complete streets project
play

Complete Streets Project Community Meeting #2 February 11, 2016 - PowerPoint PPT Presentation

King Street Complete Streets Project Community Meeting #2 February 11, 2016 Project Overview King Street resurfacing this summer Complete Streets policy Community Meeting #1 in November 2015 Tonight: Present options and get


  1. King Street Complete Streets Project Community Meeting #2 February 11, 2016

  2. Project Overview • King Street resurfacing this summer • Complete Streets policy • Community Meeting #1 in November 2015 • Tonight: Present options and get feedback Project Goals • Provide facilities for people who walk, bike, ride transit or drive cars • Improve the safety and convenience for all street users • Implement City Council adopted plans and policies 3

  3. Project Limits: Radford St. to Janney’s Ln. 4

  4. Summary - What we heard What We Heard Difficult to cross King Street Pedestrian safety concerns near school Vehicle speeds along King Street are high Street crossings are long Not enough time to cross at lights Unsafe for people who bike Difficult to access bus stops Improvements needed at intersections Need to change character of the roadway 5

  5. Proposed Options 1. Complete Street Maintenance 2. Pedestrian and Accessibility Intersection Enhancements 3. Complete Street Corridor Improvements *Tradeoffs and Balances!!! 6

  6. King Street Existing Conditions 7

  7. Option 1: Complete Street Maintenance • Improve curb ramps • Install crosswalks along side streets • Provide ADA compliant bus stops 8

  8. Option 1: Considerations • No major change to roadway • Minimal pedestrian improvements • No bicycle or vehicular improvements 9

  9. Option 2: Pedestrian & Accessibility Intersection Enhancements • Remove westbound travel lane and install left turn lanes • Provide pedestrian & streetscape improvements at intersections • Improve pedestrian crossings at bus stops 10

  10. Option 2: Considerations • Westbound travel time along corridor increases by 13s in AM peak (11s in PM peak) • Change character of roadway at intersections • No improvements for people who bike 11

  11. Option 2 Corridor Concept Existing Option 2 12

  12. Typical Intersection – Option 2 13

  13. Option 3: Complete Street Corridor Improvements – Radford Street to Chinquapin Drive (Section 1) • Remove westbound travel lane • Provide westbound bike lane (to Kenwood Avenue) and east bound shared lane in front of school • Provide left turn lane into school at Kenwood Avenue • Provide left and right turn lane at Chinquapin Drive 14

  14. Project Limits: Radford St. to Janney’s Ln. Section 1 Section 2 15

  15. Option 3: Complete Street Corridor Improvements – Chinquapin Drive to Janneys Lane (Section 2) • Remove one travel lane in each direction and provide left turn lanes • Provide pedestrian & streetscape improvements at intersections • Improve pedestrian crossings at bus stops • Install buffered bike lanes 16

  16. Option 3: Considerations • Eastbound travel time increases by 7s in the AM peak (3s in PM peak) • Westbound travel time increases by 13s in AM peak (11s in PM peak) • Provides separation between vehicles and sidewalk • Provides designated space on street for all users for most of corridor • Changes character of the corridor • Provides major pedestrian improvements at Kenwood Avenue for increased safety at school 17

  17. Option 3 Corridor Concept: Section 2 Existing Complete Street Option 18

  18. Typical Section 2 Intersection – Option 3 19

  19. Option 3 Corridor Concept: Section 1 20

  20. Option 3 Corridor Concept: Section 1 21

  21. Typical Intersection improvements • With option 2 & 3, “typical” improvements can be made to the following intersection: • Albany, Quincy and Tuckahoe • Improvements Include • Planted pedestrian refuge island • High visibility crosswalk • Left turn lane 22 Stevenson Avenue, Alexandria

  22. Lane Reduction Options 2 & 3 • Potential improvements with options 2 & 3 • Change to overall character of roadway • Pedestrian refuge islands and new crosswalks at intersections with bus stops (6) • Major pedestrian improvements at: Kenwood Avenue • Scroggins Road • Melrose Street • • Left turn bays/ center turn lane • Reduced speeds with speed indicator signs 23

