December 2008 Informational December 2008 Informational Meeting Regarding the Status of Meeting Regarding the Status of Ground Water Cleanup Activities Ground Water Cleanup Activities Undertaken by Nor- -Lake, Inc. Lake, Inc. Undertaken by


slide-1
SLIDE 1

December 2008 Informational December 2008 Informational Meeting Regarding the Status of Meeting Regarding the Status of Ground Water Cleanup Activities Ground Water Cleanup Activities Undertaken by Nor Undertaken by Nor-

  • Lake, Inc.

Lake, Inc.

slide-2
SLIDE 2

Welcome! Welcome! Site Investigation and Site Investigation and Remediation Activities Update Remediation Activities Update

Chuck Dullea, President, Nor Chuck Dullea, President, Nor-

  • Lake, Inc.

Lake, Inc. James A. Anklam, PE, Ayres Associates James A. Anklam, PE, Ayres Associates Lori A. Rosemore, PG, Ayres Associates Lori A. Rosemore, PG, Ayres Associates

slide-3
SLIDE 3

History of Ground Water History of Ground Water Investigation and Remediation Investigation and Remediation Activities in the Town of Hudson Activities in the Town of Hudson

  • Junker Landfill Investigation and

Junker Landfill Investigation and Remediation Remediation

  • Town of Warren TCE Investigation and

Town of Warren TCE Investigation and Remediation Remediation

  • Nor

Nor-

  • Lake Investigation and Remediation

Lake Investigation and Remediation

slide-4
SLIDE 4

Junker Landfill Investigation and Junker Landfill Investigation and Remediation Remediation

  • Located approximately 3.5 miles east of Daily Road

Located approximately 3.5 miles east of Daily Road

  • The landfill operated for approximately 16 years

The landfill operated for approximately 16 years

  • The landfill was closed and capped in the late

The landfill was closed and capped in the late 1980 1980’ ’s s

  • The remediation system on site is an active landfill

The remediation system on site is an active landfill gas system and gas system and leachate leachate collection system collection system

  • Has documented ground water contamination

Has documented ground water contamination extending from the landfill westward extending from the landfill westward

  • Potentially co

Potentially co-

  • mingles with the Nor

mingles with the Nor-

  • Lake plume and

Lake plume and continues westward continues westward

  • Residential water supplies within the Junker

Residential water supplies within the Junker’ ’s Area s Area

  • f Concern all have carbon filter systems paid for by
  • f Concern all have carbon filter systems paid for by

the Junker the Junker’ ’s Landfill Trust s Landfill Trust

slide-5
SLIDE 5

Town of Warren TCE Investigation Town of Warren TCE Investigation and Remediation and Remediation

  • Located approximately 4.5 miles east of Daily Road

Located approximately 4.5 miles east of Daily Road

  • Discovered in 1999

Discovered in 1999

  • Investigation activities occurred in 2000, no soil

Investigation activities occurred in 2000, no soil contamination contamination

  • Remediation of ground water by injection of sodium

Remediation of ground water by injection of sodium permanganate permanganate

  • Ground water contamination extending from 80

Ground water contamination extending from 80th

th

Avenue west/northwest Avenue west/northwest

  • Potentially co

Potentially co-

  • mingles with the Junker

mingles with the Junker’ ’s plume and s plume and continues westward continues westward

  • Residential water supplies can have carbon filter

Residential water supplies can have carbon filter systems if residents pay for them systems if residents pay for them

slide-6
SLIDE 6

Nor Nor-

  • Lake Investigation

Lake Investigation and Remediation and Remediation

  • Located approximately 1 mile east of Daily Road

Located approximately 1 mile east of Daily Road

  • Discovered in the mid 1980

Discovered in the mid 1980’ ’s s

  • Documented soil contamination and elevated levels

Documented soil contamination and elevated levels

  • f trichloroethene (TCE) and other compounds in
  • f trichloroethene (TCE) and other compounds in

groundwater groundwater

  • Investigation activities occurred in late 1980

Investigation activities occurred in late 1980’ ’s until s until mid 1990 mid 1990’ ’s s

  • Ground water contamination extends from Co. Rd.

