CONTRACTOR PERFORMANCE Draft Sunset Rule Changes May 24, 2018 - - PowerPoint PPT Presentation
CONTRACTOR PERFORMANCE Draft Sunset Rule Changes May 24, 2018 - - PowerPoint PPT Presentation
CONTRACTOR PERFORMANCE Draft Sunset Rule Changes May 24, 2018 Sunset Bill (SB 312) Contractor Performance Imp mprovem emen ents focus on ensuring c communicat ation and accountability Liq iquid idated D Dam amag ages Contract
May 24, 2018
Sunset Bill (SB 312) – Contractor Performance
2
Liq iquid idated D Dam amag ages
- Schedule for Liquidated
Damages (LDs) that includes administrative and road user costs
- Significant project defined
- Project-specific LDs for
significant projects that accurately reflect the costs
Contract ctor E Evaluation
- Evaluation form – quality,
safety, timeliness
- At least annually/ project
completion
- Division averages scores for
portfolio of contractor’s projects
- Corrective Action Plan (CAP) if
average score below threshold
- If fail to meet CAP, goes to
Performance Review Committee (PRC)
- Default or major failure may
result in immediate referral to PRC
Contract R Remed emedies
- Updating potential remedies
in specifications and contract administration manual (CCAM)
- Triggers established for review
by Performance Review Committee [Default, Failure to meet Project Recovery Plan]
- Performance Review
Committee may recommend reducing bid capacity, prohibit from bidding on a project, temporary suspension from bidding
Imp mprovem emen ents focus on ensuring c communicat ation and accountability
May 24, 2018
Performance Review Committee
- Contractor Evaluation Workgroup established the Performance Review
Committee to address performance issues based on quality, safety, and timeliness
- Performance Review Committee has the authority to make the following
5 recommendations: – Take no action – Reduce the contractor’s bidding capacity – Prohibit the contractor from bidding on one or more projects – Immediately suspend the contractor from bidding for a specified period – Recommend that the Commission not award contract to contractor
3
May 24, 2018
Key Requirements Met
The f followi wing ke key requi uire rement nts were m met i in est establis ishin ing these se proposed sed rules: es:
included criteria for identifying projects that have a significant impact
- n the traveling public
ensured contractual provisions providing for the consideration of sufficient time established communication channel to consider any events outside a contractor’s control before assessing a penalty against the contractor included criteria for the use of the evaluations by the department to address contractor performance problems provided a process for contractors to appeal the contractors’ evaluations