Delivering the Missing Middle UDIA, 17 th October 2019 1 About - - PowerPoint PPT Presentation

delivering the missing middle
SMART_READER_LITE
LIVE PREVIEW

Delivering the Missing Middle UDIA, 17 th October 2019 1 About - - PowerPoint PPT Presentation

Delivering the Missing Middle UDIA, 17 th October 2019 1 About Stockland 421,000 customers visit a Stockland shopping centre each day 11,900+ retirees call a Stockland retirement village home 127 families 140+ businesses move into a


slide-1
SLIDE 1

UDIA, 17th October 2019

1

Delivering the Missing Middle

slide-2
SLIDE 2

127 families

move into a Stockland community each week

160+ businesses

work in a Stockland

  • ffice building

140+ businesses

deliver goods and services from a Stockland Logistics and Business Park asset

11,900+ retirees

call a Stockland retirement village home

421,000 customers visit

a Stockland shopping centre each day

About Stockland

slide-3
SLIDE 3

How we operate

 Two main operational business units – Commercial Property and Communities  Communities caters for:  Masterplanned Communities (land)  Completed Homes  Medium Density  Apartments  Retirement Living

slide-4
SLIDE 4
slide-5
SLIDE 5

Our Approach to the Missing Middle

Our aim is to deliver projects that provide:  Quality & Value – to our Customers & Stakeholders  Liveable outcomes delivering sustainable community settings  Longevity through robust design  Healthy outcomes that promote well-being, comfort and amenity  Provide Housing Choice for our Customers  Understand and Align to Infill Housing strategies nationally

Urban Terraces: Aura, QLD The Parks: Red Hill, ACT Balgowlah, NSW Arve: Ivanhoe VIC Orion: Braybrook, VIC

slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8

WA Case Study: Terraces at Calleya

8

The Opportunity:  Diversify Masterplanned community offer (centrally located Greenfield context)  Create greater vibrancy to local Town Centre  Offer built product to our customers  Learn, test and trial Medium Density typologies – within our own landbank  Increase market reach and talk to more Customers

slide-9
SLIDE 9

WA Case Study: Terraces at Calleya

9

Project Overview:  131 Terrace Homes within wider 2,000 lot Masterplanned community  Located 1.5km from Cockburn Train Station (4 Stops to CBD)  Priced from $429,000 - $470,000  5 Floorplans (evolution from initial stages)  3/2/2 configurations; some 2/2/1  Trial of different construction methodologies

slide-10
SLIDE 10
slide-11
SLIDE 11

WA Case Study: Glendalough

11

The Opportunity:

  • Excellent location
  • High degree of surrounding Lifestyle
  • pportunities
  • Opportunity to diversify current offer- fill the

Gap

  • Significant existing trees to be retained
  • Genuine Missing Middle Medium Density
  • pportunity in a standalone site
slide-12
SLIDE 12

WA Case Study: Glendalough

Project Overview:

  • 2.8Ha site located on Rawlins St (off Powis

St), Glendalough

  • 4.5km to Perth CBD
  • 600m to Train
  • 10 mins to Beach
  • Quality education catchments
  • Easy access to Mount Hawthorn and

Leederville Village centres

slide-13
SLIDE 13

WA Case Study: Glendalough

Our Vision:

  • Canopy of Green: Significant Tree Retention

(22% Canopy)

  • A Connected micro-hood
  • Streets for Living
  • Smart Lifestyle
  • 97 Green Title Terrace homes
  • Two, Three and Four bedroom layouts
  • Double and Single car options
  • Two and Three Storey configurations

Concept Image Only

slide-14
SLIDE 14

Summary

We believe in the future of the Missing Middle:  Improve diversity of Housing Choice, tenure

  • choice. There is a gap between a House and an

Apartment  Utilisation of existing infrastructure and established community amenity  Our Medium Density Strategy is aligning to the Priorities set by Government and the principles behind Design WA  Demographic and Consumer trends say Yes  We are learning and finding opportunities within Greenfield and Brownfield locations

Calleya: Treeby, WA Terraces at Calleya: Treeby, WA Cardinal Freeman: Ashfield, NSW

slide-15
SLIDE 15

Stockland Corporation Limited ACN 000 181 733 Stockland Trust Management Limited ACN 001 900 741; AFSL 241190 As a responsible entity for Stockland Trust ARSN 092 897 348 25th Floor, 133 Castlereagh Street SYDNEY NSW 2000 Disclaimer of Liability While every effort is made to provide accurate and complete information, Stockland does not warrant or represent that the information in this presentation is free from errors or omissions or is suitable for your intended use. The information provided in this presentation may not be suitable for your specific needs and should not be relied upon by you in substitution of you obtaining independent advice. Subject to any terms implied by law and which cannot be excluded, Stockland accepts no responsibility for any loss, damage, cost or expense (whether direct or indirect) incurred by you as a result of any error, omission or misrepresentation in this presentation. All information in this presentation is subject to change without notice.