customer satisfaction with a commitment from all of our companies - - PowerPoint PPT Presentation
customer satisfaction with a commitment from all of our companies - - PowerPoint PPT Presentation
In KPC we are determined to meet the highest customer satisfaction with a commitment from all of our companies associates. Together we develop, retain and sustain our assets of associates skills, engineers know-how, and
In KPC we are determined to meet the highest customer satisfaction with a commitment from all
- f
- ur
companies’ associates. Together we develop, retain and sustain our assets of associate’s skills, engineer’s know-how, and management’s determination. Thus KPC shall become an institution of bringing auto parts and assembly / inspection tooling products with top quality which are delivered on time at the most competitive costs both to domestic and overseas markets.
DATE OF ESTABLISHMENT: DATE OF INITIAL OPERATIONS:
TAYTAY PLANT VSO HEAD OFFICE PARANAQUE PLANT SANTA ROSA PLANT 1 SANTA ROSA PLANT 2
- Chassis Frame Welding
Assembly and Painting Facility
- Chassis Frame Side
Member Pipe Bending and Hole Cutting
- Welding Jig Design and
Fabrication
- Chassis Frame Assembly
and Painting Facility
- Centralized Finance and
Treasury
- Centralized Purchasing
- Centralized HRD
- Modular Assembly of
Front Suspension Module and Axel Assembly
- Established March 2007
- Address at Technology
Ave., PEZA Laguna Technopark Inc., Binan, Laguna .
- Currently used as Jig
Trial Area, having capability of welding assembly and rectification of the assembly jigs.
- Total shop floor size is
1,728 m2
President
- Mr. Eddie Jose
Finance / Treasury
- Mrs. Patricia Jayme
Jigs Design and Fabrication Director
- Mr. Tsuyoshi Ando
Marketing and Development Director
- Mr. Edward Jose
Vice President
- Mr. Naomichi Hokari
Head Consultant
- Mr. Hidehiro Arimoto
1997 1998 2007 2003 1999 2000 2001 2004 2005 2006
KPC Taytay Chassis Frame Operations (Welding Assembly & Painting) KPC Sta. Rosa Jig Fabrication Shop KPC Sta. Rosa Jig Design Department KPC Sta. Rosa Chassis Frame Operations (Welding Assembly & Painting) KPC Sta. Rosa Axel Front and Rear Assembly (Press-in & Torque Assembly) KPC Carmona Front Suspension & Brake Module Assembly (Press-in & Torque Assembly) Expansion of KPC Sta. Rosa Side Member Fabrication (Localization) Expansion of KPC Taytay Side Member Fabrication (Localization) Establishment of KPC Engineering Solutions Vietnam KPC Jig Export with Body Assembly Trial and Establishment of KPC Sta Rosa Plant 2
- 100
200 300 400 500 600
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
11 22 18 54 81 83 130 151 519 284 329
Millions (Peso)
- Expand the Design Capacity and Capabilities (C+C)
- Increase Manufacturing Capabilities
- Increase Jig Accuracy Checking Capabilities
- Strengthen Research and Development
Department
- Continuous Training of Manpower and Sustain
Skilled Associates
- Expand the Reaches of Marketing Department
- KPC continuously sends designers
and engineers to Japan for 6 and 12 months on-the-job training at Kyoei Engineering in Okayama.
- KPC established a 100% FOE
company in Vietnam to increase capacity of design and also reach the local market of Vietnam.
- KPC will hire new designers to be
trained both in Philippines and Vietnam, targeting a 30-man design team both in Philippines and Vietnam.
KPC Design Center
OT
1k 4k 3k 2k
17 DESIGNERS
7k 6k 8k 5k 9k
10 PAX
OT
KEV Design Center
FUTURE PLAN 13 DESIGNERS
OT
FUTURE PLAN 20 DESIGNERS
OT
3400 mhrs 5100 mhrs 9000 mhrs 2000 mhrs 3000 mhrs 9000 mhrs * Per month capacity
- KPC continuously train
regular and new associates in machining and related skills for jig fabrication.
- KPC will invest in new NC
machines upgrading old
- nes and later on proceed
to CAD/CAM capabilities.
- KPC will develop local sub-
contractors to support them in growth together for
- verseas projects.
