Massachusetts Water Resources Authority Deer eer I sland Pow er er Out age March 22, 22, 2016 2016 April 13, 2016 Deer I sland Thermal/ Power Plant Thermal Power Plant Station 132 (Eversource Bldg) Main Switchgear Building What Happened
SLIDE 2
SLIDE 3
- 11:02 am (during 7-13 shift)
- Control board failed at Eversource Station 385 (in South Boston)
- Caused complete power loss at Deer Island
- Plant flow 379 MGD just prior to outage
- Plant energy demand 17.0 MW
- 12.5 MW purchased
What Happened – March 22, 2016
SLIDE 4
Full Plant Power Outage Recovery V. Historical Performance
Flows returned to pre-event conditions by 12:45pm (1.75 hrs after outage) Eversource Power restored, CTG returned to Standby by 3:25 pm (4 hrs 23 minutes after outage)
SLIDE 5
- Overall Effect:
– All flows retained in Collection System – No CSOs, SSOs or raw sewage releases – Staff response excellent, minimal downtime – All flows sent to Deer Island received full treatment Post Event Assessment
SLIDE 6
- CTG 1A failed to start – later ID’d failed fuel pump
- Several control system cards failed - $7,000
- Misc. equipment failures