascade of

stable pools in the reach of San Pedro Creek extending from the tunnel intake structure to South Alamo Street

  • To appropriately respond to high flow events by

passing excess water downstream without increasing established pre-project flood elevations

  • To conserve and control water as appropriate
slide-7
SLIDE 7

Gate Aesthetics

  • Gates should be low profile
  • Gates should provide views and sounds of

falling water

  • Gate operating and control features should be

visually unobtrusive

slide-8
SLIDE 8

Recommendation

  • Hydraulically Actuated Steel Crest Gates Are

Recommended at Each Location

– State of the art gate systems – Used at Brooklyn Ave lock and dam – Used at modified gate six – Satisfies all SPC design criteria

slide-9
SLIDE 9

Steel Crest Gates

slide-10
SLIDE 10

Steel Crest Gates

slide-11
SLIDE 11

Steel Crest Gate

slide-12
SLIDE 12

Major System Components

  • Concrete foundation
  • Gate leaf and hinge (torque tube) system; side seals
  • Hydraulic cylinder
  • Waterproof concrete cylinder vault (concealed
  • ption)
  • Hydraulic pressure unit (HPU); lines & valves
  • Control building for HPU and PLC; HVAC,

transformer, backup power generator

slide-13
SLIDE 13

San Pedro Creek Gate Locations

  • Travis Street
  • Nueva Street
  • South Alamo Street
slide-14
SLIDE 14

Travis St. Gate Structure

slide-15
SLIDE 15

Travis St. Gate Structure

  • Looking Downstream
  • Looking Upstream
slide-16
SLIDE 16

Travis St. Gate Structure

slide-17
SLIDE 17

Nueva St. Gate Structure

slide-18
SLIDE 18

Nueva St. Gate Structure

  • Looking Downstream
  • Looking Upstream
slide-19
SLIDE 19

Nueva St. Gate Structure

slide-20
SLIDE 20
  • S. Alamo St. Gate Structure
slide-21
SLIDE 21
  • S. Alamo St. Gate Structure
  • Looking Downstream
  • Looking Upstream
slide-22
SLIDE 22
  • S. Alamo St. Gate Structure
slide-23
SLIDE 23

ART PROGRAM

slide-24
SLIDE 24

Artist Scope

  • Site tour December 22th, 2014
  • Conceptualize an overarching artistic vision
  • Assist in developing the public art program
  • Assist in curating public art and artist selection
  • Execute select portion of project public art
slide-25
SLIDE 25
slide-26
SLIDE 26

West sid e Cr eeks Rest o r at io n Over sig h t Co mmit t ee M eet in g

Tuesday, February 10, 2015

1

Signage Work Group

slide-27
SLIDE 27

Sig n ag e Types & Pr o ject s

Projects

  • Alazan/Martinez Creekway Trails
  • Elmendorf Lake Park
  • Apache/San Pedro Creekway Trails

– North Segment – South Segment

Sign Types

  • Monument / Trail Head
  • Map
  • Wayfinding
  • Interpretative
slide-28
SLIDE 28

3

M o n umen t / Tr ail H ead Sig n Exampl es

slide-29
SLIDE 29

4

M o n umen t / Tr ail H ead Sig n Exampl es

slide-30
SLIDE 30

5

M o n umen t / Tr ail H ead Sig n Exampl es

slide-31
SLIDE 31

6

M ap Sig n Exampl es

slide-32
SLIDE 32

7

Wayf in d in g Sig n Exampl es

slide-33
SLIDE 33

8

I n t er pr et at ive Sig n Exampl es