KPC Manpower Capacity OT
1k 4k 3k 2k
1ST Shift 2nd Shift OT
7k 6k 8k 5k 9k
3000 mhrs 4500 mhrs 9000 mhrs
1st Shift OT OT
KPC Machine Capacity
1600 MChrs 2400 MChrs 4800 MChrs
10k 11k 12k 13k
2nd Shift
12,525 MChrs
14k
* Per month capacity
Accredited Sub Con Machine Capacity 17,325 MChrs
MITSUBISHI MOTORS PHILS. CORP. ISUZU PHILS. CORP. TOYOTA MOTORS PHILS. HONDA CARS PHILS. INC. NISSAN MOTORS PHILS. INC. HONDA PHILS. INC. SUZUKI MOTORCYCLES PHILS. SANOH FULTON PHILS. INC. MASUDA PHILS. INC. MITSUBISHI HEAVY MACHINERIES F-TECH PHILS. FORD MOTORS COMPANY PHILS. INC. KAWASAKI PHILS. IMASEN PHILS. CORP. HONDA PARTS MFG. INC. MITSUBISHI MOTORS DO BRAZIL VIETNAM MOTORS CORP. ISUZU VIETNAM CORP. VINA STAR MOTORS CORP. SUZUKI MOTORS PAKISTAN VIETINDO DAIHATSU CORP. MITSUBISHI MOTORS CORP. IRAN KYOEI ENGINEERING CO., LTD. ASTRA DAIHATSU INDONESIA YUTAKA PHILS. MFG. INC. TOYOTA BOSHUKO PHILS. INC.
Main Body Assembly Weld Jig Side Structure Assembly Weld Jig (R/L Side) Under Body Assembly Weld Jig Front Compartment Assembly Weld Jig Roof Compartment Assembly Weld Jig Front Pillar Assembly Weld Jig (R/L Side) Rear Pillar Inner Assembly Weld Jig (R/L Side) Rear Body Assembly Weld Jig Rear Side Panel Assembly Weld Jig
Floor Panel Assembly Weld Jig Front Door Inner Assembly Weld Jig (R/L Side) Rear Door Inner Assembly Weld Jig (R/L Side) Front Door Outer Assembly Weld Jig (R/L Side) Rear Door Outer Assembly Weld Jig (R/L Side) Hood Inner Assembly Weld Jig Rear Gate Inner Assembly Weld Jig Front Fender Assembly Weld Jig (R/L Side) Chassis Frame Main Assembly Weld Jig
Chassis Frame Inspection Jig Chassis Frame Distortion Repair Jig Chassis Frame Re-weld Jig
Main Body Assembly Weld Jig Under Body Assembly Weld Jig Front Body Assembly Weld Jig Front Floor Assembly Weld Jig Center Floor Assembly Weld Jig Rear Floor Assembly Weld Jig Roof Assembly Weld Jig Front Wheel House Assembly Weld Jigs (R/L Side) Fender Bonnet Fitting Gauge
Front Door Set Jig Rear Door Set Jig Trunk Lid Set Jig Trunk Lid Hinge Set Jig Panel Front Floor Under Stud Jig Roof Stud Tool Side Frame Assembly Jig RH/LH JCT-F Fender Set Jig
Main Body Assembly Weld Jig Under Body Assembly Weld Jig Front Body Assembly Weld Jig Front Floor Assembly Weld Jig Rear Floor Assembly Weld Jig Roof Assembly Weld Jig Floor Pan Assembly Jig Fender & Bonnet Set Jig Quarter Inner Assembly Jig RH/LH
Front Door Set Jig Rear Door Set Jig Trunk Lid Set Jig Trunk Lid Hinge Set Jig Panel Front Floor Under Stud Jig Roof Stud Tool Side Frame Assembly Jig RH/LH JCT-F Fender Set Jig
Rear Floor Side Assembly Weld Jigs (R/L Side) Rear Floor Assembly Weld Jig Rear Floor Pan Lower Assembly Weld Jig Rear Floor Pan Upper Assembly Weld Jig Rear Floor Re-spot Weld Jig Front Floor Assembly Weld Jig Front Floor Lower Assembly Weld Jig Front Floor Upper Assembly Weld Jig Dash Panel Assembly Weld Jig Front End Dash Assembly Weld Jig
Side Member Inner Front Assembly Weld Jigs (R/L Side) Side Member Complete Assembly Weld Jigs (R/L Side)
Side Member Inner Assembly Weld Jigs (R/L Side)
Side Member Inner Complete Assembly Weld Jigs (R/L Side)
Engine Compartment Assembly Weld Jig Side Sill Inner Assembly Weld Jigs (R/L Side) Under Body Assembly Weld Jig Under Body Re-spot Weld Jig
Cowl Top Assembly Weld Jigs (R/L Side) B-Pillar Assembly Weld Jigs (R/L Side) Package Tray Assembly Weld Jigs (R/L Side) A-Pillar Assembly Weld Jigs (R/L Side)
t
B-Pillar Outer Assembly Weld Jigs (R/L Side) Body Side Outer Assembly Weld Jigs (R/L Side)
Countries KPC Engaged in Exporting Jigs to Countries KPC is Approaching to Engage in Exports to
- Brazil
1 Project
- Vietnam
7 Projects
- Pakistan
2 Projects
- Indonesia 1 Project
- Japan
2 Projects
- Iran
1 Project
- U.S.A.
- China
- India
- Russia
- Malaysia
- Turkey
- Venezuela
- Korea
- Australia