  23. What could it look like? SAMPLE 24 BEFORE AFTER

  24. Major Intersection Improvements • Kenwood Avenue • Scroggins Road • Melrose Street 25 *No bicycle or pedestrian crashes reported

  25. Kenwood Avenue Concept Remove left turn from King to • Kenwood Provide pedestrian refuge islands • on King and Kenwood Change lane designation on • Kenwood Provide LPI for pedestrians at • intersection Relocate bus stop to far side of • intersection 26

  26. Melrose Street Concept Provide pedestrian refuge • island on King Provide RFP (Rapid Flashing • Beacon) for crossing of King Relocate bus stop to far side • of intersection Provide ADA curb ramps and • bus stops Provide left turn lanes • 27

  27. Scroggins Road Concept Provide pedestrian refuge • island on King Street Provide SB left turn lane • Extend curb on Scroggins Rd. • to normalize intersection Provide temporary materials • to realign right turn onto Scroggins Rd. and remove slip lane 28

  28. Option Matrix What We Heard Complete Street Pedestrian & Complete Street Maintenance Accessibility Corridor Intersection Improvements Enhancements Difficult to cross King Street Pedestrian safety concerns near school Vehicle speeds along King Street are high Street crossings are long Not enough time to cross at lights Unsafe for people who bike Difficult to access bus stops Improvements needed at intersections Need to change character of the roadway 29

  29. Polling Question 1. Do you live on King Street or an adjacent side street? (choose one) 1. Yes 2. No 55% 45% No Yes

  30. Polling Question 2. Other than your place of residence, what is your main destination on King Street? (choose 1) 68% 1. School/Daycare 2. Place of Worship 3. Recreation Center/Park 4. Work 5. Social 6. No destinations 11% 11% (I use King Street to travel elsewhere ) 5% 5% 0% 1. 2. 3. 4. 5. 6.

  31. Polling Question 3. What are your top priorities for a Complete King Street? (choose 3) 1. Improve pedestrian safety near TC Williams 27% 2. Reduce vehicular speeding 3. Provide safer crossings for pedestrians 21% 4. Provide more accessible transit stops 5. Provide a safe and accessible bicycle facility 13% 13% 13% 6. Provide greater separation between vehicles and pedestrian 6% 6% 7. Maintain comparable travel times for drivers 1. 2. 3. 4. 5. 6. 7.

  32. Polling Question 4. What intersection safety improvements are most important to you? (choose all that apply) 40% 1. Safer & shorter street crossings 2. Planted pedestrian islands 3. Left turn only lanes 21% 19% 4. Slower speeds of turning vehicles 17% 5. None — not in favor of any improvements 2% 1. 2. 3. 4. 5.

  33. Polling Question 5. What intersections are in need of the most improvement? (choose 3) 1. Janney’s Lane 2. Melrose Street 27% 24% 3. Albany Avenue 4. Tuckahoe Lane 16% 5. Scroggins Road 14% 12% 6. Quincy Street 6% 7. Chinquapin Drive 2% 8. Kenwood Avenue 0% 0% 9. Radford Street 1. 2. 3. 4. 5. 6. 7. 8. 9.

  34. Option 1 Complete Street Maintenance Option 2 Pedestrian & Accessibility Intersection Enhancements Option 3 Complete Street Corridor Improvements

  35. Polling Question 6. What option do you prefer? (choose 1) 70% 1. Option 1: Complete Street Maintenance 2. Option 2: Pedestrian Accessibility Intersection Enhancements 3. Option 3: Complete Streets 15% 10% Corridor Improvements 5% 4. Other: (I will submit a comment form) 1. 2. 3. 4.

  36. Next Steps • Alex Engage – Community Feedback on options • Public Meeting #3 – Proposed Design • Traffic and Parking Board – Public Hearing Hillary.Orr@AlexandriaVA.gov 40

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend