Da vid J. T rimb a c h, PhD Po stdo c to ra l Re se a rc h Asso c ia te & Pro je c t Ma na g e r De pa rtme nt o f F ishe rie s & Wildlife Ore g o n Sta te Unive rsity da vid.trimb a c h@ o re g o nsta te .e du
Da vid J. T rimb a c h, PhD Po stdo c to ra l Re se a rc h Asso c - - PowerPoint PPT Presentation
Da vid J. T rimb a c h, PhD Po stdo c to ra l Re se a rc h Asso c - - PowerPoint PPT Presentation
Da vid J. T rimb a c h, PhD Po stdo c to ra l Re se a rc h Asso c ia te & Pro je c t Ma na g e r De pa rtme nt o f F ishe rie s & Wildlife Ore g o n Sta te Unive rsity da vid.trimb a c h@ o re g o nsta te .e du Ong oing Proc e ss a
Ong oing Proc e ss a nd E ffort
Sc hne idle r & Plumme r 2009, p. 1 Vo n Re is 2016, p. 1 Ha rg uth e t. a l. 2015 Cra nsto n & Bie de nwe g 2016
Ong oing Proc e ss a nd E ffort
Proje c t Obje c tive s
- Unde rsta nd ho w L
I Os func tio n (struc ture , me mb e rship, de c isio n-ma king , e tc .) a nd unde rsta nd/ inte g ra te huma n we llb e ing (a nd so c ia l da ta / sc ie nc e mo re b ro a dly) into lo c a l re c o ve ry e ffo rts.
- Inte g ra te huma n we llb e ing indic a to rs with e c o lo g ic a l
indic a to rs in L I O de c isio n-ma king (o ve ra rc hing pla nning pro c e ss), inc luding NT A de ve lo pme nt a nd sc o ring pro c e ss.
Ove rla pping Proje c t Compone nts
- Curre ntly wo rking
c lo se ly with 5 L
IOs
- F
- r c o mpa ra tive
purpo se s, the HWB
Pr
- je c t be ne fits fr
- m
par tic ipation and input fr
- m all L
IOs.
Compone nt De ta ils
Pr
- gr
ammatic (tools/ r e sour c e s)
- Mira di/ Re sults Cha ins
- Struc ture d De c isio n Ma king (Co nse q ue nc e
T a b le s)
- Ba ye sia n Be lie f Ne two rks
- Spa tia lly-e xplic it impa c t o ve rla ys
- Co st-b e ne fit a na lysis
- Be st Ava ila b le So c ia l Sc ie nc e (BASS)
- T
ho ro ug h unde rsta nding o f huma n we llb e ing indic a to rs a nd ho w the y mig ht b e inte g ra te d into lo c a l e ffo rts o r disc ussio ns
- E
PA’ s De c isio n Ana lysis fo r a Susta ina b le E nviro nme nt, E c o no my & So c ie ty (DASE E S)
Re se ar c h
- Co nduc te d b e fo re a nd a fte r Pro g ra mma tic
Co mpo ne nt
- Ob se rva tio n (me e ting s, e tc .)
- I
nte rvie ws (o pe n-/ c lo se d-e nd e d q ue stio ns)
- Co g nitive Ma pping Ac tivity
- F
re e listing a nd c a rd so rting e xe rc ise
Why this topic matte r s (br
- adly) or
what do the se goals e ntail?
- Builds upon the Par
tne r ship’s ongoing e ffor ts.
- Pr
- vide s oppor
tunitie s and r e sour c e s to be tte r inte gr ate human we llbe ing (i.e .: the Vita l Sig ns) and e c osyste m se r vic e s (spe c ific
va lue d re so urc e s) into L
IO de c ision- making (pla nning a nd
e ffo rts) via spe c ific to o ls o r stra te g ie s.
- T
his will b e de sig ne d a nd imple me nte d with e ng a g e me nt a nd input fro m L I Os the mse lve s.
- T
his is a c o mmunity-b a se d pro je c t, so it is me a nt to b e
tailor e d to L IO ne e ds and inte r e sts with an inte nde d low- impac t.
L IO Be ne fits a nd Support
- T
his pr
- je c t offe r
s: pr ac tic al tools, c apac ity, and r e sour c e s – all tailor e d to L IOs’ ne e ds and inte r e sts
- F
unding ($3,000 fo r to o ls/ re so urc e s – fa c ilita te d thro ug h OSU) a nd Mira di suppo rt funds
($20K to ta l fo r a ll L I O wo rk)
- Dir
e c t assistanc e with be tte r unde r standing and inte gr ating HWB a nd HWB Vita l Sig ns into
L I O e ffo rts.
- Island L
IO has ide ntifie d Re c r e ational She llfish Be ds and Onsite Se wage as HWB c ompone nts.
- T
his pro je c t c o uld he lp pro vide to o ls o r stra te g ie s to he lp IL
IO be tte r unde r stand and addr e ss the se c ompone nts and its c or r e sponding Vital Signs and othe r HWB Vital Signs.
- T
he pro je c t c o uld a lso he lp inte g ra te a nd b e tte r unde rsta nd the ne w HWB Sur
ve y data and findings within the IL IO loc al ge ogr aphy (de pe nding o f sa mple ).
Ne xt Ste ps
- Multi- ye ar
pr
- je c t that aims to be ne fit all L
IOs (re g a rdle ss o f pa rtic ipa tio n le ve l)
- K
ic ko ff o c c urre d in Ja nua ry 2018
- Cur
r e ntly – wor king c lose ly 5 L IOs on both pr
- gr
ammatic and r e se ar c h c ompone nts
- Re se ar
c h stage 1 is c ur r e ntly unde r way (Summe r 2018)
- Inte r
vie ws and c ognitive mapping with L IO me mbe r s (as many as possible to be tte r r e fle c t L IOs and the ir
- ngoing e ffor
ts thr
- ughout the r
e gion)
- Collabor
ate d and c onduc te d 8 inte r vie ws with IL IO
- Ne xt ste ps:
- Pr
- gr
amming (r e sour c e / tool pr
- vision – e .x.: wo rksho ps, tra ining s, e tc .) will b e g in
in Winte r 2018, fo llo we d b y re se a rc h sta g e 2 in 2019-2020 (ho pe fully with sa me individua ls a nd a ll L I Os fo r c o mpa riso n – b e fo re / a fte r)
- All L
I Os will c o ntinue to se e a nd/ o r he a r a b o ut the pro je c t mo ving fo rwa rd.
- T