Ground water contamination extends from Co. Rd. U west/northwest U west/northwest

  • Active ground water and soil remediation systems

Active ground water and soil remediation systems

  • Residential water supplies that qualify have carbon

Residential water supplies that qualify have carbon filter systems provided by Nor filter systems provided by Nor-

  • Lake, Inc.

Lake, Inc.

slide-7
SLIDE 7

Special Well Construction Areas Special Well Construction Areas

slide-8
SLIDE 8

Nor Nor-

  • Lake: Site Investigation

Lake: Site Investigation

  • 30 monitoring wells

30 monitoring wells

  • Over 250 private wells

Over 250 private wells

  • Volatile Organic Compounds (VOCs)

Volatile Organic Compounds (VOCs) primary compound is trichloroethene primary compound is trichloroethene (TCE) (TCE)

slide-9
SLIDE 9

Nor Nor-

  • Lake: Remediation

Lake: Remediation

  • Pump and treat began 1986

Pump and treat began 1986

  • Well testing completed on RW

Well testing completed on RW-

  • 1 in 1991

1 in 1991

  • Modified ground water pump and treat

Modified ground water pump and treat began operation on November 24, 1992 began operation on November 24, 1992

  • SVE began operation on September 22, 1993

SVE began operation on September 22, 1993

  • Extensive private water supply sampling

Extensive private water supply sampling program began in 1995. Over 250 private program began in 1995. Over 250 private wells sampled. 175 carbon filters offered wells sampled. 175 carbon filters offered

slide-10
SLIDE 10

Nor Nor-

  • Lake: Pump and

Lake: Pump and Treatment Treatment System Modifications System Modifications

  • Refined pumping of RW

Refined pumping of RW-

  • 1 based on well

1 based on well testing completed in 1991 testing completed in 1991

  • Added second recovery well to increase

Added second recovery well to increase capture and remediation capture and remediation

slide-11
SLIDE 11

Nor Nor-

  • Lake: Tower Construction

Lake: Tower Construction Complete with Treatment Complete with Treatment Building Building

slide-12
SLIDE 12

Nor Nor-

  • Lake: Treatment Tower

Lake: Treatment Tower With Packing Material With Packing Material

slide-13
SLIDE 13

Nor Nor-

  • Lake: Installation of Soil

Lake: Installation of Soil Vapor Extraction (SVE) System Vapor Extraction (SVE) System

  • Extensive soils investigation beneath

Extensive soils investigation beneath plant and former drain field plant and former drain field

  • Vapor extraction system pilot testing

Vapor extraction system pilot testing

  • Design and construction of a 12

Design and construction of a 12-

  • vent

vent well system well system

  • Start

Start-

  • up in September 1993

up in September 1993

slide-14
SLIDE 14

Nor Nor-

  • Lake: Schematic of SVE

Lake: Schematic of SVE System System

slide-15
SLIDE 15

2 2-

  • tank Carbon Filtration System

tank Carbon Filtration System

  • 2

2-

  • tank system, first

tank system, first tested from 1988 to tested from 1988 to 1990 on 13 water 1990 on 13 water supplies supplies

  • Currently, 173 water

Currently, 173 water supplies are treated supplies are treated

  • Changed and

Changed and sampled annually for sampled annually for VOCs and bacteria VOCs and bacteria

slide-16
SLIDE 16

Historic Ground Water Contours Historic Ground Water Contours

Inferred fault identified by seismic data (1992). Potentially the eastern side of Hudson-Afton Horst also known as the Hasting-Lake Owen Fault.

slide-17
SLIDE 17

Nor Nor-

  • Lake Pre

Lake Pre-

  • remediation

remediation VOC Plume VOC Plume

Inferred fault identified by seismic data (1992). Potentially the eastern side of Hudson-Afton Horst also known as the Hasting-Lake Owen Fault.

