David Hoggarth Strategic Rail Director Transport for the North A - - PowerPoint PPT Presentation

david hoggarth
SMART_READER_LITE
LIVE PREVIEW

David Hoggarth Strategic Rail Director Transport for the North A - - PowerPoint PPT Presentation

David Hoggarth Strategic Rail Director Transport for the North A RAILWAY FIT FOR PURPOSE While having a long - term plan is fundamental to what were trying to do, we need to make sure we are making a difference now: the longer term


slide-1
SLIDE 1

David Hoggarth

Strategic Rail Director Transport for the North

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4

A RAILWAY FIT FOR PURPOSE “While having a long- term plan is fundamental to what we’re trying to do, we need to make sure we are making a difference now: the longer term is important, but the short term is urgent.” John Cridland

slide-5
SLIDE 5

A TRANSFORMED NORTH

slide-6
SLIDE 6

Long Term Rail Strategy

A Pan-Northern Solution

  • Desirable Minimum Standards
  • Freight Opportunities
  • Better Connected Communities
  • Greater Economic Potential
slide-7
SLIDE 7

Construction & commissioning

2018/19

2018/19 2024/25 2029/30 2034/35 2039/40 Business Case Development

Co-ordinated Rail Investment

TRU HS2 NPR

Reduced Costs Transformational Full integration

slide-8
SLIDE 8

TO SCOTLAND TO SCOTLAND SHEFFIELD HULL LEEDS NEWCASTLE LIVERPOOL MANCHESTER AIRPORT MANCHESTER

1 2 4 5 6 3

TO MIDLANDS AND LONDON TO MIDLANDS AND LONDON SUNDERLAND MIDDLESBROUGH DONCASTER GRIMSBY DURHAM DARLINGTON YORK BRADFORD WAKEFIELD HUDDERSFIELD BARNSLEY CHESTERFIELD WARRINGTON TO NORTH WALES CREWE CHESTER PRESTON WIGAN LANCASTER OXENHOLME PENRITH CARLISLE

Northern Powerhouse Rail –upgraded line Northern Powerhouse Rail – new line Linking Liverpool to HS2 HS2 line TransPennine route Upgrade Existing line Northern Powerhouse Rail hub station Other significant economic centre

NORTHERN POWERHOUSE RAIL

slide-9
SLIDE 9

2030’s:

Opening of HS2 Phase 2B to Manchester and Eastern legs to Sheffield, Leeds and beyond NEXT STEPS 2018: Complete Strategic Outline Business Case

2020’s and beyond:

Construction

  • f Northern

Powerhouse Rail Infrastructure and associated schemes

slide-10
SLIDE 10

What does this mean regionally for people?

slide-11
SLIDE 11
slide-12
SLIDE 12

Integrate with HS2 and

  • ther rail schemes to

maximise benefits for the North

+

Free-up space on existing lines and local services Quadruple the number of businesses within 90 minutes of four or more major Northern Cities

90

Better connect the North’s ‘prime capabilities’ (advanced manufacturing, energy, health innovation and digital) BENEFITS Provide more capacity for passengers Bring Manchester Airport within 90 minutes reach for 3 million more people

90

slide-13
SLIDE 13

A RAILWAY FIT FOR PURPOSE “While having a long- term plan is fundamental to what we’re trying to do, we need to make sure we are making a difference now: the longer term is important, but the short term is urgent.” John Cridland

slide-14
SLIDE 14

TRANSPORT FOR THE 0161 244 0888 info@transportforthenorth.com Transport for the North Ground Floor 2nd Floor, 4 Piccadilly Place West Gate, Grace Street Manchester, M1 3BN Leeds, LS1 2RP transportforthenorth.com