pennsylvania
DEPARTMENT OF TRANSPORTATION
LOCATION MAP
SCALE IN MILES
0.75 1.5
- LEGEND
PROJECT LOCATION
- TOWNSHIP ROAD
STATE HIGHWAY
- PRELIMINBRY
SR 3030, SECTION A 10
CDR MACjUIRE
BRIDGE REPLACEMEOT PROJFCT
Q;;
couN7Z
- U]
- STREAM/WATERWAY
TOWNSHIP LINE RAIL ROAD
RD
I
PROJECT LOCATION
Project Details
The SR 3030-A 10 project is located in Hempfield Township, Westmoreland County. The bridge replacement project is currently in the final stages of preliminary design. Construction is planned for June of 2022 and will last approximately two construction seasons. The majority of the project will be completed under vehicular traffic over three phases. During that time, traffic will be maintained using travel lanes with restricted lane widths along SR 3030. The new structure spanning SR 0030 will be a single span, composite 48" X 30" prestressed concrete adjacent box beam superstructure.
Contacts
Any concerns or questions can be directed to the following: Joseph A. Sasso, P.E., P.T.O.E. CDR Maguire, Inc. Project Manager 503 Martindale Street, Suite 610 Pittsburgh, PA 15212 Joseph.Sasso@cdrmaguire.com 412-235-9474 Joshua Zakovitch, P.E. PennDOT Project Manager 825 N. Gallatin Avenue Ext. Uniontown, PA 15401 jzakovitch@pa.gov 724-439-7377