Ground water contour based on 1998 Annual Report >100 ug/l TCE >50 ug/L TCE >1 ug/L TCE

slide-18
SLIDE 18

2008 VOC Plume 2008 VOC Plume

slide-19
SLIDE 19

Remediation Success Remediation Success-

  • MW

MW-

  • 6

6

(600 ft away) (600 ft away)

  • A 99.1%

A 99.1% reduction of reduction of TCE from a TCE from a pre pre-

  • remediation

remediation high of 2,400 high of 2,400 ug/L in 1992

MW-6 TCE values vs. Time

500 1000 1500 2000 2500 3000

2/18/1982 11/14/1984 8/11/1987 5/7/1990 1/31/1993 10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/2009

Date TCE Concentration (ug/L TCE

Groundwater pump and treat system start-up November 1992 SVE system start-up September 1993 Remediation systems temporarily shut down August 2005 Remediation systems re-started March 2007

ug/L in 1992

slide-20
SLIDE 20

Remediation Success Remediation Success-

  • MW

MW-

  • 9

9

(5,000 ft away) (5,000 ft away)

  • A 97.3%

A 97.3% reduction of reduction of TCE from a pre TCE from a pre-

  • remediation

remediation high high concentration concentration

  • f 71 ug/L TCE
  • f 71 ug/L TCE

in 1989 in 1989

MW-9 TCE values vs. Time

10 20 30 40 50 60 70 80 11/14/1984 8/11/1987 5/7/1990 1/31/1993 10/28/1995 7/24/1998 4/19/2001 1/14/2004 10/10/2006 7/6/2009 Date Concentration (ug/L) TCE

Groundwater pump and treat system start-up November 1992 SVE system start-up September 1993 Remediation systems temporarily shut-down August 2004 Remediation systems re-started March 2007

slide-21
SLIDE 21

Remediation Success Remediation Success-

  • Water

Water Supply Wells Supply Wells

slide-22
SLIDE 22

Remediation Success Remediation Success-

  • Daily Road Area

Daily Road Area

  • A 97.9%

A 97.9% reduction from reduction from a pre a pre-

  • remediation

remediation high high concentration concentration

  • f 100 ug/L
  • f 100 ug/L

TCE in 1986

Daily Road A rea TCE values vs. Time

20 40 60 80 100 120 2/18/82 11/14/84 8/11/87 5/7/90 1/31/93 10/28/95 7/24/98 4/19/01 1/14/04 10/10/06 7/6/09 Date Concentration (ug/L) TCE

TCE in 1986

slide-23
SLIDE 23

Remediation Success Remediation Success-

  • Wert Road Area

Wert Road Area

  • A 93.2%

A 93.2% reduction from a reduction from a pre pre-

  • remediation

remediation high high concentration of concentration of 44 ug/L TCE in 44 ug/L TCE in 1991

Wert Road A rea TCE values vs. Time

5 10 15 20 25 30 35 40 45 50 5/7/90 1/31/93 10/28/95 7/24/98 4/19/01 1/14/04 10/10/06 7/6/09 Date Concentration (ug/L) TCE

1991

slide-24
SLIDE 24

Remediation Success Remediation Success-

  • Sherman Road Area

Sherman Road Area

  • A 83.8%

A 83.8% reduction from reduction from a pre a pre-

  • remediation

remediation high high concentration concentration

  • f 3.9 ug/L
  • f 3.9 ug/L

TCE in 1991

Sherman Road A rea TCE values vs. Time

0.5 1 1.5 2 2.5 3 3.5 4 4.5 2/18/82 11/14/84 8/11/87 5/7/90 1/31/93 10/28/95 7/24/98 4/19/01 1/14/04 10/10/06 7/6/09 Date Concentration (ug/L) TCE

TCE in 1991

slide-25
SLIDE 25

Pump and Treat Performance Pump and Treat Performance

slide-26
SLIDE 26

SVE Performance SVE Performance

0.00 1.00 2.00 3.00 4.00 5.00 6.00 0.00 5000.00 10000.00 15000.00 20000.00 25000.00 30000.00 35000.00 40000.00 45000.00 50000.00

