Massachusetts Water Resources Authority Deer eer I sland Pow er er Out age March 22, 22, 2016 2016 April 13, 2016 Deer I sland Thermal/ Power Plant Thermal Power Plant Station 132 (Eversource Bldg) Main Switchgear Building What Happened


slide-1
SLIDE 1

Massachusetts Water Resources Authority

Deer eer I sland Pow er er Out age March 22, 22, 2016 2016

April 13, 2016

slide-2
SLIDE 2

Deer I sland Thermal/ Power Plant

Thermal Power Plant Main Switchgear Building Station 132 (Eversource Bldg)

slide-3
SLIDE 3
  • 11:02 am (during 7-13 shift)
  • Control board failed at Eversource Station 385 (in South Boston)
  • Caused complete power loss at Deer Island
  • Plant flow 379 MGD just prior to outage
  • Plant energy demand 17.0 MW
  • 12.5 MW purchased

What Happened – March 22, 2016

slide-4
SLIDE 4

Full Plant Power Outage Recovery V. Historical Performance

Flows returned to pre-event conditions by 12:45pm (1.75 hrs after outage) Eversource Power restored, CTG returned to Standby by 3:25 pm (4 hrs 23 minutes after outage)

slide-5
SLIDE 5
  • Overall Effect:

– All flows retained in Collection System – No CSOs, SSOs or raw sewage releases – Staff response excellent, minimal downtime – All flows sent to Deer Island received full treatment Post Event Assessment

slide-6
SLIDE 6
  • CTG 1A failed to start – later ID’d failed fuel pump
  • Several control system cards failed - $7,000
  • Misc. equipment failures

– Air compressor – pH transmitter – Other minor items – Under $10,000 for repairs (mostly personnel time) Post Event Assessment (cont.)