Bridge Owners Forum 21 st January 2014 Huw Davies National Cycle Network Director Paul Thomas Bridge Engineer Sustrans Railway Paths Limited (RPL) Connect 2 Connect 2 Bath 2 Tunnels Bath 2 Tunnels The Sustrans and RPL Bridges


slide-1
SLIDE 1
slide-2
SLIDE 2

Huw Davies National Cycle Network Director Paul Thomas Bridge Engineer Sustrans Railway Paths Limited (RPL)

Bridge Owners Forum 21st January 2014

slide-3
SLIDE 3

Connect 2

slide-4
SLIDE 4

Connect 2

slide-5
SLIDE 5

Bath 2 Tunnels

slide-6
SLIDE 6

Bath 2 Tunnels

slide-7
SLIDE 7

The Sustrans and RPL “Bridges” Team

Paul Thomas John Litt

slide-8
SLIDE 8

How Many Structures?

  • These include viaducts, tunnels, bridges, culverts,

abutments and retaining walls

  • Some have walking and cycling paths, some don’t

Eng / Scot / Wales RPL 710 Sustrans 430 Total 1140

slide-9
SLIDE 9

Overview

In general our structures date from the period of the expansion of the railways (100 to 150 years old) Mostly

  • Brick and masonry arch
  • WI and steel beam

Some

  • RC decks (replacements)
  • Timber footbridges

None

  • Suspension bridges
  • Cantilever bridges
slide-10
SLIDE 10

The viaducts – 71 no.

  • Larpool
slide-11
SLIDE 11

Viaducts cont.

  • Larpool
slide-12
SLIDE 12

Listed Structures – 33 no.

Thornton Lee Moor Vauxhall

slide-13
SLIDE 13

Tunnels – 18 no.

  • Devonshire, Clydach, Tid
slide-14
SLIDE 14

Curios

slide-15
SLIDE 15

Structures – Managing decline

Overbridge Underbridge Our fortunate position – our underbridges generally have large reserves

  • f strength.

We manage the decline of underbridges and concentrate resources

  • n overbridges that carry the public highway.
slide-16
SLIDE 16

Inspections

Inspections

  • Routine / visual inspection

every year

  • Principal / detailed inspection

every 6 years (or less)

  • Special Inspection

as necessary Risk assessment (with principal inspections)

  • Scour and flooding
  • Tunnels
  • Culverts
slide-17
SLIDE 17

Challenges

  • Scour and flood related damage
  • Listed viaducts
  • Overbridges supporting the public highway
  • Remote culverts