Cumulative Hours of Operation VOC Emissions (Pounds/Hours)

slide-27
SLIDE 27

Proposed Ground Water Proposed Ground Water Management (Phase 1) Management (Phase 1)

slide-28
SLIDE 28

Ground Water Management (Phase 1) Ground Water Management (Phase 1)

  • Reduction in Area of

Reduction in Area of Concern Concern

  • Reductions of

Reductions of monitoring monitoring frequency frequency

  • Reductions of

Reductions of monitoring points monitoring points

  • Reductions of filter

Reductions of filter systems systems

  • Continuation of both

Continuation of both ground water pump ground water pump and treat and SVE and treat and SVE systems systems

  • Continuation of

Continuation of monitoring well monitoring well sampling sampling

  • Additional sampling

Additional sampling

  • f select water
  • f select water

supply sentry wells supply sentry wells

slide-29
SLIDE 29

Ground Water Management Ground Water Management (Phase 1): No Changes (Phase 1): No Changes

  • Continue operation of ground water pump

Continue operation of ground water pump and treatment system and treatment system

  • Continue operation of SVE treatment

Continue operation of SVE treatment system system

  • Continue collection of ground water

Continue collection of ground water samples from ground water monitoring well samples from ground water monitoring well network network

slide-30
SLIDE 30

Ground Water Management Ground Water Management (Phase 1): Proposed Changes (Phase 1): Proposed Changes

  • Addition of sentry water supply wells to

Addition of sentry water supply wells to monitoring network monitoring network

  • Removal of approximately 60 carbon filtration

Removal of approximately 60 carbon filtration systems systems-

  • will be sampled annually for 2

will be sampled annually for 2-

  • years

years

  • Criteria for removal of filter:

Criteria for removal of filter:

– – Current TCE concentration less than 0.5 ug/L Current TCE concentration less than 0.5 ug/L – – The average of last four TCE concentrations less than The average of last four TCE concentrations less than 0.5 ug/L 0.5 ug/L

  • Discontinuation of sampling for approximately 90

Discontinuation of sampling for approximately 90 water supply wells water supply wells

  • To occur within 90

To occur within 90-

  • days of Nor

days of Nor-

  • Lake/WDNR

Lake/WDNR signed agreement signed agreement

slide-31
SLIDE 31

Beyond 2009: Proposed Beyond 2009: Proposed

  • Phase 1 to continue for two years with a

Phase 1 to continue for two years with a review by WDNR after one year review by WDNR after one year

  • Phase 2 to be proposed after one year review

Phase 2 to be proposed after one year review

  • Phase 2 may include removal of more

Phase 2 may include removal of more filtration units and further sample reductions filtration units and further sample reductions

  • Future notification of filter removals and/or

Future notification of filter removals and/or sampling changes will be sent in a letter to sampling changes will be sent in a letter to those residences that apply those residences that apply

slide-32
SLIDE 32

Contacts for Questions Contacts for Questions

  • Wisconsin Department of Natural Resources:

Wisconsin Department of Natural Resources: Patrick Collins 715 Patrick Collins 715-

  • 684

684-

  • 2914 ext. 117

2914 ext. 117 Patrick.Collins@Wisconsin.gov Patrick.Collins@Wisconsin.gov

  • Wisconsin Department of Health:

Wisconsin Department of Health: Henry Nehls Henry Nehls-

  • Lowe 608

Lowe 608-

  • 266

266-

  • 3479

3479 nehLshL@dhfs.state.wi.us nehLshL@dhfs.state.wi.us

  • Ayres Associates on behalf of Nor

Ayres Associates on behalf of Nor-

  • Lake:

Lake: Lori Rosemore 715 Lori Rosemore 715-

  • 834

834-

  • 3161

3161 rosemorel@AyresAssociates.com rosemorel@AyresAssociates.com

slide-33
SLIDE 33

Thank You! Thank You!

Questions? Questions?