Outage Management System Customer Partnership Group May 3 rd , 2017 OMS Customer Partnership Group Agenda Schedule Update General UI Enhancements Acceptable Use Policy Roadmap Item Ranking Open Topics Q&A Page 2 OMS


slide-1
SLIDE 1

Outage Management System Customer Partnership Group

May 3rd , 2017

slide-2
SLIDE 2

OMS Customer Partnership Group

Agenda

  • Schedule Update
  • General UI Enhancements
  • Acceptable Use Policy
  • Roadmap Item Ranking
  • Open Topics Q&A

Page 2

slide-3
SLIDE 3

OMS Customer Partnership Group

Schedule Update

OMS Enhancements Market Sim Target Date Production Target Date CIDI #189283: Unable to modify outage State transition unexpectedly updated availability (Root cause: Unfinished OMS submit process resulting in issue) N/A May 3rd, 2017 General UI enhancements

  • Expand outage view
  • Ability to select all OOS or NDC checkboxes
  • New outage summary filter and Drop down selector feature

N/A May 3rd New Enhancement – Ability to update the planned end time with the IN_OK request. N/A May 3rd, 2017

Page 3

slide-4
SLIDE 4

OMS Customer Partnership Group

Schedule Update

OMS Enhancements Market Sim Target Date Production Target Date New Duplicate ERC records published in Transmission Outage Results payload N/A June 2017 New Vacated period functionality: Availability values doubled in the vacated period screen when an outage start and end date are both modified to shorten the

  • utage.

N/A June 2017 General UI enhancements

  • Ability to select all OOS or NDC checkboxes

N/A End of May 2017 MSG Resource: Prevent plant level availability values to be entered N/A End of June 2017 Allow entering ERC on SERIES COMPENSATORS N/A End of June 2017 General UI enhancements

  • New outage summary filter
  • Drop down selector feature

N/A End of June 2017

Page 4

slide-5
SLIDE 5

OMS Customer Partnership Group

General User Interface Enhancements

  • 1. Outage Summary Screen

– Ability to filter by Nature of Work

  • 2. Outage View

– Expand availability grid to display 10 rows – Ability to select all “OOS” or “NDC” select boxes

  • 3. Modify drop down selector

– Add ‘X’ to delete current selection

Page 5

slide-6
SLIDE 6

OMS Customer Partnership Group

Acceptable Use Policy

For service consumption, the ISO has the following acceptable use agreement. For each identity and service, the consumer shall invoke the service no more often than once every 5

  • seconds. ISO production services may only be

consumed for production purposes.

Page 6

slide-7
SLIDE 7

OMS Customer Partnership Group

Acceptable Use Policy

Service Level Agreement

Expected size of payload (average and maximum)

Variable (1KB to 1MB+)

Expected frequency (average and maximum)

On demand (50/day – 1,000/day).

Longest time the service can be unavailable before business is impacted

30 minutes

Business impact if is unavailable

Outage Coordinators can call the ISO directly with critical near-term outages.

Expected response time for the service

Variable (.1 sec – 30 sec)

Expected time to exchange

Variable (.1 sec – 30 sec)

Page 7

Enforcement of the AUP will be applied for each service per certificate user.

slide-8
SLIDE 8

OMS Customer Partnership Group

Acceptable Use Policy

Next Steps:

  • CAISO will enable AUP for MAPStage in the next week
  • Limited to OMS API Retrieves only

– Not API Submits and not UI traffic

  • The limit which will be enforced initially will be one

transaction, per certificate, per service every 5 seconds in MAPStage

Page 8

slide-9
SLIDE 9

OMS Customer Partnership Group Roadmap Summary

Page 9

Roadmap Item Description

Transmission/Generation: Allow state change to IN_OK and outage end time in one transaction Enhancement to end an outage and return equipment to service in one transaction instead of two. Generation: Master file ramp rate changes Currently a MF ramp rate change on a resource will cause any outages on that resource to become invalid. Enhancement so MF change to ramp rate should only cause outages with NoW of RAMP_RATE to become invalid. Generation: Outages on intertie resources Update RA data processing to allow effective dated RA

  • values. Participants will utilize these values for outages on
  • interties. Intertie resources utilize RA MW value as PMax

for outage submission/modification. Generation: Overlapping PMin re-rates Currently only one Pmin outage can be entered on a resource at a time. Enhancement to allow multiple Pmin

  • utages to be entered at the same time.

Transmission/Generation: Broadcast version updates CAISO to broadcast when an outage is updated and a new version is created within the OMS system. Transmission: Trumping Allows the system to apply the switch configuration of an

  • utage if its priority trumps one or more existing outages.
slide-10
SLIDE 10

OMS Customer Partnership Group Roadmap Item Ranking

Page 10

Roadmap Item Ranking Target

Transmission/Generation: Allow state change to IN_OK and

  • utage end time in one transaction

1 Target: 2017 Generation: Master file ramp rate changes 2 Target: 2017 Generation: Outages on intertie resources 3 Target: 2017 Generation: Overlapping PMin re-rates 4 ISO Review Transmission/Generation: Broadcast version updates 5 Target: TBD Transmission: Trumping 6 Delayed Generation: Overlapping AS Outages 7 ISO Review

slide-11
SLIDE 11

Page 11

OMS Customer Partnership Group Wrap Up

  • Open Topics Q&A

Join us for the next customer partnership group call on June 7. Check ISO’s public calendar for participation details. Please note: The July 5 call will be rescheduled to July 12. More information will be provided in a forthcoming market notice.

slide-12
SLIDE 12

OMS Customer Partnership Group NERC Standard IRO-017: Overview

  • NERC Reliability Standard to ensure outages are

coordinated in the Operations Planning time horizon.

  • New coordinated outage process for ISO to submit
  • utages to Peak Reliability Coordinator (RC)
  • New outage characteristics

– RC Outage Priority – RC Outage State

Page 12

slide-13
SLIDE 13

OMS Customer Partnership Group NERC Standard IRO-017: ISO Impact

  • No change to ISO defined Planned or Forced outages
  • No change to existing Nature of Works
  • No change to web services
  • Outage summary will include two new fields

– RC Outage Type – RC Outage State

  • Update to the requested submission time of outages

Page 13